Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.0 LAdmitted-Finance LOCATION HARYANA HR | GURUGRAM | HARYANA | 122001 | ₹38.0 L | L1 | Admitted-Finance |
| 2 | L2₹40.3 L+₹2.3 L (5.94%)Admitted-Finance | ₹40.3 L+₹2.3 L (5.94%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Manjeet Kumar Contractor L2 | BALBIR SINGH L1 |
|---|---|---|---|---|---|
| 1.00 | Maintenance/ Rewinding/ Repair of Submersible motor, pumps consisting mainly including of motor, pump, starter, cable, panel board (more then 20 HP) for 19 month (From the date of commencement) and all other works mentioned in Scope of Work. 300 BHP x 19 Month = Total 5700 BHP | 5,700 | Per BHP | 170 ₹9,69,000 | 160 ₹9,12,000 Lowest |
| 2.00 | Maintenance/ Rewinding/ Repair of Submersible motor, pumps consisting mainly including of motor, pump, starter, cable, panel board (upto 20 HP) for 19 month (From the date of commencement) and all other works mentioned in Scope of Work. 767.50 BHP x 19 Month = Total 14582.50 BHP | 14,582.5 | Per BHP | 180 ₹26,24,850 | 170 ₹24,79,025 Lowest |
| 3.00 | Maintenance/ Rewinding / Repair of Horizontal centrifugal pumps consisting of motor, pump, starter, cable, panel board (more than 20 HP) for 19 month (From the date of commencement) and all other works mentioned in Scope of Work. 120 BHP x 19 Month = Total 2280 BHP. | 2,280 | Per BHP | 190 ₹4,33,200 | 180 ₹4,10,400 Lowest |
Tender Value
₹27.1 L
EMD Value
₹54,231
Closing Date
22 Jun 2026, 3:00 pmClosed
BHANU PARKASH SHARMA
Jind PHED No. 1
Repair/Rewinding of Pumping Machinery for Water Supply
2026_HRY_528646_1
2026283BEBB7 0311 472E 8B78 B5467F5C668C568PUH
Open Tender
Civil Works
Works
365 days
Jind
4 documents required · 4 mandatory
₹1,500
₹54,231
Yes
3 Aug 2026
12 Jun 2026
22 Jun 2026
12 Jun 2026
22 Jun 2026
12 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Maintenance/ Rewinding/ Repair of Submersible motor, pumps consisting mainly including of motor, pump, starter, cable, panel board (more then 20 HP) for 19 month (From the date of commencement) and all other works mentioned in Scope of Work. 300 BHP x 19 Month = Total 5700 BHP | 5,700 | Per BHP | - | - |
| 2 | Maintenance/ Rewinding/ Repair of Submersible motor, pumps consisting mainly including of motor, pump, starter, cable, panel board (upto 20 HP) for 19 month (From the date of commencement) and all other works mentioned in Scope of Work. 767.50 BHP x 19 Month = Total 14582.50 BHP | 14,582.5 | Per BHP | - | - |
| 3 | Maintenance/ Rewinding / Repair of Horizontal centrifugal pumps consisting of motor, pump, starter, cable, panel board (more than 20 HP) for 19 month (From the date of commencement) and all other works mentioned in Scope of Work. 120 BHP x 19 Month = Total 2280 BHP. | 2,280 | Per BHP | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_607659.xls
BOQ • 0.31 MB
0G23ULZ135378.pdf
Additional Documents • 1.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .