Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.7 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹18.1 L+₹41,747.44 (2.36%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹18.4 L+₹73,968.62 (4.18%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹18.8 L+₹1.1 L (6.24%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹20.4 L+₹2.7 L (15.2%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹28.0 L
EMD Value
₹56,040
Closing Date
1 Jun 2026, 6:00 pmClosed
Executive Engineer RnB Div Sgr Core
Office of the Executive Engineer RnB Div Sgr Core
Construction Of Store Building Single Storey at FPN Zakura Srinagar
2026_PWDJK_310525_2
06 of RNB//Sgr-Core/2026-27
Open Tender
Civil Works
Percentage
75 days
Srinagar
refer nit
3 documents required · 3 mandatory
₹1,100
Executive Engineer RnB Div Sgr Core
₹56,040
11 Jun 2026
21 May 2026
2 Jun 2026
21 May 2026
1 Jun 2026
21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 meters lead :
Of area of 3 sqm. and below | 6 | each | 285.25 | ₹1,711.5 |
| 2 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge
In cement mortar | 0.69 | CUM | 1,458.45 | ₹1,006.33 |
| 3 | Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge In cement mortar | 44.35 | CUM | 2,036.4 | ₹90,314.34 |
| 4 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge
In lime mortar | 54.1 | CUM | 820.4 | ₹44,383.64 |
| 5 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:
2.9.1 All kinds of soil | 39.07 | CUM | 256.85 | ₹10,035.13 |
| 6 | Supplying and laying of Nallah Dry Stone Solling hand packed tightly including ramming ,watering and filling of intersties ,including all carriages complete. | 49.75 | CUM | 950 | ₹47,262.5 |
| 7 | Supplying and filling in plinth with fine sand under floors including, watering,ramming, consolidating and dressing complete. | 18.13 | CUM | 1,204.5 | ₹21,837.59 |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40 mm nominal size). | 11.05 | CUM | 5,202.9 | ₹57,492.05 |
| 9 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement All works upto plinth level 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size). | 15.43 | CUM | 7,275.25 | ₹1,12,257.11 |
| 10 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size). | 38.43 | CUM | 6,591.25 | ₹2,53,301.74 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.58 MB
BOQ_1004432.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .