| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.5 CrAccepted-AOC C O ANISH KUMAR GOYAL PURENAH PARA ROAD WARD NO 5 SAKTI SAKTI CHHATTISGARH 495689 UDYAM CG 32 0004643 | JANJGIR CHAMPA | CHHATTISGARH | 495689 | ₹1.5 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹1.6 Cr+₹16.4 L (11.1%)Rejected-Finance | ₹1.6 Cr+₹16.4 L (11.1%) | 2 | Rejected-Finance L2 |
| 3 | 3₹1.7 Cr+₹17.3 L (11.7%)Rejected-Finance | ₹1.7 Cr+₹17.3 L (11.7%) | 3 | Rejected-Finance L3 |
| 4 | 4₹1.7 Cr+₹21.5 L (14.5%)Rejected-Finance | ₹1.7 Cr+₹21.5 L (14.5%) | 4 | Rejected-Finance L4 |
| 5 | 5₹1.8 Cr+₹35.2 L (23.8%)Rejected-Finance NAN | ₹1.8 Cr+₹35.2 L (23.8%) | 5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | RAJ PAL SINGH CONTRACTOR L3 | M/s Bajrang Construction & Suppliars L5 | M/S MAA SHARDA CONSTRUCTION AND SUPPLIERS L1 | M/S MAHESHWARI CONSTRUCTION COMPANY L2 | M/s SINGH BROTHERS L4 | VIVEK KUMAR SINGH THEKEDAR L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Cutting heavy under growth and bushes upto 7.5 cm dia including removal of roots with collection and removal | 56,158.61 | M2 | 5 ₹2,80,793.05 | 4.86 ₹2,72,930.84 | 4.04 ₹2,26,880.78 | 4 ₹2,24,634.44 Lowest | 4 ₹2,24,634.44 Lowest | 5.39 ₹3,02,694.91 |
| 2.00 | Earth work in Mar,Kabar, Rankar and Kankar Mixed Soil in Digging/Cutting including lead up to 30 m.and Lift up to 1.5 m including dressing, making Profile and Manual Compaction But Excluding mechanical Compaction. | 6,291.52 | M3 | 50 ₹3,14,576 Lowest | 62.99 ₹3,96,302.84 | 52.31 ₹3,29,109.41 | 52 ₹3,27,159.04 | 61 ₹3,83,782.72 | 69.78 ₹4,39,022.27 |
| 3.00 | E/W by Power Trasported earth with a lead beyond 200 m. and upto 1.0 km i/c excavation, loading ,unloading, manual compaction, dressing and all lift compete excluding Royality and excluding cost of earth. | 22,755.45 | M3 | 125 ₹28,44,431.25 | 165 ₹37,54,649.25 | 120 ₹27,30,654 Lowest | 120 ₹27,30,654 Lowest | 141.5 ₹32,19,896.18 | 186.2 ₹42,37,064.79 |
| 4.00 | Dismantling bricks or stone work in lime or cement mortar and including stacking of material as directed by the ingineer -in-charge within a distance of 60 metres. | 54.63 | M3 | 210 ₹11,472.3 Lowest | 360.99 ₹19,720.88 | 299.79 ₹16,377.53 | 301 ₹16,443.63 | 311 ₹16,989.93 | 399.84 ₹21,843.26 |
| 5.00 | Excavation 0f Foundation in Mar, Kabar, Rankar and Kankar mixed soils including lead upto 30 meter and lift upto 1.5 m including filling, watering, ramming, of excavated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removel and disposal of surplus earth as directed by Engineer-in-charge up to a distance of 30 m from the foundation. | 1,083.76 | M3 | 90 ₹97,538.4 | 95.73 ₹1,03,748.34 | 79.35 ₹85,996.36 | 75 ₹81,282 Lowest | 81 ₹87,784.56 | 106.04 ₹1,14,921.91 |
| 6.00 | Laying P.C.C. M-10 (1:3:6) with cement coarse sand of F.M. not less than 2.5 and crused hard stone grit of size 4.75 to 20 mm including lead 30 m lift 1.5 m, mechanical mixing & mechanical vibrator but execluding cost of centring and shuttering required for proper completion of work including cost of all material T&P, labour etc. | 429.18 | M3 | 3,700 ₹15,87,966 | 4,378.98 ₹18,79,370.64 | 3,636.61 ₹15,60,760.28 | 3,500 ₹15,02,130 Lowest | 4,009 ₹17,20,582.62 | 4,850.14 ₹20,81,583.09 |
| 7.00 | Class-150 brick work in 1:4 With cement , coarse sand including cost of all material labour T&P etc. | 547.79 | M3 | 6,300 ₹34,51,077 | 5,827.24 ₹31,92,103.8 | 4,839.35 ₹26,50,947.54 Lowest | 5,680 ₹31,11,447.2 | 5,511 ₹30,18,870.69 | 6,454.23 ₹35,35,562.65 |
| 8.00 | Centering & shuttering for R.C.C. work in slab and bed block including all Material & Labour and T & P etc. | 1,686.44 | M2 | 250 ₹4,21,610 Lowest | 440.45 ₹7,42,792.5 | 365.78 ₹6,16,866.02 | 310 ₹5,22,796.4 | 301 ₹5,07,618.44 | 487.84 ₹8,22,712.89 |
| 9.00 | Laying C.C. M-20 (1:1.5:3) with cement coarse sand of F.M. not less than 2.5 and crused hard stone grit of size 4.75 to 20 mm including lead 30 m lift 1.5 m, mechanical mixing & mechanical vibrator but execluding cost of centring and shuttering required for proper completion of work including cost of all material T&P, labour etc. | 914 | M3 | 5,500 ₹50,27,000 | 5,672.63 ₹51,84,783.82 | 4,500 ₹41,13,000 Lowest | 5,810 ₹53,10,340 | 5,411 ₹49,45,654 | 6,282.99 ₹57,42,652.86 |
| 10.00 | Cutting bending and placing TMT steel bar for reinforcement with cost of TMT bar and binding wire with required for proper completion of work including cost of materials , labours, T&P, etc. | 15.33 | M.T | 66,000 ₹10,11,780 | 65,000 ₹9,96,450 Lowest | 65,000 ₹9,96,450 Lowest | 68,000 ₹10,42,440 | 81,000 ₹12,41,730 | 69,524.14 ₹10,65,805.07 |
Tender Value
₹2.1 Cr
EMD Value
₹4.2 L
Closing Date
24 Jul 2026, 3:00 pmClosed
Superintending Engineer, IVth Circle Irrigation Wo
Office of the Superintending Engineer, IVth Circle Irrigation Works, Jhansi
LOT-02 Restoration work of Puraini Dy. from Km 0.000 to Km 14.680 under the Dhasan Canal System, Saprar Division, Jhansi, in District Hamirpur.
2026_UPIDC_1167957_2
03/SE-IV/2026-27
Open Tender
Civil Works
Item Rate
510 days
RATH
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,450
₹4.2 L
16 Sept 2026
10 Jul 2026
24 Jul 2026
10 Jul 2026
24 Jul 2026
10 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting heavy under growth and bushes upto 7.5 cm dia including removal of roots with collection and removal | 56,158.61 | M2 | 5.5 | ₹3,08,872.36 |
| 2 | Earth work in Mar,Kabar, Rankar and Kankar Mixed Soil in Digging/Cutting including lead up to 30 m.and Lift up to 1.5 m including dressing, making Profile and Manual Compaction But Excluding mechanical Compaction. | 6,291.52 | M3 | 71.2 | ₹4,47,956.22 |
| 3 | E/W by Power Trasported earth with a lead beyond 200 m. and upto 1.0 km i/c excavation, loading ,unloading, manual compaction, dressing and all lift compete excluding Royality and excluding cost of earth. | 22,755.45 | M3 | 190 | ₹43,23,535.5 |
| 4 | Dismantling bricks or stone work in lime or cement mortar and including stacking of material as directed by the ingineer -in-charge within a distance of 60 metres. | 54.63 | M3 | 408 | ₹22,289.04 |
| 5 | Excavation 0f Foundation in Mar, Kabar, Rankar and Kankar mixed soils including lead upto 30 meter and lift upto 1.5 m including filling, watering, ramming, of excavated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removel and disposal of surplus earth as directed by Engineer-in-charge up to a distance of 30 m from the foundation. | 1,083.76 | M3 | 108.2 | ₹1,17,262.83 |
| 6 | Laying P.C.C. M-10 (1:3:6) with cement coarse sand of F.M. not less than 2.5 and crused hard stone grit of size 4.75 to 20 mm including lead 30 m lift 1.5 m, mechanical mixing & mechanical vibrator but execluding cost of centring and shuttering required for proper completion of work including cost of all material T&P, labour etc. | 429.18 | M3 | 4,949.12 | ₹21,24,063.32 |
| 7 | Class-150 brick work in 1:4 With cement , coarse sand including cost of all material labour T&P etc. | 547.79 | M3 | 6,585.95 | ₹36,07,717.55 |
| 8 | Centering & shuttering for R.C.C. work in slab and bed block including all Material & Labour and T & P etc. | 1,686.44 | M2 | 497.8 | ₹8,39,509.83 |
| 9 | Laying C.C. M-20 (1:1.5:3) with cement coarse sand of F.M. not less than 2.5 and crused hard stone grit of size 4.75 to 20 mm including lead 30 m lift 1.5 m, mechanical mixing & mechanical vibrator but execluding cost of centring and shuttering required for proper completion of work including cost of all material T&P, labour etc. | 914 | M3 | 6,411.21 | ₹58,59,845.94 |
| 10 | Cutting bending and placing TMT steel bar for reinforcement with cost of TMT bar and binding wire with required for proper completion of work including cost of materials , labours, T&P, etc. | 15.33 | M.T | 70,943.6 | ₹10,87,565.39 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.83 MB
03SEIVNIT2026-27.pdf
Tender Documents • 2.87 MB
BOQ_2190467.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .