| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAdmitted-Finance | ₹3.3 L | L1 | Admitted-Finance |
| 2 | L2₹3.7 L+₹36,287.50 (10.9%)Admitted-Finance | ₹3.7 L+₹36,287.50 (10.9%) | L2 | Admitted-Finance |
| 3 | L3₹3.7 L+₹41,017.50 (12.4%)Admitted-Finance | ₹3.7 L+₹41,017.50 (12.4%) | L3 | Admitted-Finance |
| 4 | L4₹4.2 L+₹92,697.50 (28.0%)Admitted-Finance | ₹4.2 L+₹92,697.50 (28.0%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | IMPLA GENERAL SUPPLIERS L1 | GEC ELECTRICALS L2 | M/S WANI ELECTRICAL CONTRACTOR L3 | M/S AL MUSTAFFA ELECTRICALS L4 |
|---|---|---|---|---|---|---|---|
| 1.00Work items identified; | |||||||
| 1.10 | Supply, installation, testing and commisioning of 63 kVA ,11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Aluminium wound , and with LV
Cable Box having detachable Aluminium Gland plate 11/0.433KV, 3-phase(EE Level-II) complete in all respect as per Standards. | 1 | No. | 1,30,000 ₹1,30,000 Lowest | 1,35,000 ₹1,35,000 | 1,44,000 ₹1,44,000 | 1,42,000 ₹1,42,000 |
| 2.10 | Supply, installation, testing and commisioning of 9 mtr (410 SP-33) long Steel Tubular Poles complete with base plate(350x350x5mm), top cap, Earthing Channel(75x40x6mm) including digging of pit positioning etc, complete in all respect as per Standards. | 4 | Nos. | 14,000 ₹56,000 Lowest | 16,000 ₹64,000 | 16,300 ₹65,200 | 17,500 ₹70,000 |
| 3.10 | Supply, installation, testing and commisioning of 8 mtr(410 SP-15) long Steel Tubular Poles complete with base plate(350x350x5mm), top cap, Earthing Channel(75x40x6mm) positioning etc, complete in all respect as per Standards. | 1 | Nos. | 11,000 ₹11,000 Lowest | 12,800 ₹12,800 | 11,500 ₹11,500 | 14,500 ₹14,500 |
| 4.10 | Supply, laying, stringing, tensioning, binding of 50 Sqmm ACSR Conductor complete in all respects as per standards. | 0.4 | Km. | 4,000 ₹1,600 Lowest | 40,000 ₹16,000 | 40,000 ₹16,000 | 38,500 ₹15,400 |
| 5.10 | Supply,Carraige upto site and fixing of GI V cross-arm with top Bracket including clamp duly fabricated as per site requirement including clamps(50x8 mm), GI Nuts & Bolts,washers etc complete in all respects as per standards. | 84 | Kg | 115 ₹9,660 | 125 ₹10,500 | 120 ₹10,080 | 110 ₹9,240 Lowest |
| 6.10 | Supply,Carraige upto site, fixing and installation of GI Channels of different sizes including clamps and braces. | 300 | Kg | 110 ₹33,000 | 110 ₹33,000 | 120 ₹36,000 | 105 ₹31,500 Lowest |
| 7.10 | Supply,Carraige upto site,Installation,testing and Commissioning of 11kV Polymeric composite Pin Insulators 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance
320mm complete in all respects as per standards. | 12 | No. | 180 ₹2,160 | 160 ₹1,920 Lowest | 200 ₹2,400 | 250 ₹3,000 |
| 8.10 | Supply and fixing of Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6) mm, nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete in all respects as per standards. | 1 | Set | 200 ₹200 | 100 ₹100 Lowest | 100 ₹100 Lowest | 200 ₹200 |
| 9.10 | Supply,Carraige upto site,Installation,testing and Commissioning of 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative,
creepage distance 320mm complete in all respects as per standards. | 1 | Set | 500 ₹500 | 100 ₹100 Lowest | 100 ₹100 Lowest | 500 ₹500 |
Tender Value
₹5.4 L
EMD Value
₹10,800
Closing Date
8 Oct 2025, 4:00 pmClosed
Executive Engineer, ED Budgam, KPDCL
Executive Engineer, ED Budgam, KPDCL
Installation of three phase electricity connectivity to PHC Surasyar
2025_PDD_290387_1
73 of 2025-26
Open Tender
Electrical and Maintenance Works
Turn-key
60 days
ED Budgam, KPDCL
AS PER SBD
7 documents required · 7 mandatory
₹500
Executive Engineer, ED Budgam, KPDCL
₹10,800
11 Oct 2025
30 Sept 2025
9 Oct 2025
30 Sept 2025
8 Oct 2025
30 Sept 2025
30 Sept 2025 - 1 Oct 2025
Amount
Work items identified;
Supply, installation, testing and commisioning of 63 kVA ,11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Aluminium wound , and with LV Cable Box having detachable Aluminium Gland plate 11/0.433KV, 3-phase(EE Level-II) complete in all respect as per Standards.
Supply, installation, testing and commisioning of 9 mtr (410 SP-33) long Steel Tubular Poles complete with base plate(350x350x5mm), top cap, Earthing Channel(75x40x6mm) including digging of pit positioning etc, complete in all respect as per Standards.
Supply, installation, testing and commisioning of 8 mtr(410 SP-15) long Steel Tubular Poles complete with base plate(350x350x5mm), top cap, Earthing Channel(75x40x6mm) positioning etc, complete in all respect as per Standards.
Supply, laying, stringing, tensioning, binding of 50 Sqmm ACSR Conductor complete in all respects as per standards.
Supply,Carraige upto site and fixing of GI V cross-arm with top Bracket including clamp duly fabricated as per site requirement including clamps(50x8 mm), GI Nuts & Bolts,washers etc complete in all respects as per standards.
Supply,Carraige upto site, fixing and installation of GI Channels of different sizes including clamps and braces.
Supply,Carraige upto site,Installation,testing and Commissioning of 11kV Polymeric composite Pin Insulators 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm complete in all respects as per standards.
Supply and fixing of Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6) mm, nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete in all respects as per standards.
Supply,Carraige upto site,Installation,testing and Commissioning of 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm complete in all respects as per standards.
Supply, Carraige upto site, installation, testing and Commissioning of Gapless Surge Arrestor 9 kV, 10 kA, LA with polymer housing, Stn. Type complete in all respects as per standards.
Supply, Carraige upto site, installation, testing and Commissioning of 11 kV G.O AB Switch 3-phase, 3 pole 200-Amp, vertical Type with fittings complete in all respects as per standards.
Supply, Carraige upto site, installation, testing and Commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A complete in all respects as per standards.
Supply, Carraige upto site, laying, stringing, tensioning, binding of 120 mm² (1Ckt )1.1kV Grade, XLPE Insulated Stranded Conductor FRLS type cable complete in all respects as per standards.
Supply, Carraige upto site, installation, testing and Commissioning of LT Distribution Box for - i) 63 kVA DTR with 100 Amp MCCB 3P 16 kA for incomer & 100 Amp MCCB 3P 16 kA 1 No. and 63 Amp MCCB 3P 16 kA 1 No.s for Outgoing Circuits, - complete in all respects as per standards.
Supply, Carraige upto site, installation, testing and Commissioning of three phase trivector meter Prodigy complete in all respects as per standards.
Earthing of substation-Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239. GI Strip for neutral earthing of size 25 mmx3 mm, for connection of transformer body,G.O set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover complete in all respects as per standards.
Supply,Carraige upto site, fixing of G I Muky Clamps. As per standards
Supply,Carraige upto site, fixing of 16 KN Shackale insulators as per standards.
Cement bottoming 1:2:4 mix as per Standards 0.5cum/0.45 cum pole comlete in all respects.
Earthing of steel tubular poles complete by GI pipe 40mm or GI rod 20mm 3.0 mtr long through GI strip 25x3 as per standards.
Painting of Poles with one coat of Red Oxide and two coats of alimunium paint to give uniform shine.
Supply and fixing of GI barbed wire Anti climbind Device with clamps complete in all respects as per Standards
Supply and fixing of danger plates with clamps complete in all respects as per Standards
Supply of safety helmets conforming to safety standards with ISI marks.
Supply of safety belt/harness conforming to safety standards with ISI marks.
Paint mark of scheme
NOTE: 1.The rates quoted by the bidder for all the items shall be inclusive of GST/freight/insurance/storage/installation/testing and any other charges Installation of three phase electricity connectivity at PHC Surasyar under the jurisdiction of ED Budgam, KPDCL.
GEC ELECTRICALS (BID ID -2581051)
M/S WANI ELECTRICAL CONTRACTOR (BID ID -2581384)
M/S AL MUSTAFFA ELECTRICALS (BID ID -2581196)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .