| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 CrAdmitted-Finance 368 369 2ND FLOOR BASANT BUILDING CHAUDHARY MARKET SULTANPUR SOUTH WEST DELHI DELHI 110030 | SOUTH DELHI | DELHI | 110030 | +4.00% | ₹1.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.8 Cr+₹6.8 L (3.86%)Admitted-Finance | -2.00% | ₹1.8 Cr+₹6.8 L (3.86%) | L2 | Admitted-Finance |
Tender Value
₹1.9 Cr
EMD Value
₹1.9 L
Closing Date
9 Nov 2020, 6:00 pmClosed
Executive Engineer M and H, Dn. I Jaipur
Executive Engineer M and H, Dn. I Jaipur
SITC of Oxygen Generator Plant at Distt. Hospital Hanumangarh, Jaisalmer, Jalore, Pratapgarh and Sirohi in Rajasthan.
2020_MEDIC_204971_2
NIT 54/2020-21 EE M and H Dn. I Jaipur/
Open Tender
Electrical Works
Percentage
60 days
Jaipur
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
RTGS/NEFT/Any other money Transfer System
₹1.9 L
19 Nov 2020
3 Nov 2020
10 Nov 2020
3 Nov 2020
9 Nov 2020
3 Nov 2020
Amount
SITC of Pressure Swing Absorption Oxygen Generator Plant capacity 150 to 160 LPM or 353 SCFH equal to 35 (Approx. )Jumbo Cylinders per day with stand alone two compressor and two dryers working in tendem As per ISO 13485 and as per following Specifications:
Purity of Oxygen 93%± 3% @4.1 bar pressure
Rotary Screw type air compressor of suaitable capacity ( 2 Nos) as per afore mention capacity 400 V /3 Phase /50 HZ ,Outlet pressure 5BAR,Maximum Output Pressure 10 BAR, Power Supply 110-240 V, 1 phase , 50 Hz , UPS Module for control only with medical upgrade kit , Coal Tower , carbon filter , Bacteria/ Sterile .
The unit should comprise four stage air filtration , consists of moisture seperator , 0.1 micron pre filter before the Refrigerated air dryer , another two filters 0.1 and 1 micron after the dryer then a carbon tower which makes sure 0 oil and vapour in the down stream air. The carbon should last for more than two years . and it should be provided 1 micron filter after carbon tower. Beneath this filter a moisture alarm should be incorporated to switch off the PSA system in case of dryer auto drain failure .
This unit should also comprise of 1nos air receiver 750 Litres , oxygen /Buffer tanks 750 Ltrs as per standards, an in-line flow meter , certifying the capacity shall be installed at the outlet of the oxygen receiver
In case PSA Oxygen Generator failure , an auto switch over system to regular supply for oxygen is incorporated so that automatically back up from cylinders shall be taken over. To show this effect an alarm system should be installed with this system.
All the system piping and fittings , all the interconnections , and piping up to manifold room shall be of stainless steel .
This system should be comprising of OFF -Spec Valve to prevent the supply of impure oxygen to go into the system if the purity goes to below the 90% .
The Unit can be monitor on line through by service team /authorised person 24/7 on no extra cost
The Connected electricity load should not be more than 20 KW
The Flow Meter certifying the capacity should be also there
Above Oxygen Generator should be ISO:13485/CE/US FDA certified. In support of this certification , Notified third party inspection certificate with test results is mandatory.
UNISSI INDIA PVT LTD
Agastya Aeroworks Pvt Ltd
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.22 MB
Tendernotice_2.pdf
PDF • 2.71 MB
Tendernotice_3.pdf
PDF • 0.07 MB
Tendernotice_4.pdf
PDF • 2.39 MB
Terms_and_conditions_Oxy_genrator.pdf
Tender Documents • 0.12 MB
BOQ_365614.xls
BOQ • 0.32 MB
DLP_TC.pdf
Tender Documents • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .