| 1 | L-1₹10.2 LAccepted-AOC SHUKIA MORE MORWA DISTT SINGRAULI MP | MORWA | SINGRAULI | MP | L-1 | Accepted-AOC on resultant L-1 basis in open tender |
Tender Value
₹10.2 L
EMD Value
₹12,700
Closing Date
11 Feb 2023, 11:00 amClosed
GENERAL MANAGER (EXCV)
GM(Excv) Nigahi Project NCL, PO Nigahi, Dist Singrauli, MP-486884
Dismantling of Crowd machinery from BE-195 shovel at Jayant Project and assembling the dismantled Crowd machinery in BE-195 shovel sl. No. BE-3 at Nigahi Project and Repairing of 60 numbers wornout teeth of Ring Gear of BE-3 shovel at site at Nigahi
2023_NCL_269089_1
NGH/EXCV/TENDERS/22-23/062
Open Tender
Excavation Department Work
Item Rate
20 days
Nigahi Project
As per NIT
4 documents required · 4 mandatory
₹12,700
28 May 2023
27 Jan 2023
13 Feb 2023
27 Jan 2023
11 Feb 2023
28 Jan 2023
27 Jan 2023 - 31 Jan 2023
Amount
Scope of Work: Dismantling of Crowd machinery of BE-4 Shovel at Jayant Project and assembling it in BE-195 ( Sl No. BE-3) Shovel ay Nigahi Project after dismantling its existing crowd machinery and repairing of 60 numbers worn out / broken teeth of ring gear of BE-3 shovel at site at Nigahi Project. Note- Welding Electrodes as per requirement will be provided departmentally by NCL
Dismantling of Crowd machinery of BE-195 shovel (BE-4 Shovel) at Jayant Project
Cost/ charges for cleaning of working area including labour charges, contractor profit etc. (labour consisting of Un-skilled manpower)
Cost/ charges for dismantling of crowd machinery from BE-4 shovel at Jayant Project including labour charges contractor profit etc. (labour consisting of Skilled Fitter , Skilled Welder and Semi-skilled helper manpower)
Dismantling of old Crowd machinery of BE-195 shovel having sl. No.BE-3 Shovel at Nigahi Project
Cost/ charges for cleaning of working area before and after dismantling crowd machinery including labour charges contractor profit etc. (labour consisting of Un-skilled manpower)
Cost/ charges for dismantling of existing crowd machinery of BE-3 shovel at Nigahi Project including labour charges contractor profit etc. (labour consisting of Skilled Fitter , Skilled Welder and Semi-skilled helper manpower)
Cost/ charges for fitting of dismantled crowd machinery from Jayant Project to BE-3 Shovel at Nigahi Project including labour charges, contractor profit etc. (labour consisting of Skilled Fitter , Skilled Welder and Semi-skilled helper manpower)
Cost/ charges for Repairing of worn out / broken teeth of Ring Gear, including labour charges, contractor profit and any misc. charges (labour consisting of Skilled Fitter , Skilled Welder and Semi-skilled helper manpower) Total for 60 Nos.teeth
Hire charges for welding machine 03 Nos. with all accessories for all the above mentioneed job
Hire charges for grinder machine 02 Nos. with all accessories for all the above mentioneed job
Hire charges for gas cutting set 02 Nos. with all accessories for all the above mentioneed job
Hire charges for Hydrauli jack 200T for all the above mentioneed job
Transportation charges (for 01 no. Jeep for 20 days) for the all above mentionend job.
Hire charges for special tools for alignment of crowd gear box for all the above mentioned job.
Hire charges for tools and tackles like spanners, hammers, crow bar, heavy duty socket extension torque wrench etc.
Cost/ charges for Highly skilled supervisor including labour charges, contractor profit etc for the supervision of complete above mentioned job.
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .