Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.8 LAccepted-Finance 11 126 GWAL TOLI KANPUR | KANPUR | KANPUR | UTTAR PRADESH | ₹9.8 L | 1 | Accepted-Finance L-1 |
| 2 | 2₹9.9 L+₹1,292.79 (0.13%)Rejected-Finance HOUSE NO 95 26 HALIM COMPOUND PEACHBAG KANPUR | KANPUR | UTTAR PRADESH | ₹9.9 L+₹1,292.79 (0.13%) | 2 | Rejected-Finance L-2 |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹9.9 L
EMD Value
₹99,446
Closing Date
15 Jul 2026, 3:00 pmClosed
CHIEF ENGINEER, KMC
Motijheel
Improvement of Road From Kisan Majdoor School to Mosin bhai at Jajmau in ward 96 Under Zone-02
2026_NNKAN_1166037_1
659/AA-2/25-26
Open Tender
Civil Works
Fixed-rate
45 days
zone 2
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹99,446
18 Jul 2026
3 Jul 2026
15 Jul 2026
3 Jul 2026
15 Jul 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W filling or ion embankment in ordinary soil exavation to be done pits not exciding 1.5m including all completion of work. | - | cum | 125 | - |
| 2 | P/L Spreading Compacting graded stone aggreate to wet mix Macadam specification including premixing the material by tipper to site laying in uniform layers with pavers in sub base course on well prepared surface and compacting with vibratory roller including all labour materia T&P | 0.59 | cum | 3,847 | ₹2,277.42 |
| 3 | p/A tack Coat with bitumen 80/100 PRESSURE DISTRIBUTER @ 0.20 KG/SQM etc all work. | 1,020 | sqm | 18 | ₹18,360 |
| 4 | Denge Graded Bituminous Macadam (DGBM) P/L dense graded bituminous macadam with 60-90 THP Type HMP producing an average output of 75 tonnes per hour crushed aggregates of specified grading premixed with bitumixed binder @4.5% by weight of total mix and filler transporting the hot mix to work site laying with hydiostatic paver finisher with sensor control to the required grade level and alignment rolling with smooth wheeled vibratory and random rollers to achieve the desired compaction as per MORTH Specification clause NO 507 complete in all respect. | 1 | MT | 4,940 | ₹4,939.95 |
| 5 | P/A Bituminous concret with computrised HMP type proucing and average output of 75 tones per hrs crushed aggregates of specipied grading premixed with biyuminour binder (CRMB) 5.4 @ PERCENT OF MIX etc all complete work. | 1 | MT | 5,510 | ₹5,509.99 |
| 6 | Painting of pavement with thermoplastic making paint in center line, side line, stop line Zebra line etc. | 36 | sqm | 427.2 | ₹15,379.2 |
| 7 | Providing And fixing of reflective road fixtures. Cats eye type IZ-ASTMD-4956-04 etc all complete. | 48 | Nos | 325 | ₹15,600 |
| 8 | Providing and fixing of reflective road fixtures. Soller Cats eye type IZ-ASTMD-4956-04 etc all complete. | 30 | cum | 2,695 | ₹80,850 |
| 9 | Add 18% G.S.T | 1 | tax | 1,51,696.56 | ₹1,51,696.56 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.31 MB
BOQ_2187047.xls
BOQ • 0.29 MB
100stamp.pdf
Tender Documents • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .