Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹53.1 LAccepted-AOC FLAT 1 21 A P SEN ROAD CHARBAGH LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | ₹53.1 L | 1 | Accepted-AOC DOS |
| 2 | 2₹60.3 LRejected-Finance | ₹60.3 L | 2 | Rejected-Finance Not Being Lowest |
| 3 | Rejected-Technical | - | - | Rejected-Technical Particular Documents Incomplete |
| 4 | Rejected-Technical 285001 | ALIGARH | UTTAR PRADESH | 285001 | - | - | Rejected-Technical Particular Documents Incomplete |
| Sl No | Description | Qty | Unit | SHOBHA ENTERPRISES L1 | santosh kumar pal L2 |
|---|---|---|---|---|---|
| 1.00 | Cutting heavy under growth, and bushes up to 7.5 cm diameter including removal of roots with collection and removal as directed by Engineer-in-charge. | 7,225 | M2 | 6 ₹43,350 Lowest | 20 ₹1,44,500 |
| 2.00 | Removal of slush | 243 | M3 | 250 ₹60,750 | 100 ₹24,300 Lowest |
| 3.00 | Earth work in embankment and restoring of canal section in all type of soil i/c proper dressing, making profile, compaction of earth work including all type labour, all lead & lift, T&P, watering etc complete in all as per direction of the Engineer incharge. | 2,792.51 | M3 | 200 ₹5,58,502 | 120 ₹3,35,101.2 Lowest |
| 4.00 | Earth work in Cutting for making canal section & key drains for canal lining in all type of strata with all lead & lift including all material, labour, T&P etc required for proper completion of work. | 908.49 | M3 | 110 ₹99,933.9 | 100 ₹90,849 Lowest |
| 5.00 | Prepration of Subgrade (excluding cost of earth work) | 4,380.17 | M2 | 8 ₹35,041.36 Lowest | 20 ₹87,603.4 |
| 6.00 | P/L cement mortar/plaster 1:4 CM at prep subgrade on slope including all cost of labour, T&P etc required for proper completion of work. | 2,453.4 | M2 | 150 ₹3,68,010 Lowest | 199 ₹4,88,226.6 |
| 7.00 | P/Laying sand in bed & patri i/c all cost of labour, material T&P etc | 107.87 | M³ | 1,100 ₹1,18,657 Lowest | 1,500 ₹1,61,805 |
| 8.00 | Providing two coat of bituminuos compound over concrete sleeper I/C cost of all material, labour, T&P etc required for proper completation of work. | 738.14 | M2 | 110 ₹81,195.4 | 100 ₹73,814 Lowest |
| 9.00 | Providing & laying 200 micron LDPE film black polythene sheet below C.C. lining including cost of all material, labour & T&P etc required for proper completion of work. | 5,118.3 | M2 | 40 ₹2,04,732 | 25 ₹1,27,957.5 Lowest |
| 10.00 | Providing and fixing centering & shuttering for concrete work including cost of all material, labour, T&P etc required for proper completion of work. with it’s removal. | 2,123.14 | M2 | 349 ₹7,40,975.86 | 300 ₹6,36,942 Lowest |
Tender Value
₹77.4 L
EMD Value
₹1.6 L
Closing Date
14 May 2026, 12:00 pmClosed
Superintending Engineer
Office of The Superintending Engineer, Tubewell Circle, Gwalior Road, Civil Lines, Jhansi
Construction of CC Lining in Parichha Minor from 3rd VRB to 1.30 km of Badagaon Pump Canal, District Jhansi LOT-2
2026_UPIDM_1145585_2
02/TWCJ/SE/2026-27
Open Tender
Civil Works
Item Rate
120 days
Badagaon Pump Canal District Jhansi
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹1.6 L
25 Jun 2026
5 May 2026
14 May 2026
5 May 2026
14 May 2026
5 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting heavy under growth, and bushes up to 7.5 cm diameter including removal of roots with collection and removal as directed by Engineer-in-charge. | 7,225 | M2 | - | - |
| 2 | Removal of slush | 243 | M3 | - | - |
| 3 | Earth work in embankment and restoring of canal section in all type of soil i/c proper dressing, making profile, compaction of earth work including all type labour, all lead & lift, T&P, watering etc complete in all as per direction of the Engineer incharge. | 2,792.51 | M3 | - | - |
| 4 | Earth work in Cutting for making canal section & key drains for canal lining in all type of strata with all lead & lift including all material, labour, T&P etc required for proper completion of work. | 908.49 | M3 | - | - |
| 5 | Prepration of Subgrade (excluding cost of earth work) | 4,380.17 | M2 | - | - |
| 6 | P/L cement mortar/plaster 1:4 CM at prep subgrade on slope including all cost of labour, T&P etc required for proper completion of work. | 2,453.4 | M2 | - | - |
| 7 | P/Laying sand in bed & patri i/c all cost of labour, material T&P etc | 107.87 | M³ | - | - |
| 8 | Providing two coat of bituminuos compound over concrete sleeper I/C cost of all material, labour, T&P etc required for proper completation of work. | 738.14 | M2 | - | - |
| 9 | Providing & laying 200 micron LDPE film black polythene sheet below C.C. lining including cost of all material, labour & T&P etc required for proper completion of work. | 5,118.3 | M2 | - | - |
| 10 | Providing and fixing centering & shuttering for concrete work including cost of all material, labour, T&P etc required for proper completion of work. with it’s removal. | 2,123.14 | M2 | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.15 MB
LOT_2Docs.pdf
Tender Documents • 3.25 MB
BOQ_2141648.xls
BOQ • 0.24 MB
CorrigendumLot2.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].