Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.8 CrAdmitted-Finance | ₹12.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹12.9 CrAdmitted-Finance | ₹12.9 Cr | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ULTRA TECH ENGINEERS L1 | Som Projects Pvt. Ltd. L2 |
|---|---|---|---|---|---|
| 1.00 | Supply of structural steel materials of various shapes and sections (angle, beam and channel, etc), rounds, plates, flats, etc, confirming to IS2062-2011 and grade E250 with quality of steel BR/C or its equivalent approved by NPCIL. This includes assessment of material requirement as per the approved drawings, procurement of materials of NPCIL approved make with test certificates, sample test of materials, delivery at site, handling, loading and unloading, transportation and storage, inspection at contractor's store, preparation of IMIR(Incoming Material Inspection Report), arrangement of manpower, tools and tackles, P&M, etc as per EIC instruction. | 150 | MT | 97,500 ₹1.5 Cr | 1,50,000 ₹2.3 Cr |
| 2.00 | Bending of I beams (monorail beams) size upto 300mm to the required profile and radius of curvature with cold process as per approved procedures/drawings at KKNPP premises. This includes preparation of procedure, quality plan, reports, handling, transportation of materials from site to bending shopfloor and vice versa, required manpower, Plant&Machineries, tools and tackles, material handling equipment, loading and unloading of materials, storage, preservation, consumables and PPEs, etc., as per EIC instruction. | 30 | MT | 69,000 ₹20.7 L | 80,000 ₹24 L |
| 3.00 | Erection of any type and profile of crane rail confirming to ISCR(Indian standard crane rail section / KP(Russian standard crane rail section)/ISMB (Indian Standard Medium weight Beam) inclusive of all accessories and fasteners, receipt of materials from EIC store, cutting of rails to the required length, splicing of rails with welding/bolting, grit blasting, painting and finishing as per approved drawings and specification / manufacturer instruction manual / erection and alignment procedures at various elevations and buildings of KKNPP-3&4. This item includes preparation of procedures, cutting plan, Quality plan, reports, transportation and storage of materials to erection site from EIC store within KKNPP premises, required manpower, machineries, tools and tackles, erection equipments, material handling equipment, fitup and welding of rail accessories like rail clamps and stoppers, etc., as per approved drawings, alignment and clamping of rails, torquing of clamp bolts, calibrated measuring instruments, torque wrenches of various range with calibration, Total station instrument with surveyor for alignment inspection of rails, supply of welding electrodes and consumables, housekeeping and PPEs, etc. as per EIC instruction. (Erection of scaffolding & grit blasting and painting shall be measured and paid under relevant SOQR item). | 80 | MT | 77,500 ₹62 L | 60,000 ₹48 L |
| 4.00 | Fabrication of structural steel brackets and miscellaneous structures as per approved drawings: Fabrication involves preparation of detailed metal structure drawing, cutting, grinding, drilling, machining, welding, machining, bending and surface preparation & painting, etc., This includes preparation of procedures, reports, required manpower, handling, transportation of materials, fabrication facilities, machineries, tools and tackles, material handling equipment, welding electrodes, consumables, housekeeping and PPEs, etc., as per EIC instruction. (Surface preparation and painting shall be measured and paid under relevant SOQR item). | 70 | MT | 98,000 ₹68.6 L | 80,000 ₹56 L |
| 5.00 | Erection of structural steel brackets and miscellaneous structures as per approved drawings. Erection of fabricated brackets inclusive of various sizes of bolts, washer, nuts and lock nuts and welding as per approved procedures at various elevations and building of KKNPP-3&4. This item includes preparation of procedures, reports, required manpower, handling, transportation of materials, machineries, tools and tackles, material handling equipments, alignment, inspection, total station instrument with surveyor for inspection wherever required, calibrated measuring instruments, supply of welding electrodes & filler wires, other consumables, housekeeping and PPEs, etc., as per EIC instruction.
(Erection of scaffolding shall be measured and paid under relevant SOQR item). | 70 | MT | 69,500 ₹48.6 L | 80,000 ₹56 L |
| 6.00 | Erection of scaffolding and platforms including scaffolding materials, required qualified manpower, preparation of procedure, reports, tools and tackles, consumables, handling, shifting, transportation and storage of materials, etc at various elevations and buildings of KKNPP-3&4, dismantling, housekeeping and transportation of scaffolding to contractor store as per EIC instruction. | 80,000 | Cu. Meter | 540 ₹4.3 Cr | 400 ₹3.2 Cr |
| 7.00 | Supply of cast iron weights of each 20Kg. This includes supply of materials as per technical specification, handling and transportation of materials, delivery at site, shifting and stacking of items at EIC store, preparation of IMIR, required manpower, tools and tackles, material handling equipment, consumables and PPEs, etc., as per EIC instruction. | 250 | Nos. | 3,600 ₹9 L | 3,000 ₹7.5 L |
| 8.00 | Supply of cast iron weights of each 50Kg. This includes supply of materials as per technical specification, handling and transportation of materials, delivery at site, material inspection, required manpower, tools and tackles, material handling equipment, consumables and PPEs, etc., as per EIC instruction. | 100 | Nos. | 11,000 ₹11 L | 7,000 ₹7 L |
| 9.00Erection and testing of Material Handling Equipment(MHE) like stationary gear hoist, gear mobile hand operated hoist and hand operated grapplers of capacities as mentioned below at various elevations and buildings of KKNPP-3&4 as per approved procedures. This includes preparation of test procedures, reports, shifting of MHE and test loads from EIC store to erection site, shifting test loads to EIC store after load test, shifting, handling and transportation, manpower, Plant and Machineries, loading and unloading, tools and tackles, material handling equipment, consumables, housekeeping and PPEs, etc., as per EIC instruction. (Erection of scaffolding shall be measured and paid under relevant SOQR item. The shifting of test load is included in this item and hence no payment shall be paid under SOQR.item.25 separately). | |||||
| 9.10 | Material handling equipment upto 1T capacity | 660 | Nos. | 15,000 ₹99 L | 300 ₹2.0 L |
Updated dates
Tender Value
₹13.6 Cr
EMD Value
₹21.1 L
Closing Date
25 Mar 2026, 5:00 pmClosed
DGM (CMM-Works Group)
KKNPP, NPCIL
Supply, fabrication and erection of structural steel, erection of monorail, hoist and miscellaneous structures at KKNPP-3and4
2026_NPCIL_269080_1
NPCIL/KK-3and4/MECH/PT/2026/23
Open Tender
Machineries/ Mechanical Engg Items
1095 days
KKNPP-3and4
Details given in Tender Document
3 documents required · 3 mandatory
₹0
₹21.1 L
CMM - Works Group, Conference Hall, C-Block, Groun
16 May 2026
27 Feb 2026
28 Mar 2026
28 Feb 2026
25 Mar 2026
11 Mar 2026
28 Feb 2026 - 7 Mar 2026
9 Mar 2026
DETAILS TO BE FURNISHED BY BIDDER
Tender Number NPCIL/KK-3&4/CONST/MECH/PT/2026/23
Name of Bidder/ Enterprise / Company/Legal Entity
S. NO. PARTICULARS DETAILS
1 Name of Bidder/Enterprise/Company /Legal Entity
3 a) Place of incorporation
3 b) Year of incorporation
4 Type of organization
5 Udyam Registration certificate details
5.1 Udyam Registration certificate no
5.2 Date of Registration
5.3 a) Type of Enterprise
5.3 b) Nature of Enterprise
5.4 Social Category of Entrepreneur
5.5 Gender of Entrepreneur
5.6 Details of registered services
NIC five digit code
Details of activity
NIC five digit code
Details of activity
NIC five digit code
Details of activity
NIC five digit code
Details of activity
NIC five digit code
Details of activity
6 Name of DSC Holder
7 Name of Power of Attorney of Holder
8 PAN (Permanent Account Number)
9 GST details of Bidder
9.1 Whether Registered under GST?
9.2 In case Unregistered, mention the reason for not registering. (Please select).
9.2.1 In case of (b) selection above in S.No. 9.2, please give full details.
9.3 If " yes" slection in S.No. 9.1 , mention the GSTIN ID/ARN (Application Reference Number) /Provisional ID No
9.4 Address (as per registration with GST with Postal Code)
9.5 Any change in the status of Registration of the bidder, after award of the Contract shall be disclosed to the Corporation forthwith. Please confirm.
9.6 All the benefits and credits on inputs as available under GST acts/rules are availed and passed on the benefits to Corporation in bid price complying with provision of Anti-profiteering measures. Please confirm.
9.7 Type of business
9.8 Whether the GST registration is active
9.9 Mention whether Reverse Charge Mechanism (RCM) is applicable for the tendered work.
10 Registration no of EPF (Employees’ Provident Fund)
11 Registration no of ESI(Employee State Insurance)
12 a) Is your near relative(s) working in Corporation
b) If yes, Name(s) and details of posting in Corporation
13 Make in India
13.1 % of Local Content
13.2 Class of Local Supplier
14.1 If yes, Startup India Certificate No.
15 Bidder has conflict of interest as per clause no. 11.2 of Part 1 of NIT
16 Bidder’s email id for any official correspondence by corporation
17 Bidder’s telephone no./ mobile no. for any official correspondence by corporation
18 Bank Details of Bidder for any Financial Transaction between Corporation and Bidder
18.2 Branch Name
18.3 Account Number
19 GeM Seller ID(if available)
WORK EXPERIENCE
Tender Number NPCIL/KK-3&4/CONST/MECH/PT/2026/23
Name of Bidder/ Enterprise / Company/Legal Entity
WORK EXPERIENCE Work 1 Work 2 Work 3 Work 4 Work 5 Work 6 Work 7 Work 8 Work 9 Work 10
2 Agreement no. / Contract no. / Work order No. with bill of quantities and rates details, (No.)
Agreement / Contract / Work order with bill of quantities and rates details, (Date) Enter Date in DD-MM-YYYY (Day-Month-Year)
3 Details of Client
4 Whether the client is Government / private entity
5 Nature of client firm in case client is private entity
6 Date of commencement of work Enter Date in DD-MM-YYYY (Day-Month-Year)
7 Stipulated date of completion Enter Date in DD-MM-YYYY (Day-Month-Year)
8 Actual date of completion Enter Date in DD-MM-YYYY (Day-Month-Year)
9 a) Value of work done on completion (in ₹)
b) Value of similar nature work on completion (in ₹)
c) Value of similar nature of work on completion after escalation as per clause no. 1.3.8 of Part 1 or Operating Part of NIT (in ₹)
10 Ref. no and date of client’s completion certificate or similar documentary evidence certifying completeness of work issued by client
11 If work is done with Government/Government Autonomous Bodies/Public Sector Units, documents as per clause 1.3.5.1 of Part 1 or Operating Part of NIT
12 If work is done with other than Government/Government Autonomous Bodies/Public Sector Units, documents as per clause 1.3.5.2 of Part 1 or Operating Part of NIT
13 Whether the work has been completed satisfactorily Unsatisfactory/poor performance refers to such as abandoning the work, rescission of the contract for reasons which are attributable to non-performance of the contractor, inordinate delays in completion, history of litigation resulting in award against the contractor or any of the constituents, or financial failure due to bankruptcy, and so on.
14 Whether any banning(or any other term meaning the same) was done against this work
15 Similar Value of work (completed) meeting criteria of 80%/50%/40% of estimated cost put to tender
NOTES: a) Details of only similar works as defined in the pre-qualification criteria shall be uploaded. b) The bidder shall fill the relevant details. If the bidder fills that the details are “as per enclosure/attached annexure”, then such submission will not be considered for evaluation. c) For each work experience separate format has to be filled. d) The cost of completed work shall mean gross value of the completed work including all the taxes and levies, escalation (if any), cost of material supplied by the client on chargeable basis but excluding those supplied free of cost. The cost of chargeable material shall be the fixed value at which the client had supplied the material.
Tender Number NPCIL/KK-3&4/CONST/MECH/PT/2026/23
Name of Bidder/ Enterprise / Company/Legal Entity
(On letter head of Chartered Accountant) This is to certify that the financial data of M/s _________________________________, having PAN no: ------------, Regd. Office address: ------- is as under: -
Amount (in INR (₹))
Whether Balance Sheet of the last financial year(i.e. 2024-25) is audited.
Sr. No. DESCRIPTION AUDITED FINANCIAL DATA FOR LAST FIVE FINANCIAL YEARS
Year Year Year Year Year
1 Annual Turnover
2 Average Annual turnover
3 Profit Before (PBT) for preceding 5 financial years
4 Net worth as per latest audited financial statement as mentioned in Net Worth Certificate
We have obtained all the information from the Bidder which is necessary for the purpose of certification. It is certified that the all information are correct to the best of our knowledge and belief. It is certified that during certification, all supporting documents were examined by us.
(Signature, Seal having membership no./ FRN of CA with UDIN)
1. The information is to be certified by a practicing Chartered Accountant on his letterhead, under his signature and seal having membership no./FRN and UDIN. Bidder shall fill the data in excel sheet as mentioned in the certificate and then upload the certificate with bid.
2. Separate Format shall be used for each member in case of JV (unincorporated)/ Consortium. All such documents shall reflect the financial data of the bidder or member in case of JV (unincorporated)/Consortium and not that of sister of parent company.
3. Net Worth shall mean aggregate value of the paid-up share capital and all reserves created out of the profits and securities premium account, after deducting the aggregate value of the accumulated loses, deferred expenditure and miscellaneous expenditure not written off, as per the audited balance sheet, but does not include reserves created out of revaluation of assets, write back of depreciation and amalgamation.
4. For the purpose of this certificate Annual Turnover shall mean “Sale Value or Operating Income.”
5. In case audited financial data of the immediate preceding financial year is not made available by the bidder, he has to upload a certificate issued by a practicing Chartered Accountant on his letterhead under his signature and seal having membership no./FRN and UDIN stating that “the balance sheet for FY ……………..has actually not been audited so far”. In such case the financial data of one more preceding audited financial year as applicable shall be submitted by the Bidder for evaluation purpose. In such case bidder shall provide the financial data of last three/five audited financial years as the case may be, same shall be taken into consideration for evaluation.
6. Net Worth (if required) as per clause no. 2.3 of Part 1or Operating Part of NIT shall be submitted.
7. Profit before tax criteria shall be applicable for tenders of estimated cost put to tender of ₹ 10 Crores and above.
FORMAT-4 FORMAT-4 FORMAT-4 FORMAT-4 FORMAT-4 FORMAT-4 FORMAT-4 FORMAT-4
Tender Number NPCIL/KK-3&4/CONST/MECH/PT/2026/23 Tender Number NPCIL/KK-3&4/CONST/MECH/PT/2026/23 Tender Number NPCIL/KK-3&4/CONST/MECH/PT/2026/23 Tender Number NPCIL/KK-3&4/CONST/MECH/PT/2026/23 Tender Number NPCIL/KK-3&4/CONST/MECH/PT/2026/23 Tender Number NPCIL/KK-3&4/CONST/MECH/PT/2026/23 Tender Number NPCIL/KK-3&4/CONST/MECH/PT/2026/23 Tender Number
Name of Bidder/ Enterprise / Company/Legal Entity Name of Bidder/ Enterprise / Company/Legal Entity Name of Bidder/ Enterprise / Company/Legal Entity Name of Bidder/ Enterprise / Company/Legal Entity Name of Bidder/ Enterprise / Company/Legal Entity Name of Bidder/ Enterprise / Company/Legal Entity Name of Bidder/ Enterprise / Company/Legal Entity Name of Bidder/ Enterprise / Company/Legal Entity
Certificate giving details of bill wise payment received and their respective TDS amount for works executed for clients other than Government/Government Autonomous bodies/Public Sector Units Certificate giving details of bill wise payment received and their respective TDS amount for works executed for clients other than Government/Government Autonomous bodies/Public Sector Units Certificate giving details of bill wise payment received and their respective TDS amount for works executed for clients other than Government/Government Autonomous bodies/Public Sector Units Certificate giving details of bill wise payment received and their respective TDS amount for works executed for clients other than Government/Government Autonomous bodies/Public Sector Units Certificate giving details of bill wise payment received and their respective TDS amount for works executed for clients other than Government/Government Autonomous bodies/Public Sector Units Certificate giving details of bill wise payment received and their respective TDS amount for works executed for clients other than Government/Government Autonomous bodies/Public Sector Units Certificate giving details of bill wise payment received and their respective TDS amount for works executed for clients other than Government/Government Autonomous bodies/Public Sector Units Certificate giving details of bill wise payment received and their respective TDS amount for works executed for clients other than Government/Government Autonomous bodies/Public Sector Units
(On letter head of Chartered accountant) (On letter head of Chartered accountant) (On letter head of Chartered accountant) (On letter head of Chartered accountant) (On letter head of Chartered accountant) (On letter head of Chartered accountant) (On letter head of Chartered accountant) (On letter head of Chartered accountant)
Company Name: M/s Company Name: M/s Company Name: M/s Company Name: M/s Company Name: M/s Company Name: M/s Company Name: M/s Company Name: M/s
Name of Work: Name of Work: Name of Work: Name of Work: Name of Work: Name of Work: Name of Work: Name of Work:
Work Order / Agreement No. : Work Order / Agreement No. : Work Order / Agreement No. : Work Order / Agreement No. : Work Order / Agreement No. : Work Order / Agreement No. : Work Order / Agreement No. : Work Order / Agreement No. :
Work Order / Agreement Date: Work Order / Agreement Date: Work Order / Agreement Date: Work Order / Agreement Date: Work Order / Agreement Date: Work Order / Agreement Date: Work Order / Agreement Date: Work Order / Agreement Date:
Completion Certificate Number/ similar documentary evidence certifying completeness of work issued by client Number: Completion Certificate Number/ similar documentary evidence certifying completeness of work issued by client Number: Completion Certificate Number/ similar documentary evidence certifying completeness of work issued by client Number: Completion Certificate Number/ similar documentary evidence certifying completeness of work issued by client Number: Completion Certificate Number/ similar documentary evidence certifying completeness of work issued by client Number: Completion Certificate Number/ similar documentary evidence certifying completeness of work issued by client Number: Completion Certificate Number/ similar documentary evidence certifying completeness of work issued by client Number: Completion Certificate Number/ similar documentary evidence certifying completeness of work issued by client Number:
Client’s Name, Address & Contact Details: Client’s Name, Address & Contact Details: Client’s Name, Address & Contact Details: Client’s Name, Address & Contact Details: Client’s Name, Address & Contact Details: Client’s Name, Address & Contact Details: Client’s Name, Address & Contact Details: Client’s Name, Address & Contact Details:
PAN no. of client: PAN no. of client: PAN no. of client: PAN no. of client: PAN no. of client: PAN no. of client: PAN no. of client: PAN no. of client:
PAN no. of bidder: PAN no. of bidder: PAN no. of bidder: PAN no. of bidder: PAN no. of bidder: PAN no. of bidder: PAN no. of bidder: PAN no. of bidder:
Sr. No. Bill No Bill Period Rate of TDS Bill Amount(₹) TDS Amount(₹) Sr. No. Bill No Bill Period Rate of TDS Bill Amount (₹) TDS Amount (₹) Sr. No. Bill No Bill Period Rate of TDS Bill Amount TDS Amount Sr. No. Bill No Bill Period Rate of TDS Bill Amount TDS Amount Sr. No. Bill No Bill Period Rate of TDS Bill Amount (₹) TDS Amount (₹) Sr. No. Bill No Bill Period Rate of TDS Bill Amount (₹) TDS Amount (₹) Sr. No. Bill No Bill Period Rate of TDS Bill Amount (₹) TDS Amount (₹) Sr. No. Bill No
Total Total Total Total Total Total Total
We have obtained all the information from the bidder which is necessary for the purpose of certification. It is certified that the all information are correct to the best of our knowledge and belief. The certification process involves examining the supporting documents. We have obtained all the information from the bidder which is necessary for the purpose of certification. It is certified that the all information are correct to the best of our knowledge and belief. The certification process involves examining the supporting documents. We have obtained all the information from the bidder which is necessary for the purpose of certification. It is certified that the all information are correct to the best of our knowledge and belief. The certification process involves examining the supporting documents. We have obtained all the information from the bidder which is necessary for the purpose of certification. It is certified that the all information are correct to the best of our knowledge and belief. The certification process involves examining the supporting documents. We have obtained all the information from the bidder which is necessary for the purpose of certification. It is certified that the all information are correct to the best of our knowledge and belief. The certification process involves examining the supporting documents. We have obtained all the information from the bidder which is necessary for the purpose of certification. It is certified that the all information are correct to the best of our knowledge and belief. The certification process involves examining the supporting documents. We have obtained all the information from the bidder which is necessary for the purpose of certification. It is certified that the all information are correct to the best of our knowledge and belief. The certification process involves examining the supporting documents. We have obtained all the information from the bidder which is necessary for the purpose of certification. It is certified that the all information are correct to the best of our knowledge and belief. The certification process involves examining the supporting documents.
(Signature, Seal having membership no./ FRN of CA with UDIN) (Signature, Seal having membership no./ FRN of CA with UDIN) (Signature, Seal having membership no./ FRN of CA with UDIN) (Signature, Seal having membership no./ FRN of CA with UDIN) (Signature, Seal having membership no./ FRN of CA with UDIN) (Signature, Seal having membership no./ FRN of CA with UDIN) (Signature, Seal having membership no./ FRN of CA with UDIN) (Signature, Seal having membership no./ FRN of CA with UDIN)
Date: Date: Date: Date: Date: Date: Date:
Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes:
1) The number of rows may be increased to suit the requirement. 1) The number of rows may be increased to suit the requirement. 1) The number of rows may be increased to suit the requirement. 1) The number of rows may be increased to suit the requirement. 1) The number of rows may be increased to suit the requirement. 1) The number of rows may be increased to suit the requirement. 1) The number of rows may be increased to suit the requirement. 1) The number of rows may be increased to suit the requirement.
2) The above format shall be uploaded separately for each work order/agreement 2) The above format shall be uploaded separately for each work order/agreement 2) The above format shall be uploaded separately for each work order/agreement 2) The above format shall be uploaded separately for each work order/agreement 2) The above format shall be uploaded separately for each work order/agreement 2) The above format shall be uploaded separately for each work order/agreement 2) The above format shall be uploaded separately for each work order/agreement 2) The above format shall be uploaded separately for each work order/agreement
3) Bidder shall take out the print of this format and get it filled and certified by Chartered Accountant under his signature and seal having membership no./FRN and UDIN. 3) Bidder shall take out the print of this format and get it filled and certified by Chartered Accountant under his signature and seal having membership no./FRN and UDIN. 3) Bidder shall take out the print of this format and get it filled and certified by Chartered Accountant under his signature and seal having membership no./FRN and UDIN. 3) Bidder shall take out the print of this format and get it filled and certified by Chartered Accountant under his signature and seal having membership no./FRN and UDIN. 3) Bidder shall take out the print of this format and get it filled and certified by Chartered Accountant under his signature and seal having membership no./FRN and UDIN. 3) Bidder shall take out the print of this format and get it filled and certified by Chartered Accountant under his signature and seal having membership no./FRN and UDIN. 3) Bidder shall take out the print of this format and get it filled and certified by Chartered Accountant under his signature and seal having membership no./FRN and UDIN. 3) Bidder shall take out the print of this format and get it filled and certified by Chartered Accountant under his signature and seal having membership no./FRN and UDIN.
4) Value of work done will be commensurate with value of TDS certificate. 4) Value of work done will be commensurate with value of TDS certificate. 4) Value of work done will be commensurate with value of TDS certificate. 4) Value of work done will be commensurate with value of TDS certificate. 4) Value of work done will be commensurate with value of TDS certificate. 4) Value of work done will be commensurate with value of TDS certificate. 4) Value of work done will be commensurate with value of TDS certificate. 4) Value of work done will be commensurate with value of TDS certificate.
5) In case of multiple contracts taken from a client, details of respective TDS amount for each work need to be segregated and given separately. 5) In case of multiple contracts taken from a client, details of respective TDS amount for each work need to be segregated and given separately. 5) In case of multiple contracts taken from a client, details of respective TDS amount for each work need to be segregated and given separately. 5) In case of multiple contracts taken from a client, details of respective TDS amount for each work need to be segregated and given separately. 5) In case of multiple contracts taken from a client, details of respective TDS amount for each work need to be segregated and given separately. 5) In case of multiple contracts taken from a client, details of respective TDS amount for each work need to be segregated and given separately. 5) In case of multiple contracts taken from a client, details of respective TDS amount for each work need to be segregated and given separately. 5) In case of multiple contracts taken from a client, details of respective TDS amount for each work need to be segregated and given separately.
Tender Number NPCIL/KK-3&4/CONST/MECH/PT/2026/23
Name of Bidder/ Enterprise / Company/Legal Entity
THE DETAILS OF BLACK LISTING / SUSPENSION/DE-REGISTRATION /DEBARRING/ HOLIDAY IN CENTRAL STATE GOVERNMENT, PSU & PUBLIC BODIES (During last five financial years)
S.No Name of Client Work Order/ Agreement No. Value of work (in ₹ lakhs) Blacklisting (or any other term meaning the same) period Reasons Ref. Letter no. informing of black listing
1. The bidder shall upload the details of black listing /de-registration / holiday/suspension/ any other term meaning the same by any central / state government department or public sector undertaking. The relevant letter shall be scanned and uploaded.
WORK EXPERIENCE IN FOREIGN COUNTRY
Tender Number NPCIL/KK-3&4/CONST/MECH/PT/2026/23
Name of Bidder/ Enterprise / Company/Legal Entity
WORK EXPERIENCE Work 1 Work 2 Work 3 Work 4 Work 5 Work 6 Work 7 Work 8 Work 9 Work 10
2 Agreement no. / Contract no. / Work order No. with bill of quantities and rates details, (No.)
Agreement / Contract / Work order with bill of quantities and rates details, (Date) Enter Date in DD-MM-YYYY (Day-Month-Year)
3 Name of bidder company as is mentioned in work order
4 Details of Client
5 Whether the client is Government / private entity
6 Country where the work was executed
7 Date of commencement of work Enter Date in DD-MM-YYYY (Day-Month-Year)
8 Stipulated date of completion Enter Date in DD-MM-YYYY (Day-Month-Year)
9 Actual date of completion Enter Date in DD-MM-YYYY (Day-Month-Year)
10 a) Value of work done on completion in foreign currency ( in ₹)
b) Currency name
c) Bills selling exchange rates notified by The State Bank of India
d) Value of work done on completion in Indian rupee ( in ₹)
e) Value of similar work done in completion (in ₹)
f) Value of similar work done in completion after escalation as per clause: 1.3.8 of Part 1 or Operating Part of NIT (in ₹)
11 Ref. no and date of client’s completion certificate or similar documentary evidence certifying completeness of work issued by client
12 Whether documents as per clause 1.3.7 of Part 1 or Operating Part are uploaded
13 Whether the work has been completed satisfactorily. Unsatisfactory/poor performance refers to such as abandoning the work, rescission of the contract for reasons which are attributable to non-performance of the contractor, inordinate delays in completion, history of litigation resulting in award against the contractor or any of the constituents, or financial failure due to bankruptcy, and so on
14 Whether any banning (or any other term meaning the same) was done against this work.
15 Similar Value of work completed meeting criteria of 80%/50%/40% of estimated cost put to tender.
NOTE: a) Details of only similar works as defined in the pre-qualification criteria shall be uploaded. b) The bidder shall fill the relevant details. If the bidder fills that the details are “as per enclosure/attached annexure”, then such submission will not be considered for evaluation. c) For each work experience separate format has to be filled. d) The cost of completed work shall mean gross value of the completed work including all the taxes and levies, escalation (if any), cost of material supplied by the client on chargeable basis but excluding those supplied free of cost The cost of chargeable material shall be the fixed value at which the client had supplied the material.
BID CAPACITY (Applicable for tenders with estimated cost put to tender equal to or above ₹ 10 Crores)
Tender Number NPCIL/KK-3&4/CONST/MECH/PT/2026/23
Name of Bidder/ Enterprise / Company/Legal Entity
(On letter head of Chartered Accountant) This is to certify that the financial data of M/s _________________________________, having PAN no: ------------, Regd. Office address: ------- is as under: -
The bid capacity of the contractor shall be determined by the following formula: Bid Capacity = (A x N x 2) – B Where, ‘A’ = maximum value of works executed in any one year during last five financial years. ‘B’ = Value of existing commitments and ongoing works calculated from last date of month previous to one in which this NIT has been published, to be completed in the next ‘N’ years. ‘N’ = Number of years prescribed for completion of the subject contract. Ongoing Works also include work under extension.
Particulars Amount (in INR (₹) )
Bid Capacity (A x N x 2)-B
1. Maximum value of works executed (“A”) would represent the highest turnover among the last 5 financial years. 2. Financial data (i.e., value of works executed in any one year i.e., annual turnover) will be brought to current costing level by enhancing the actual value of work at simple rate of 7% per annum or part thereof calculated from the last date of that financial year. The last date of that financial year shall be excluded for the purpose of calculating escalation and last date of month previous to the commencement date of sale/download of tender shall be included for the purpose of calculating escalation. 3. Separate Performa shall be used for each member in case of JV (unincorporated) / Consortium. 4. All such documents reflect the Bid capacity of the bidder or member in case of JV (unincorporated) / Consortium, and not that of sister or parent company. 5. The Bid capacity in above format shall be certified by practicing Chartered Accountant / Company Auditor on his letterhead, under his signature and seal having membership no./FRN and UDIN. Bidder shall fill the data in excel sheet as mentioned in the certificate and then upload the certificate with bid.
We have obtained all the information from the Bidder which is necessary for the purpose of certification. It is certified that all the information are correct to the best of our knowledge and belief. It is certified that during certification, all supporting documents were examined by us.
(Signature, Seal having membership no./ FRN of Chartered Accountant with UDIN)
ADDITIONAL PQ CRITERIA
Tender Number NPCIL/KK-3&4/CONST/MECH/PT/2026/23
Name of Bidder/ Enterprise / Company/Legal Entity
S.No. Description Details
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: In Charge, CMM (Works Group)
Name of Work: Supply, fabrication and erection of structural steel, erection of monorail, hoist and miscellaneous structures at KKNPP-3&4.
Contract No: NPCIL/KK-3&4/CONST/MECH/PT/2026/23
Sl. No. Item Description SOQ Item No (NPCIL Referance No) Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency Quoted item RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category Rate of applicable GST rate (%) included in the quoted Price CGST Rate ( %) SGST Rate (%) IGST Rate (%)
1 Supply of structural steel materials of various shapes and sections (angle, beam and channel, etc), rounds, plates, flats, etc, confirming to IS2062-2011 and grade E250 with quality of steel BR/C or its equivalent approved by NPCIL. This includes assessment of material requirement as per the approved drawings, procurement of materials of NPCIL approved make with test certificates, sample test of materials, delivery at site, handling, loading and unloading, transportation and storage, inspection at contractor's store, preparation of IMIR(Incoming Material Inspection Report), arrangement of manpower, tools and tackles, P&M, etc as per EIC instruction. 1 150 MT 0.0000 Excess(+) Full Conversion INR
2 Bending of I beams (monorail beams) size upto 300mm to the required profile and radius of curvature with cold process as per approved procedures/drawings at KKNPP premises. This includes preparation of procedure, quality plan, reports, handling, transportation of materials from site to bending shopfloor and vice versa, required manpower, Plant&Machineries, tools and tackles, material handling equipment, loading and unloading of materials, storage, preservation, consumables and PPEs, etc., as per EIC instruction. 2 30 MT 0.0000 Excess(+) Full Conversion INR
3 Erection of any type and profile of crane rail confirming to ISCR(Indian standard crane rail section / KP(Russian standard crane rail section)/ISMB (Indian Standard Medium weight Beam) inclusive of all accessories and fasteners, receipt of materials from EIC store, cutting of rails to the required length, splicing of rails with welding/bolting, grit blasting, painting and finishing as per approved drawings and specification / manufacturer instruction manual / erection and alignment procedures at various elevations and buildings of KKNPP-3&4. This item includes preparation of procedures, cutting plan, Quality plan, reports, transportation and storage of materials to erection site from EIC store within KKNPP premises, required manpower, machineries, tools and tackles, erection equipments, material handling equipment, fitup and welding of rail accessories like rail clamps and stoppers, etc., as per approved drawings, alignment and clamping of rails, torquing of clamp bolts, calibrated measuring instruments, torque wrenches of various range with calibration, Total station instrument with surveyor for alignment inspection of rails, supply of welding electrodes and consumables, housekeeping and PPEs, etc. as per EIC instruction. (Erection of scaffolding & grit blasting and painting shall be measured and paid under relevant SOQR item). 3 80 MT 0.0000 Excess(+) Full Conversion INR
4 Fabrication of structural steel brackets and miscellaneous structures as per approved drawings: Fabrication involves preparation of detailed metal structure drawing, cutting, grinding, drilling, machining, welding, machining, bending and surface preparation & painting, etc., This includes preparation of procedures, reports, required manpower, handling, transportation of materials, fabrication facilities, machineries, tools and tackles, material handling equipment, welding electrodes, consumables, housekeeping and PPEs, etc., as per EIC instruction. (Surface preparation and painting shall be measured and paid under relevant SOQR item). 4 70 MT 0.0000 Excess(+) Full Conversion INR
5 Erection of structural steel brackets and miscellaneous structures as per approved drawings. Erection of fabricated brackets inclusive of various sizes of bolts, washer, nuts and lock nuts and welding as per approved procedures at various elevations and building of KKNPP-3&4. This item includes preparation of procedures, reports, required manpower, handling, transportation of materials, machineries, tools and tackles, material handling equipments, alignment, inspection, total station instrument with surveyor for inspection wherever required, calibrated measuring instruments, supply of welding electrodes & filler wires, other consumables, housekeeping and PPEs, etc., as per EIC instruction. (Erection of scaffolding shall be measured and paid under relevant SOQR item). 5 70 MT 0.0000 Excess(+) Full Conversion INR
6 Erection of scaffolding and platforms including scaffolding materials, required qualified manpower, preparation of procedure, reports, tools and tackles, consumables, handling, shifting, transportation and storage of materials, etc at various elevations and buildings of KKNPP-3&4, dismantling, housekeeping and transportation of scaffolding to contractor store as per EIC instruction. 6 80000 Cu. Meter 0.0000 Excess(+) Full Conversion INR
7 Supply of cast iron weights of each 20Kg. This includes supply of materials as per technical specification, handling and transportation of materials, delivery at site, shifting and stacking of items at EIC store, preparation of IMIR, required manpower, tools and tackles, material handling equipment, consumables and PPEs, etc., as per EIC instruction. 7 250 Nos. 0.0000 Excess(+) Full Conversion INR
8 Supply of cast iron weights of each 50Kg. This includes supply of materials as per technical specification, handling and transportation of materials, delivery at site, material inspection, required manpower, tools and tackles, material handling equipment, consumables and PPEs, etc., as per EIC instruction. 8 100 Nos. 0.0000 Excess(+) Full Conversion INR
9 Erection and testing of Material Handling Equipment(MHE) like stationary gear hoist, gear mobile hand operated hoist and hand operated grapplers of capacities as mentioned below at various elevations and buildings of KKNPP-3&4 as per approved procedures. This includes preparation of test procedures, reports, shifting of MHE and test loads from EIC store to erection site, shifting test loads to EIC store after load test, shifting, handling and transportation, manpower, Plant and Machineries, loading and unloading, tools and tackles, material handling equipment, consumables, housekeeping and PPEs, etc., as per EIC instruction. (Erection of scaffolding shall be measured and paid under relevant SOQR item. The shifting of test load is included in this item and hence no payment shall be paid under SOQR.item.25 separately). 9
9.1 Material handling equipment upto 1T capacity 9.1 660 Nos. 0.0000 Excess(+) Full Conversion INR
9.2 Material handling equipment above 1T and upto 5T capacity 9.2 140 Nos. 0.0000 Excess(+) Full Conversion INR
10 Dismantling, shifting and storage of Material Handling Equipment(MHE) like stationary hoist, gear mobile hand operated hoist and grapplers of various capacities and sizes from various elevations and building of KKNPP-3&4. This includes manpower, Plant and Machineries, material handling equipment, tools and tackles, handling and transportation, loading and unloading, shifting of dismantled materials to EICs store, consumables, housekeeping and PPEs, etc as per EIC instruction. (Erection of scaffolding shall be measured and paid under relevant SOQR item). 10
10.1 Material handling equipment upto 1T capacity 10.1 660 Nos. 0.0000 Excess(+) Full Conversion INR
10.2 Material handling equipment above 1T and upto 5T capacity 10.2 140 Nos. 0.0000 Excess(+) Full Conversion INR
11 Dismantling erected steel structural members like lifting lugs, support brackets and miscellaneous temporary structures of various dimensions and weights, etc., welded/bolted with the existing permanent structures at various elevations and building of KKNPP-3&4 inclusive of cutting, grinding, finishing and painting touch up on permanent structures. This includes manpower, Plant and Machineries, material handling equipment, tools and tackles, loading and unloading, shifting to EIC store at KKNPP premises, consumables, housekeeping and PPEs, etc as per EIC instruction. (Erection of scaffolding shall be measured and paid under relevant SOQR item). 11 10 MT 0.0000 Excess(+) Full Conversion INR
12 Opening on RCC floor/wall by core cutting to the hole size φ 3" includes required manpower, manpower, Plant and Machineries, marking, material handling equipment, tools and tackles, handling and transportation, shifting, loading and unloading, consumables, removal of concrete debris, housekeeping and PPEs, etc as per EIC instruction. (Erection of scaffolding shall be measured and paid under relevant SOQR item). 12 20 RM 0.0000 Excess(+) Full Conversion INR
13 Opening on RCC floor/wall by core cutting to the hole size φ 6" includes required manpower, manpower, Plant and Machineries, marking, material handling equipment, tools and tackles, handling and transportation, shifting, loading and unloading, consumables, removal of concrete debris, housekeeping and PPEs, etc as per EIC instruction. (Erection of scaffolding shall be measured and paid under relevant SOQR item). 13 20 RM 0.0000 Excess(+) Full Conversion INR
14 Installation of following HILTI make anchor fasteners without core cutting of concrete at various elevations, loactions and buildings at KKNPP-3&4 as per approved drawings/specifications/manufacturer instruction manual : This includes receipt of materials from EIC's store or point of delivery, identification, marking, drilling in reinforced concrete on wall, floor and ceiling, disposal of debris, cleaning and fixing of anchor fasteners, torquing, calibrated torque wrench, required manpower, preparation of procedures, permits, Job Hazard Analysis, tools and tackles, Plant and Machineries, consumables, housekeeping and PPEs, etc., as per EIC's instruction. (Erection of scaffolding shall be measured and paid under relevant SOQR item). 14
14.1 HDA-T-M12X 125/30 14.1 300 Nos. 0.0000 Excess(+) Full Conversion INR
14.2 HDA-T- M12X125/50 14.2 200 Nos. 0.0000 Excess(+) Full Conversion INR
14.3 HSL-4G-M10/20 14.3 500 Nos. 0.0000 Excess(+) Full Conversion INR
14.4 HSL-4G-M12/25 14.4 500 Nos. 0.0000 Excess(+) Full Conversion INR
14.5 HST-M16/140 14.5 300 Nos. 0.0000 Excess(+) Full Conversion INR
14.6 HST-M12 14.6 1000 Nos. 0.0000 Excess(+) Full Conversion INR
15 Installation of following HILTI make anchor fasteners with core cutting of concrete at various elevations, locations and buildings at KKNPP-3&4 as per approved drawings/specifications/manufacturer instruction manual : This includes receipt of materials from EIC's store or point of delivery, identification, marking, concrete core cutting on wall, floor and ceiling, disposal of debris, cleaning and fixing of anchor fasteners, torquing, calibrated torque wrench, required manpower, preparation of procedures, permits, Job Hazard Analysis, tools and tackles, Plant and Machineries, consumables, housekeeping and PPEs, etc., as per EIC's instruction. (Erection of scaffolding shall be measured and paid under relevant SOQR item). 15
15.1 HAD-T-M16X190/40 15.1 300 Nos. 0.0000 Excess(+) Full Conversion INR
15.2 HDA-T-M12X 125/30 15.2 200 Nos. 0.0000 Excess(+) Full Conversion INR
15.3 HDA-T- M12X125/50 15.3 100 Nos. 0.0000 Excess(+) Full Conversion INR
15.4 HSL-4G-M12/25 15.4 200 Nos. 0.0000 Excess(+) Full Conversion INR
15.5 HST-M16/140 15.5 200 Nos. 0.0000 Excess(+) Full Conversion INR
16 Miscellaneous works such as assistance in commissioning of equipment/system, modifications on free issue materials suit to site requirement which comprises grinding, painting, rigging operation, fitup, welding, concrete chipping and cleaning includes required manpower, tools and tackles, Plant and Machineries, consumables, handling, loading and unloading, housekeeping and PPEs, etc., at various locations, elevations and buildings of KKNPP-3&4 as per EICs instruction. (Erection of scaffolding shall be measured and paid under relevant SOQR item). 16
16.1 Manual grinding operation by a grinder 16.1 700 Operation days 0.0000 Excess(+) Full Conversion INR
16.2 Rigging operation by a rigger 16.2 700 operation days 0.0000 Excess(+) Full Conversion INR
16.3 Fitup operation by a fitter and a helper 16.3 700 Operation days 0.0000 Excess(+) Full Conversion INR
16.4 Welding of metal structure by a qualified welder with free issue welding electrodes. 16.4 700 Operation days 0.0000 Excess(+) Full Conversion INR
16.5 Chipping of concrete surfaces on wall, floor and ceiling by an operator with suitable power hammer and breaker machine 16.5 700 Operation days 0.0000 Excess(+) Full Conversion INR
16.6 Cleaning of erected and commissioned material handling equipment by a helper 16.6 2000 Operation days 0.0000 Excess(+) Full Conversion INR
16.7 Manual painting by a qualified painter 16.7 500 Operation days 0.0000 Excess(+) Full Conversion INR
17 Carrying out DPT (NDT) for welded joints by ISNT level -II qualified personnel at various buildings and locations in KKNPP-3&4 as per approved QP. This item includes identification of joints, preparation of procedures and reports, qualified manpower, all consumables, DPT materials (dye penetrant, cleaning agent and developer), post cleaning of joints and PPEs etc. as per EIC instruction. (Erection of scaffolding shall be measured and paid under relevant SOQR item). 17 720 RM 0.0000 Excess(+) Full Conversion INR
18 Surface preparation of steel structure to surface profile Sa-2.5 confirming ISO8501 by grit blasting with steel grits and application of NPCIL approved Epoxy based Zinc rich primer to the thickness of 70 micron includes supply of primer, storage, handling and shifting of materials, grit materials, grit blasting equipment, preparation of procedures & reports, qualified manpower, consumables, tools and tackles, enclosed blasting shop, DFT instrument and PPEs etc., as per EIC instruction 18 2000 Sq. Meter 0.0000 Excess(+) Full Conversion INR
19 Supply and application of NPCIL approved epoxy based top coat to thickness of 160 micron in two coats includes storage, handling and shifting of materials, painting shop, surface cleaning, preparation of procedures and reports, qualified manpower, plant and machineries, tools and tackles, consumables, DFT instrument and PPEs as per EIC instruction. 19 2000 Sq. Meter 0.0000 Excess(+) Full Conversion INR
20 Supply of fire retardant tarpaulin made from PVC coated synthetic fabric having mass per unit area 400 gsm(min.) confirming to the latest of IS 14597 with manufacturer test certificate. Tarpaulin shall be blue/silver colour with matt finish, steel eyelets & PP rope. Each tarpaulin shall be legibly marked on one side as per IS 14597 for traceability with test certificate issued by manufacturer. The size of tarpaulin shall be 10mX10m. This includes packing & forwarding, delivery at site, manpower, handling , loading and unloading, transportation, storage, inspection and preparation reports, etc., as per EIC instruction. 20 1000 Sq. Meter 0.0000 Excess(+) Full Conversion INR
21 Supply of following size & type of fasteners with washers, nuts and lock nuts confirming the latest IS specification, this item includes procurement of materials with test certificate, delivery to site, inspection of materials at contractor's store, sample test if required, preparation of IMIR, storage and preservations of materials, arranging manpower, P&M and tools & tackles, etc., as per EIC instruction. 21
21.01 Set of Hexagonal Full threaded Bolt with zinc coating (hot dip galvanizing) minimum 40microns as per IS1367, Nut , lock Nut and 2 plain washers. Size: M12 x 60 mm long. Bolt: 8.8 grade as per IS 1367, Nut: Class 8 as per ISO 4032, Washers: Plain washer as per IS 2016 21.01 2000 Sets 0.0000 Excess(+) Full Conversion INR
21.02 Set of Hexagonal Full threaded Bolt with zinc coating (hot dip galvanizing) minimum 40microns as per IS1367, Nut , lock Nut and 2 plain washers. Size: M12 x 80 mm long. Bolt: 8.8 grade as per IS 1367, Nut: Class 8 as per ISO 4032, Washers: Plain washer as per IS 2016 21.02 2000 Sets 0.0000 Excess(+) Full Conversion INR
21.03 Set of Hexagonal Full threaded Bolt with zinc coating (hot dip galvanizing) minimum 40microns as per IS1367, Nut , lock Nut and 2 plain washers. Size: M12 x 120 mm long. Bolt: 8.8 grade as per IS 1367, Nut: Class 8 as per ISO 4032, Washers: Plain washer as per IS 2016 21.03 500 Sets 0.0000 Excess(+) Full Conversion INR
21.04 Set of Hexagonal Full threaded Bolt with zinc coating (hot dip galvanizing) minimum 40microns as per IS1367, Nut , lock Nut and 2 plain washers. Size: M16 x 60 mm long. Bolt: 8.8 grade as per IS 1367, Nut: Class 8 as per ISO 4032, Washers: Plain washer as per IS 2016 21.04 1000 Sets 0.0000 Excess(+) Full Conversion INR
21.05 Set of Hexagonal Full threaded Bolt with zinc coating (hot dip galvanizing) minimum 40microns as per IS1367, Nut , lock Nut and 2 plain washers. Size: M16 x 80 mm long. Bolt: 8.8 grade as per IS 1367, Nut: Class 8 as per ISO 4032, Washers: Plain washer as per IS 2016 21.05 1000 Sets 0.0000 Excess(+) Full Conversion INR
21.06 Set of Hexagonal Full threaded Bolt with zinc coating (hot dip galvanizing) minimum 40microns as per IS1367, Nut , lock Nut and 2 plain washers. Size: M16 x 120 mm long. Bolt: 8.8 grade as per IS 1367, Nut: Class 8 as per ISO 4032, Washers: Plain washer as per IS 2016 21.06 600 Sets 0.0000 Excess(+) Full Conversion INR
21.07 Set of Half threaded bolt with zinc coating (hot dip galvanizing) minimum 40microns as per IS1367, Nut, Lock Nut and 2 plain washers. Size: M16 x 150 mm long. Bolt: 8.8 grade as per IS 1367, Nut: Class 8 as per ISO 4032, Washers: Plain washer as per IS 2016 21.07 600 Sets 0.0000 Excess(+) Full Conversion INR
21.08 Set of Hexagonal Full threaded Bolt with zinc coating (hot dip galvanizing) minimum 40microns as per IS1367, Nut , lock Nut and 2 plain washers. Size: M20 x 60 mm long. Bolt: 8.8 grade as per IS 1367, Nut: Class 8 as per ISO 4032, Washers: Plain washer as per IS 2016 21.08 1000 Sets 0.0000 Excess(+) Full Conversion INR
21.09 Set of Hexagonal Full threaded Bolt with zinc coating (hot dip galvanizing) minimum 40microns as per IS1367, Nut , lock Nut and 2 plain washers. Size: M20 x 120 mm long. Bolt: 8.8 grade as per IS 1367, Nut: Class 8 as per ISO 4032, Washers: Plain washer as per IS 2016 21.09 600 Sets 0.0000 Excess(+) Full Conversion INR
Set of half threaded bolt with zinc coating (hot dip galvanizing) minimum 40microns as per IS1367, Nut, Lock Nut and 2 plain washers. Size: M20 x 150 mm long. Bolt: 8.8 grade as per IS 1367, Nut: Class 8 as per ISO 4032, Washers: Plain washer as per IS 2016 600 Sets 0.0000 Excess(+) Full Conversion INR
Set of Hexagonal Full threaded Bolt with zinc coating (hot dip galvanizing) minimum 40microns as per IS1367, Nut , lock Nut and 2 plain washers. Size: M24 x 120 mm long. Bolt: 8.8 grade as per IS 1367, Nut: Class 8 as per ISO 4032, Washers: Plain washer as per IS 2016 600 Sets 0.0000 Excess(+) Full Conversion INR
Set of half threaded bolt with zinc coating (hot dip galvanizing) minimum 40microns as per IS1367, Nut, Lock Nut and 2 plain washers. Size: M24 x 150 mm long. Bolt: 8.8 grade as per IS 1367, Nut: Class 8 as per ISO 4032, Washers: Plain washer as per IS 2016 500 Sets 0.0000 Excess(+) Full Conversion INR
Taper washer for bolt Size M16 as per IS 5374 500 Nos. 0.0000 Excess(+) Full Conversion INR
Taper washer for bolt Size M20 as per IS 5374 500 Nos. 0.0000 Excess(+) Full Conversion INR
Taper washer for bolt Size M24 as per IS 5374 500 Nos. 0.0000 Excess(+) Full Conversion INR
Supply, fabrication and fixing of Galvanized structural steel unequal angle section fabricated from rectangular/square hollow section suitable to close gaps ~75-100mm around the doors of various capacities lifts at various buildings and elevations of KKNPP-3&4. The structural steel hollow section materials shall confirm to IS16732 & IS4923. Fabrication includes cutting and finishing to the required size suitable for closing the gaps, fixing around gaps with screws/anchor fasteners on walls and application of silicon based sealant (white color) around the mating areas. This item consists of assessment of material suit to site requirement, procurement of materials, delivery at site, handling, loading and unloading, transportation and storage, inspection at contractor's store, preparation of IMIR(Incoming Material Inspection Report), required manpower, tools and tackles, screw/anchor materials, material handling equipment, P&M, consumables and PPEs, etc., as per EIC instruction. (Erection of scaffolding shall be measured and paid under relevant SOQR item). 600 RM 0.0000 Excess(+) Full Conversion INR
Supply, fabrication and fixing of galvanized structural steel sheet of 1mm thickness at various buildings and elevations of KKNPP-3&4. The galvanized structural sheet materials shall confirm to IS277. Fabrication includes cutting and finishing to the required size suitable for closing the gaps, fixing around gaps with screws on walls and application of silicon based sealant (white color) around the mating areas. This item consists of assessment of material suit to site requirement, procurement of materials, delivery at site, handling, loading and unloading, transportation and storage, inspection at contractor's store, preparation of IMIR(Incoming Material Inspection Report), required manpower, tools and tackles, materials handling equipment, P&M, consumables and PPEs, etc., as per EIC instruction. (Erection of scaffolding shall be measured and paid under relevant SOQR item). 40 Sq. Meter 0.0000 Excess(+) Full Conversion INR
Supply of HILTI make anchor fasteners of required type and size as mentioned below including procurement with material test certificate, transportation, delivery at site, handling, inspection at contractor's store, preparation of IMIR, storage and preservation, arrangement of manpower, consumables, tools and tackles and PPEs, etc, as per EIC instruction.
0.0 HST-R M16X145 0.0 500 Nos. 0.0000 Excess(+) Full Conversion INR
0.9 HST4 M8X95 0.9 1000 Nos. 0.0000 Excess(+) Full Conversion INR
Shifting of test loads (cast iron blocks / steel plates/concrete blocks) inside KKNPP premises upto 5 km lead. The weight of each test load is upto 25MT. The dimension shall be as specified in the technical specification. This item includes required manpower, transportation, handling, loading and unloading of material, stacking, tools and tackles, consumables, material handling equipments, trailer, suitable capacity of cranes and PPEs., as per EIC instruction. 700 MT 0.0000 Excess(+) Full Conversion INR
Applicable GST Rate (%) Included in the Quoted Price
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
TenderDocument.pdf
Tender Documents • 8.70 MB
Technocommercial_Bid_Formats.xls
Other Document • 0.21 MB
BOQ_313286.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid