| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Finance VPO BANIKHET TEHSIL DALHOUSIE DISTT CHAMBA HP | L1 | Admitted-Finance | |
| 2 | L2₹5.1 L+₹6,991.95 (1.40%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹5.1 L+₹7,618.45 (1.53%)Admitted-Finance VILL SOBLI P O DEVNAGAR TEHSIL RAMPUR DISTT SHIMLA H P | SHIMLA | SHIMLA | HIMACHAL PRADESH | L3 | Admitted-Finance | |
| 4 | Rejected-Technical S O SH SANGAT SINGH R O SHASTRI NAGAR WARD NO 11 P O DHALPUR DISTT KULLU | - | Rejected-Technical Ineligible |
| Sl No | Description | Qty | Unit | Rajeev Thakur L1 | M/S Satya Dev L2 | M/S KEDAR BHALUNI L3 |
|---|---|---|---|---|---|---|
| 1.00 | Cutting in earth work in all classification of earth work such as pick work, jumper work. Blasting soft/hard rock or chiselling where blasting is prohibited and disposal of all excavated earth complete with in all leads and lifts & entire satisfaction of the Engineer-in-Charge.(Pick work 80% & Jumper work20%) | 9.9 | Cum | 580 ₹5,742 Lowest | 590 ₹5,841 | 630 ₹6,237 |
| 2.00 | Excavation in earth work and disposal of all excavated earth up to all leads and lifts, disposed earth to be levelled neatly dressed as per direction and to the entire satisfaction of the Engineer-in-Charge. | 7.61 | Cum | 580 ₹4,413.8 Lowest | 590 ₹4,489.9 | 630 ₹4,794.3 |
| 3.00 | Providing and laying cement concrete 1:5:10(1Cement: 5Sand: 10Graded stone agg.40mm nominal size)& curing complete excluding cost of form work in foundation and plinth as per direction & to the entire satisfaction of the Engineer-in-Charge with in all leads and lifts . | 43.61 | cum | 8,700 ₹3,79,407 Lowest | 8,900 ₹3,88,129 | 8,900 ₹3,88,129 |
| 4.00Providing and laying cement concrete 1:2:4(1Cement: 2Sand: 4Graded stone agg.20mm nominal size)& curing complete excluding cost of form work & reinforcement for reinforced concrete work in:- | ||||||
| 4.10 | in Foundation and plinth | 1.29 | cum | 13,800 ₹17,802 | 13,000 ₹16,770 | 12,800 ₹16,512 Lowest |
| 4.20 | Walls (any thickness but not less than 0.10m thickness) attached pillaster, buttresses, plinth & string courses etc from top of foundaation level upto floor two level as per the direction & to the entire satisfaction of the Engineer-in-Charge. | 1.35 | cum | 13,500 ₹18,225 Lowest | 13,500 ₹18,225 Lowest | 13,600 ₹18,360 |
| 4.30 | Providing mild steel / tor steel reinforcement for reinforced cement concrete work including bending, binding and placing in position complete upto floor two level complete in all leads and lifts and as per the direction and to the entire satisfaction of the Engineer-in-Charge. Tor Steel. | 164.81 | Kg | 140 ₹23,073.4 | 125 ₹20,601.25 Lowest | 135 ₹22,249.35 |
| 5.00Prov.form work with steel plates 3.15mm thick welded with angle iron frame 30 x 30 x 5mm so as to give a fair finish including centring, shuttering,strutting & propping etc. with wooden battens and ballies, height of propping & centering below supporting floor to ceiling not exceeding 4mtr.& removal of same for insitu rainforced concrete and plain concrete work complete in all leads and lifrs and as per the directioin and to the entire satisfaction of the Engineer-in-Charge :- | ||||||
| 5.10 | Vertical surfaces such as walls ( any thickness ) partition and the like including attached pillasters buttresses, plinth and string courses and the like. | 79.95 | sqm | 620 ₹49,569 Lowest | 640 ₹51,168 | 620 ₹49,569 Lowest |
Tender Value
₹4.6 L
EMD Value
₹9,246
Closing Date
24 Sept 2026, 11:00 amClosed
EE JSD Rampur
JSD Rampur
C.O. R wall E Wall to protect main channel and RCC lining
2026_HPIPH_143404_1
7393-7443 Dated 14.09.2026
Open Tender
Civil Works
Item Rate
Rampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹350
₹9,246
9 Oct 2026
14 Sept 2026
24 Sept 2026
14 Sept 2026
24 Sept 2026
14 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Cutting in earth work in all classification of earth work such as pick work, jumper work. Blasting soft/hard rock or chiselling where blasting is prohibited and disposal of all excavated earth complete with in all leads and lifts & entire satisfaction of the Engineer-in-Charge.(Pick work 80% & Jumper work20%) | |||||
| 2Excavation in earth work and disposal of all excavated earth up to all leads and lifts, disposed earth to be levelled neatly dressed as per direction and to the entire satisfaction of the Engineer-in-Charge. | |||||
| 3Providing and laying cement concrete 1:5:10(1Cement: 5Sand: 10Graded stone agg.40mm nominal size)& curing complete excluding cost of form work in foundation and plinth as per direction & to the entire satisfaction of the Engineer-in-Charge with in all leads and lifts . | |||||
| 4Providing and laying cement concrete 1:2:4(1Cement: 2Sand: 4Graded stone agg.20mm nominal size)& curing complete excluding cost of form work & reinforcement for reinforced concrete work in:- | |||||
| 4.1 | in Foundation and plinth | 1.29 | cum | - | - |
| 4.2 | Walls (any thickness but not less than 0.10m thickness) attached pillaster, buttresses, plinth & string courses etc from top of foundaation level upto floor two level as per the direction & to the entire satisfaction of the Engineer-in-Charge. | 1.35 | cum | - | - |
| 4.3 | Providing mild steel / tor steel reinforcement for reinforced cement concrete work including bending, binding and placing in position complete upto floor two level complete in all leads and lifts and as per the direction and to the entire satisfaction of the Engineer-in-Charge. Tor Steel. | 164.81 | Kg | - | - |
| 5Prov.form work with steel plates 3.15mm thick welded with angle iron frame 30 x 30 x 5mm so as to give a fair finish including centring, shuttering,strutting & propping etc. with wooden battens and ballies, height of propping & centering below supporting floor to ceiling not exceeding 4mtr.& removal of same for insitu rainforced concrete and plain concrete work complete in all leads and lifrs and as per the directioin and to the entire satisfaction of the Engineer-in-Charge :- | |||||
| 5.1 | Vertical surfaces such as walls ( any thickness ) partition and the like including attached pillasters buttresses, plinth and string courses and the like. | - | sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
Form6.pdf
Tender Documents • 0.29 MB
F8.pdf
Tender Documents • 1.09 MB
Terms.pdf
Tender Documents • 0.15 MB
BOQ_213070.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .