Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹42.3 LAccepted-AOC | ₹42.3 L | 1 | Accepted-AOC L-1 |
| 2 | 2₹42.7 L+₹43,306 (1.02%)Rejected-AOC | ₹42.7 L+₹43,306 (1.02%) | 2 | Rejected-AOC L-2 |
| 3 | 3₹45.9 L+₹3.6 L (8.54%)Rejected-AOC SHOP NO 31 FIRNI ROAD AC MARKET FAZILKA | FAZILKA | FAZILKA | PUNJAB | ₹45.9 L+₹3.6 L (8.54%) | 3 | Rejected-AOC L-3 |
| Sl No | Description | Qty | Unit | Shri Ram Traders L3 | Aseem Grover Govt Contractor L2 | Harkrishan Lal Contractor L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads Disposal/carraige from 0 upto 3 Km | 20,052.89 | cum | 140 ₹28,07,404.6 | 129.64 ₹25,99,656.66 | 125 ₹25,06,611.25 Lowest |
| 2.00 | Dressing of New or remodeling earth work. | 29,737.99 | sq. mtr. | 1.5 ₹44,606.99 | 1.27 ₹37,767.25 Lowest | 1.3 ₹38,659.39 |
| 3.00 | Jungle clearance on running canals and branches, and drains with discharge more than 9 cum/s. (Heavy) | 2.29 | km | 24,000 ₹54,960 | 22,086 ₹50,576.94 | 22,050 ₹50,494.5 Lowest |
| 4.00 | Ordinary earth/ Ordinary clay taken from private land including compensation but excluding royalty | 20,052.89 | cum | 55 ₹11,02,908.95 | 51.12 ₹10,25,103.74 Lowest | 53 ₹10,62,803.17 |
| 5.00 | Rehandling of earth work. | 20,052.89 | Cum | 29 ₹5,81,533.81 | 27.94 ₹5,60,277.75 Lowest | 28.5 ₹5,71,507.37 |
| 6.00 | Any other item | 1 | CSR+SP | 1 ₹1 Lowest | 1 ₹1 Lowest | 1 ₹1 Lowest |
Tender Value
₹43.8 L
EMD Value
₹87,669
Closing Date
8 May 2026, 9:00 amClosed
Drainage-cum-Mining Division Fazilka
Drainage-cum-Mining Division Fazilka
Estimate for strengthening of banks from RD 0 to 7500 of kaurianwali drain
2026_WR_167185_1
27/2025-26
Open Tender
Civil Works
Item Rate
45 days
Drainage-cum-Mining Division Fazilka
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹87,669
10 Jun 2026
28 Apr 2026
8 May 2026
28 Apr 2026
8 May 2026
28 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads Disposal/carraige from 0 upto 3 Km | 20,052.89 | cum | - | - |
| 2 | Dressing of New or remodeling earth work. | 29,737.99 | sq. mtr. | - | - |
| 3 | Jungle clearance on running canals and branches, and drains with discharge more than 9 cum/s. (Heavy) | 2.29 | km | - | - |
| 4 | Ordinary earth/ Ordinary clay taken from private land including compensation but excluding royalty | 20,052.89 | cum | - | - |
| 5 | Rehandling of earth work. | 20,052.89 | Cum | - | - |
| 6 | Any other item | 1 | CSR+SP | 100 | ₹100 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.61 MB
SBD27sign.pdf
Tender Documents • 2.07 MB
BOQ_339526.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .