| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 LAccepted-AOC DINDHAR NAMUNDA V P O DINDHAR NAMUNDA DINDHAR PANIPAT HARYANA 132101 | PANIPAT | HARYANA | 132101 | 1 | Accepted-AOC accept |
Tender Value
₹1 L
EMD Value
₹2,000
Closing Date
18 May 2022, 1:00 pmClosed
Executive Engineer
Sampla W/S Division, Rohtak
Constructing of water course crossing at RD 13800 of Dighal Link Drain.
2022_HRY_220714_1
4038-62/12-A
Open Tender
Civil Works
Item-rate/Agreement basic
30 days
Rohtak
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
₹2,000
Yes
8 Jul 2022
11 May 2022
18 May 2022
11 May 2022
18 May 2022
11 May 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge including around structure flling drain diversion (HSR Item No. 4.12)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1:3:6 (1 Cement : 3 coarse sand (zone-Ill) : 6 graded stone aggregate 20 mm nominal size) (HSR Item No. 6.1.4)
Brick Masonry Work in Cement Mortar 1 :3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications MORT&H clause 1300Cement Mortar1 :4 (1 cement :4 sand (HSR Item No. 15.6.3)
10 mm cement plaster of mix : 1 :4 (1 cement: 4 fine sand) (HSR Item No. 11.5.3)
Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. (HSR Item No. 6.34.6)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement-All work up to plinth level: 1 : 1. 5: 3 ( 1 cement : 1. 5 coarse sand (zone-Ill): 3 graded stone aggregate 20 mm nominal size) (HSR Item No. 6.14.1)
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns (HSR Item No. 6.29.1)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .