| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-Finance | ₹1.0 Cr | L1 | Accepted-Finance Accepted |
| 2 | L2₹1.1 Cr+₹11.2 L (11.2%)Accepted-Finance 248 1 CHHEDIPURWA STATION ROAD BEHIND GURU NANAK SCHOOL GONDA UTTAR PRADESH 271001 | GONDA | UTTAR PRADESH | 271001 | ₹1.1 Cr+₹11.2 L (11.2%) | L2 | Accepted-Finance Accepted |
| 3 | L3₹1.2 Cr+₹17.1 L (17.1%)Accepted-Finance | ₹1.2 Cr+₹17.1 L (17.1%) | L3 | Accepted-Finance Accepted |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.0 Cr
EMD Value
₹1.0 L
Closing Date
28 Jul 2023, 5:00 pmClosed
se edc
sonbhadra
Jal Jivan Mission Electrification Work
2023_PVVNV_819708_1
53/edc(so)/2023-24
Open Tender
Electrical Works
Item Rate
90 days
sonbhadra
Pleased Ref Tender Doc.
2 documents required · 2 mandatory
₹5,900
SE EDC SONEBHADRA Bank A/c No.089105000853
₹1.0 L
11 Aug 2023
12 Jul 2023
29 Jul 2023
12 Jul 2023
28 Jul 2023
12 Jul 2023
Amount
33KV/11KV Line And 10MVA TF(Additional) Water Supply scheme (Patwadh gram samuh payjal yojna ) At substation 33/11KV salkhan
CENTRALIZED MATERIALS
10 MVA 33/11 KV transformer
33KV VCB with single T/f control panel &CT 200/100/1A with structure (1). 33KV VCB (2). control panel I/C for 33KV single T/F (3). CT 200/100/1-1A (4). Steel structure for above
600/300/5A,350MVA I/C 11KV VCB panel
200/100/5A Outgoing 11KV VCB panel
Bus coupler 350 MVA
11 KVXLPE cable 300sqmm
11 KVXLPE cable 3x185sqmm
33 KV pin insulator
33kv pin with nut
ACSR dog conductor
Supply of DE-CENTRALIZED MATERIALS (Provided By Contactor)
33 KV bus isolator with Structure
33 KV post insulator with Structure
Transformer bus bar complete with stucture
33 KV lightning arrestor with Structure
90 lbs rail pieces (44.64 kg/M)
33 kv VCB with Structure
11KV cable jointing kit outdoor 3x185sqmm
Control cable 4x2.5sqmm
Control cable 2X2.5sqmm
Control cable 6x2.5sqmm
24 volt battery &battery charger with cabinet (1). 12 volt lead acid battery 2no. (2). 24 volt battery charger 01 no.
33KV line isolator with Structure
PG Clamp for DOG
G.I.Pipe 6"Dia
Various type nut &bolts
Earthing of transformer body & neutral
Sundries
Work of following materials as per RESPO/PuVVNL norms at the work site.
Materials & Making of Plinth, and resetting on new plinth including complete work for Establishment of 10 MVA T/F .
Erection and Installation of 33 kV VCB and its control panel for single transformer and installation of 200/100/1 Amp CT.
Erection and Installation of 600/300/5A,350MVA I/C 11KV VCB panel.
Erection and Installation of 200/100/5A Outgoing 11KV VCB panel.
Erection and Installation and making connection with old 11 KV control Pannel to Bus coupler 350 MVA.
Errection Earthing of transformer body & Delta neutral
Laying &Termination from T/F to 11 KV Incoming Pannel by 11 KV XLPE Cable 300 sq.mm. Digging of trench size 0.75x75 mtr & putting layer of sand of bottam & laying of cable covering the trench from sites top by laying bricks finely cover the same by earth.
Laying &Termination from 11 KV Outgoing Control Pannel to Double Pole by 11 KV XLPE Cable 185 sq.mm. Digging of trench size 0.75x75 mtr & putting layer of sand of bottam & laying of cable covering the trench from sites top by laying bricks finely cover the same by earth.
Laying, spreading, lifting and final sagging of 3 phases of ACSR Dog conductor for Makinng Bus Bar.
Installation of bus isolator for 33 kV voltage and construction of steel structure for the same and Digging of Pit, Grouting of Steel Structure and Making Connection to Earthing Mat.
Installation of Post isolator for 33 kV voltage and construction of steel structure for the same and Digging of Pit, Grouting of Steel Structure, and Making Connection to Earthing Mat.
Installation of Line isolator for 33 kV voltage and construction of steel structure for the same and Digging of Pit, Grouting of Steel Structure, and Making Connection to Earthing Mat.
Installation of lightning arrestor for 33 kV voltage and construction of steel structure for the same and Digging of Pit, Grouting of Steel Structure and Making Connection to Earthing Mat and one individual Earthing Connection from lightning arrestor
Installation of VCB for 33 kV voltage and construction of steel structure for the same and Digging of Pit, Grouting of Steel Structure and Making Connection to Earthing Mat.
Making Joint by 11KV cable jointing kit outdoor 185sqmm
Making of 11 KV cable boxes(300sqmm) mounted with sweatchgears &transformer
Laying &Termination Control cable 4x2.5sqmm, 2X2.5sqmm 6x2.5sqmm
Earthing of transformer body & neutral
Earthing of LA
Earthing of indoor equipment
Painting of S/S structure
24 volt battery &battery charger with cabinet (1). 12 volt lead acid battery 2no. (2). 24 volt battery charger 01 no.
11 KV HT Line/ feeder of GLR-1 at village Bhabhaich, Water Supply scheme (Patwadh gram samuh payjal yojna ) Emerging At substation 33/11KV salkhan
CENTRALIZED MATERIALS
ST Pole 11 Mtr. Long
3x120 sq mm. 11 kv XLPE cable
11K.V. Disc Insulator
11 kv disc fitting
11K.V.Pin with nut
11K.V.Pin Insulator
A.C.S.R Weasel Conductor
stay loop insulater
3 PHASE 4 WIRE STATIC TV METER 11KV
11 KV PILFER PROOF METERING CUBICAL CT 150/5Amp
11 KV CT/PT Metering pole Mounted unit 150/5 Amp
Supply of DE-CENTRALIZED MATERIALS (Provided By Contactor)
Top Channel MS 100x50x2240 mm Long
M.S. Channel 125x65x1300 mm (T-off)
M.S.Channel Dropper100x50x6mm 2028mm Long
X Arm M. S. Angle V-Type
stay wire 7/8 swg
Stay Complete
Earthing Complete
GS/GI Earth wire 6swg
Cross bracing M.S. Angle
GI wire 8swg for guarding
3x120 sq mm.11 kv cable jointing kit
11 KV TPMO
PG Clamp For Conductor with Nut & Bolt
MS angle for guarding
MS angle 75x75x2028MM Long(cvt base)
Cross Arm Holding Clamp With Nut & Bolt
Danger Board With Nut & Botlts
Stone Pade (300x300x75)mm
Barbed Wire
Top ,T- Off & Cross Brassing Asngle Clamp With Nut & Bolt
F Bracket
Nut & Bolt with washer
Number Plate with clamp
Work of following materials as per RESPO/PuVVNL norms at the work site.
Erection of Single pole structure on 11 mtr. ST Pole including all works of excavation of pit, pole erection, grouting in the ratio 1 : 4 : 8 (cement, sand, 40mm brick ballast) back filling of earth, proper ramming & fitting of all accessories ('V' type cross arm clamps with bolt and nut, Channel-bracket, composite polymer pin, insulator, danger board with clamp, Pole no. painting,earthing, barbed wire, painting of pole with painr, making of plinth around ST Pole etc. complete)
Erection of Double Pole structure on 11 mtr. ST Pole including all works of evocation of pit, pole erection, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast),back filling of earth ,proper ramming & fitting of all accessories For Single Circuit (M.S. angle iron bracing with clamps, top channel with clamps, disc insulator T & C type, disc fitting T & C type, composite polymer pin, insulator, P.G. Clamp, 'E' bracket, danger board with clamp,pole no. painting, barbed wire earthing, grouting of Stay Rod including all work as per norms etc. complete).
Grouting of Stay Rods (16 x 1800) mm including all work of excavation, cement concrete in size (0.60 x 0.60 x 0.30) m in ratio 1:4:8 cement, sand, 40mm brick ballast) as per drg including back filling, proper ramming etc. Fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing.
Guarding between two poles (Span) like single poles, double poles, four poles, etc. to guard LT, 11 KV Line telephone and river crossing, road crossing etc. with G.I. wire no. 6 SWG and G.I. wire no. 8 SWG, including supply, cutting, fabrication and fixing of guarding channel 75 x 40 x 3010 mm with clamps nut & bolts etc. as per drawing.
Chopping of branches of trees along the route of the line and disposal of the same at suitable place.
Laying, spreading, lifting and final sagging of 3 phases of ACSR Weasal conductor in accordance with profile and sag chart including binding, Jumpering and fixing of P.G. Clamp as per requirement in 03 Nos. conductor in parallel.
Fixing of T-off Channel with clamp including related items
Other small works to complete the line as per requirement.
Hard Rock broken
Bounding of Barbed wire with Denger Board at PCC/ST Pole
11 KV 3x120 sq.mm. XLPE Cable Laying Digging of trench size 0.75x75 mtr & putting layer of sand of bottam & laying of cable covering the trench from sites top by laying bricks finely cover the same by earth.
Making 11 KV Cable Jointing Kit with 11 KV 3x120 sq.mm.
Installtion of 11 KV PPMC, 3 Phase 4 wire static TV Meter & CT/PT Unit
11 KV 3x120 sq.mm. XLPE Cable Laying between PPMC & 11 KV CT/PT Metering Pole mounting unit, Digging of trench size 0.75x75 mtr & putting layer of sand of bottam & laying of cable covering the trench from sites top by laying bricks finely cover the same by earth.
11 KV HT Line/ feeder of GLR-2 at village Rudwali, Water Supply scheme (Patwadh gram samuh payjal yojna ) Emerging At substation 33/11KV salkhan tapped on Salkhan feeder
CENTRALIZED MATERIALS
ST Pole 11 Mtr. Long
3x120 sq mm. 11 kv XLPE cable
stay loop insulater
3 PHASE 4 WIRE STATIC TV METER 11KV
11 KV PILFER PROOF METERING CUBICAL CT 150/5Amp
11 KV CT/PT Metering pole Mounted unit 150/5 Amp
Supply of DE-CENTRALIZED MATERIALS (Provided By Contactor)
Top Channel MS 100x50x2240 mm Long
M.S. Channel 125x65x1300 mm (T-off)
M.S.Channel Dropper100x50x6mm 2028mm Long
stay wire 7/8 swg
Stay Complete
Earthing Complete
GS/GI Earth wire 6swg
Cross bracing M.S. Angle
3x120 sq mm.11 kv cable jointing kit
MS angle 75x75x2028MM Long(cvt base)
Danger Board With Nut & Botlts
Stone Pade (300x300x75)mm
Barbed Wire
Top ,T- Off & Cross Brassing Asngle Clamp With Nut & Bolt
Nut & Bolt with washer
Number Plate with clamp
GI Pipe 6" Dia
Work of following materials as per RESPO/PuVVNL norms at the work site.
Erection of Single pole structure on 11 mtr. ST Pole including all works of excavation of pit, pole erection, grouting in the ratio 1 : 4 : 8 (cement, sand, 40mm brick ballast) back filling of earth, proper ramming & fitting of all accessories ('V' type cross arm clamps with bolt and nut, Channel-bracket, composite polymer pin, insulator, danger board with clamp, Pole no. painting,earthing, barbed wire, painting of pole with painr, making of plinth around ST Pole etc. complete)
Erection of Double Pole structure on 11 mtr. ST Pole including all works of evocation of pit, pole erection, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast),back filling of earth ,proper ramming & fitting of all accessories For Single Circuit (M.S. angle iron bracing with clamps, top channel with clamps, disc insulator T & C type, disc fitting T & C type, composite polymer pin, insulator, P.G. Clamp, 'E' bracket, danger board with clamp,pole no. painting, barbed wire earthing, grouting of Stay Rod including all work as per norms etc. complete).
Grouting of Stay Rods (16 x 1800) mm including all work of excavation, cement concrete in size (0.60 x 0.60 x 0.30) m in ratio 1:4:8 cement, sand, 40mm brick ballast) as per drg including back filling, proper ramming etc. Fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing.
Fixing of T-off Channel with clamp including related items
Other small works to complete the line as per requirement.
Hard Rock broken
Road restoration charges for pucca road crossing
Road restoration charges for pucca footpath side
Bounding of Barbed wire with Denger Board at PCC/ST Pole
11 KV 3x120 sq.mm. XLPE Cable Laying Digging of trench size 0.75x75 mtr & putting layer of sand of bottam & laying of cable covering the trench from sites top by laying bricks finely cover the same by earth.
Making 11 KV Cable Jointing Kit with 11 KV 3x120 sq.mm.
Installtion of 11 KV PPMC, 3 Phase 4 wire static TV Meter & CT/PT Unit
11 KV 3x120 sq.mm. XLPE Cable Laying between PPMC & 11 KV CT/PT Metering Pole mounting unit, Digging of trench size 0.75x75 mtr & putting layer of sand of bottam & laying of cable covering the trench from sites top by laying bricks finely cover the same by earth.
11 KV HT Line/ feeder of GLR3 at village Markundi, Water Supply scheme (Patwadh gram samuh payjal yojna ) Emerging At substation 33/11KV salkhan
CENTRALIZED MATERIALS
ST Pole 11 Mtr. Long
3x185 sq mm. 11 kv XLPE cable
11K.V. Disc Insulator
11 kv disc fitting
11K.V.Pin with nut
11K.V.Pin Insulator
A.C.S.R Weasel Conductor
stay loop insulater
3 PHASE 4 WIRE STATIC TV METER 11KV
11 KV PILFER PROOF METERING CUBICAL CT 150/5Amp
11 KV CT/PT Metering pole Mounted unit 150/5 Amp
DE-CENTRALIZED MATERIALS
Top Channel MS 100x50x2240 mm Long
M.S.Channel Dropper100x50x6mm 2028mm Long
X Arm M. S. Angle V-Type
stay wire 7/8 swg
Stay Complete
Earthing Complete
GS/GI Earth wire 6swg
Cross bracing M.S. Angle
GI wire 8swg for guarding
3x185 sq mm.11 kv cable jointing kit
11 KV TPMO
PG Clamp For Conductor with Nut & Bolt
MS angle for guarding
MS angle 75x75x2028MM Long(cvt base)
Cross Arm Holding Clamp With Nut & Bolt
Danger Board With Nut & Botlts
Stone Pade (300x300x75)mm
Barbed Wire
Top ,T- Off & Cross Brassing Asngle Clamp With Nut & Bolt
F Bracket
Nut & Bolt with washer
Number Plate with clamp
GI Pipe 6" Dia
Work of following materials as per RESPO/PuVVNL norms at the work site.
Erection of Single pole structure on 11 mtr. ST Pole including all works of excavation of pit, pole erection, grouting in the ratio 1 : 4 : 8 (cement, sand, 40mm brick ballast) back filling of earth, proper ramming & fitting of all accessories ('V' type cross arm clamps with bolt and nut, Channel-bracket, composite polymer pin, insulator, danger board with clamp, Pole no. painting,earthing, barbed wire, painting of pole with painr, making of plinth around ST Pole etc. complete)
Erection of Double Pole structure on 11 mtr. ST Pole including all works of evocation of pit, pole erection, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast),back filling of earth ,proper ramming & fitting of all accessories For Single Circuit (M.S. angle iron bracing with clamps, top channel with clamps, disc insulator T & C type, disc fitting T & C type, composite polymer pin, insulator, P.G. Clamp, 'E' bracket, danger board with clamp,pole no. painting, barbed wire earthing, grouting of Stay Rod including all work as per norms etc. complete).
Grouting of Stay Rods (16 x 1800) mm including all work of excavation, cement concrete in size (0.60 x 0.60 x 0.30) m in ratio 1:4:8 cement, sand, 40mm brick ballast) as per drg including back filling, proper ramming etc. Fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing.
Guarding between two poles (Span) like single poles, double poles, four poles, etc. to guard LT, 11 KV Line telephone and river crossing, road crossing etc. with G.I. wire no. 6 SWG and G.I. wire no. 8 SWG, including supply, cutting, fabrication and fixing of guarding channel 75 x 40 x 3010 mm with clamps nut & bolts etc. as per drawing.
Chopping of branches of trees along the route of the line and disposal of the same at suitable place.
Laying, spreading, lifting and final sagging of 3 phases of ACSR Weasal conductor in accordance with profile and sag chart including binding, Jumpering and fixing of P.G. Clamp as per requirement in 03 Nos. conductor in parallel.
Fixing of TPMO Set
Other small works to complete the line as per requirement.
Hard Rock broken
Road restoration charges for pucca road crossing
Bounding of Barbed wire with Denger Board at PCC/ST Pole
11 KV 3x185 sq.mm. XLPE Cable Laying Digging of trench size 0.75x75 mtr & putting layer of sand of bottam & laying of cable covering the trench from sites top by laying bricks finely cover the same by earth.
Making 11 KV Cable Jointing Kit with 11 KV 3x185 sq.mm.
Installtion of 11 KV PPMC, 3 Phase 4 wire static TV Meter & CT/PT Unit
11 KV 3x185 sq.mm. XLPE Cable Laying between PPMC & 11 KV CT/PT Metering Pole mounting unit, Digging of trench size 0.75x75 mtr & putting layer of sand of bottam & laying of cable covering the trench from sites top by laying bricks finely cover the same by earth.
M/S SMM INFRATECH PVT Ltd
Piyush Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .