| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹41.6 CrAccepted-AOC 121 THIRUMURUGAN NAGAR VEERIYAMPALAYAM ROAD KALAPATTY POST COIMBATORE 641048 | COIMBATORE | TAMIL NADU | 641048 | ₹41.6 Cr | 1 | Accepted-AOC ACCEPTED |
| 2 | 2₹42.5 CrRejected-AOC SF NO 454 RAGHUPATHYNAICKENPALAYAM RAILWAY COLONY POONDURAI MAIN ROAD ERODE | ERODE | ERODE | TAMIL NADU | ₹42.5 Cr | 2 | Rejected-AOC REJECTED |
| 3 | 3₹46.0 CrRejected-AOC NO 102 2ND FLOOR SHEIK DAWOOD STREET ERODE 638 001 | ERODE | TAMIL NADU | 638001 | ₹46.0 Cr | 3 | Rejected-AOC REJECTED |
| 4 | Rejected-Technical NO 4 GROUND FLOOR ALAYAM SPACE ANANDHA ROAD ALWARPET CHENNAI 600 018 | CHENNAI | TAMIL NADU | 600018 | - | - | Rejected-Technical rejected |
| Sl No | Description | Qty | Unit | sakthi constructions L3 | RPP INFRA PROJECTS LIMITED L2 | RSK CONSTRUCTION AND PROJECTS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Removing Existing Paver Block including all cost and conveyance labour charges etc,completed. | 14,510 | 1M2 (One square metre) | 40 ₹5.8 L | 49 ₹7.1 L | 50 ₹7.3 L |
| 2.00 | Dismantling existing RCC including all cost and conveyence of materials and labour charges etc., complete | 709.75 | 1M3 (One cubic metre) | 4,500 ₹31.9 L | 4,850 ₹34.4 L | 4,500 ₹31.9 L |
| 3.00 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. | 1,23,000 | 1M3 (One cubic metre) | 200 ₹2.5 Cr | 225 ₹2.8 Cr | 150 ₹1.8 Cr |
| 4.00 | Supplying and filling in foundation and basement with filling Crushed Stone Dust in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification. | 10,285 | 1M3 (One cubic metre) | 340 ₹35.0 L | 396 ₹40.7 L | 350 ₹36.0 L |
| 5.00 | Vibrated Cement Concrete of grade CEMENT CONCRETE - M7.5 (1:4:8) (Using 40mm HBG) metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Hire charges for Tools and plants and incidental charges etc., complete as per relevent standard specification | 7,690 | 1M3 (One cubic metre) | 5,400 ₹4.2 Cr | 5,450 ₹4.2 Cr | 5,300 ₹4.1 Cr |
| 6.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard
specification and as directed by the departmental officers. (Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) | 14,27,160 | 1Kg(one kilogram) | 95 ₹13.6 Cr | 86 ₹12.3 Cr | 70 ₹10.0 Cr |
| 7.00 | Vibrated Reinforced Cement Concrete M25 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for Odai MAT (Footting) CONCRETE | 3,981 | 1M3 (One cubic metre) | 9,600 ₹3.8 Cr | 9,550 ₹3.8 Cr | 11,000 ₹4.4 Cr |
| 8.00 | Vibrated Reinforced Cement Concrete M25 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for odai SIDE WALL | 5,225 | 1M3 (One cubic metre) | 14,500 ₹7.6 Cr | 10,900 ₹5.7 Cr | 12,000 ₹6.3 Cr |
| 9.00 | Vibrated Reinforced Cement Concrete M25 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for For Bridge Abutment & Pier Footing | 1,804 | 1M3 (One cubic metre) | 9,500 ₹1.7 Cr | 9,450 ₹1.7 Cr | 11,000 ₹2.0 Cr |
| 10.00 | Vibrated Reinforced Cement Concrete M25 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for Abutment & Pier for Bridge SIDE WALL | 1,586 | 1M3 (One cubic metre) | 11,700 ₹1.9 Cr | 10,600 ₹1.7 Cr | 12,000 ₹1.9 Cr |
Tender Value
₹53.7 Cr
EMD Value
₹53.7 L
Closing Date
10 Dec 2025, 3:00 pmClosed
COMMISSIONER
113 Thamilzh Salai(Palai Road) Thoothukudi Corporation
WIDENNING,CONSTRUCTION OF RCC LINED CANAL WITH RETAINING WALL AND RCC SOLID BRIDGE FOR BUKCLE CANEL CHANINAGE FROM 250 M TO 7140 M Theraspuram Bridge to FCI Godown in Thoothukuidi City Municipal Corporation
2025_MAWS_620585_1
E1/00049/2025
Open Tender
Civil Works - Canal
540 days
THOOTHUKUDI CORPORATION
Refer Technical Bid
2 documents required · 2 mandatory
₹0
₹53.7 L
THOOTHUKUDI CORPORATION
16 Feb 2026
6 Nov 2025
10 Dec 2025
7 Nov 2025
10 Dec 2025
1 Dec 2025
14 Nov 2025
Amount
Removing Existing Paver Block including all cost and conveyance labour charges etc,completed.
Dismantling existing RCC including all cost and conveyence of materials and labour charges etc., complete
Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.
Supplying and filling in foundation and basement with filling Crushed Stone Dust in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification.
Vibrated Cement Concrete of grade CEMENT CONCRETE - M7.5 (1:4:8) (Using 40mm HBG) metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Hire charges for Tools and plants and incidental charges etc., complete as per relevent standard specification
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers. (Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire)
Vibrated Reinforced Cement Concrete M25 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for Odai MAT (Footting) CONCRETE
Vibrated Reinforced Cement Concrete M25 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for odai SIDE WALL
Vibrated Reinforced Cement Concrete M25 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for For Bridge Abutment & Pier Footing
Vibrated Reinforced Cement Concrete M25 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for Abutment & Pier for Bridge SIDE WALL
Vibrated Reinforced Cement Concrete M25 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for DECK SLAB
Vibrated Reinforced Cement Concrete M25 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for For Parapet Wall & Piller
Vibrated Plain Cement Concrete of grade M15 (Nominal mix) P.C.C 1:2:4 using 20mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Hire charges for Tools and plants and incidental charges etc., complete as per relevent standard specification for Ramp Side Walls
Vibrated Reinforced Cement Concrete M25 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification in Flooring Canal
Vibrated Reinforced Cement Concrete M25 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for CC Pavement
Construction of Manholes of 1.75 M depths inner 0.90 M dia as per drawing or approved type precast RCCManhole chamber along sewer lines , ofapproved make and quality including supply and fixing of encapsulated PVC foot steps. The manhole shall be ofReinforced cement concrete of M25 mix ( using 10mm to 20mm ISS gauge HBBGmetal from the approved quarry including mixing, laying, consolidating, curing cost and conveyance of all materials to site with inner smooth finishing, Benching and channelling should be provided in the manhole and suitable diameter pipes for House service connection to be left in the Manholes as directed by the Engineer in-charge. The rate shall include earthwork, backfilling, and removal of surplus earth and depositing within 500m, de-watering wherever necessary, barricading, provision of danger lights etc,. Complete.
Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers.
Removal of Excavated Excess Earth away from the site to 2K.M including loading and transportation charges etc, complete as per standard specification. For 1M3
Providing Weep Holes in the RCC Retaining wall by fixing PVC pipes of 110mm 6KG OD at regular intervals as specified by the Engineer in-charge and as per the standards including the cost of material lead & lifts, cutting charges etc., complete
Providing expansion joint 12.5mm width in RCC roof slabs between RCC twin beams using PVC water bar of 150mm wide centre bulb of 4mm to 6mm thickness of approved quality and brand and including filling the inner space with suitable non-absorbent flexible and well compressible filler materials of approved quality and covering the top surface with GI sheet 30cm wide and 1.6mm thick using phill plugs, GI screws, limpet cup washers, bitumen washers, etc., complete complying with standard specifications and as directed by the departmental officers.
For Retaining wall
Providing expansion joint Bitumen Felt 15mm thick Pad including all cost and materials labour charges etc, complete as per standard specification.
For Flooring
Dewatering using 7.5 HP diesel engine pumpset including Hire charges, cost of Diesel, Engine oil, pump operator, labour charges, conveyance of pumpset and fuel to site and back, loading, unloading and any other incidental charges etc., complete.
Supply and fixing of Drain crossing pipe using RCC Pipe including cost and conveyance of all materials and labour charges etc., complete.
900 mm dia NP2 Class A
Relaying of Exisiting Interlocking Paver Block Stone 83mm thick Over a base layer of crushed stone sandfilling incl. Cost of materials laying and Labour charges etc complete complying with the standard specification and as directed by the departmental officers.
Supplying and fixing Mild Steel grills for windows, ventilators etc.,complete complying with standard specifications and as directed by the departmental officers.
Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification and as directed by the departmental officers. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Painting Old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with Two coats of best approved first quality and colour of synthetic enamel paint in all floors etc., complete complying with standard specification and as directed by the departmental officers.(The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Supplying, fabricating, erecting structural steel work for roofing welded or bolted type using MS channels, angles, plates and round bars etc. conforming to IS specification including primer coating and enamal painting as per Design given by the departmental officers etc, complete as per standard specification
Supply and delivery of following size of M.S. PIPES- SPIRAL/LONGITUDIDNAL WELDING AS PER IS 3589/2001 WITH INTERNAL LINING AND EXTERNAL COATING MADE WITH FE410 cost and conveyance of all materials to site etc,complete.
508x6.3 mm Dia
475 X 5.0 mm Dia
323.90x4.50 mm Dia
273x5.0 mm Dia
219.10x4.5 mm Dia
168.30x4.5 mm Dia
Supply and Delivery of MS specials with inside lining/epoxy coating as per IS 13260-1993 and outside coating with cement mortar 20mm thick as per IS 1916-1989 and IS 7322-1985 cost and conveyance of all materials to site etc,complete.
Fabrication charges for MS pipes and specials the rate includes material, labours charges and incidential charges etc.,Complete
Supply and Delivery of DWC Structured Wall Polyethylene Piping Systems 250mm ID SN 8 pipe (Pipe with online/offline coupler and elastomeric sealing ring) with required specials non-smooth external annular corrugated and smooth internal surface (Double wall) (SN 8 Class) for non?pressure underground sewerage, drainage application generally as per IS-16098 (Part?2) type B.
Supply and Delivery of UN PLASTICIZED NON - PRESSURE POLYVINYL CHLORIDE (PVC- U) PIPES FOR USE IN NDERGROUND DRAINAGE AND SEWERAGE SYSTEMS as per IS 15328/2003
Brick work in following Cement Mortar using best quality Burnt Clay Brick of size 8 3/4” x 4 1/4” x 2 3/4” with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge.
Plastering the surface of walls with Cement Mortar 1:4 (One cement and Four plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc., complete complying with standard specification and as directed by the departmental officers.
Lowering PVC/ DWSC rigid pipes and specials to trench and laying to proper grade and alignment, jointing with PVC couplers withcement paste.
250mm ID SN 8 pipe
SN8-SDR 34(S 16.5) 110mm dia
Refilling with excavated soil (other than sand) complying with the standard specification for pipe line trench including all cos and conveyance of labour charges
Supply and delivery of following sizes of FRC Manhole Covers / Frames to stores on as per IS 12592:2002 to its latest revision with reinforcement details for covers and frames
600mm dia FRC manhole cover to suit 600 mm clear opening manhole frame
600mm dia FRC manhole frame to have clear opening of 600mm dia to suit 600mm dia FRC Cover
RPP INFRA PROJECTS LIMITED (BID ID -1529007)
sakthi constructions (BID ID -1528961)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
2.79 MB
Tendernotice_1.pdf
PDF • 2.79 MB
Tender Documents
Tender Documents • 1.23 MB
BOQ_742090.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid