| 1.00CONSTRUCTION OF 60,000 LITRES CAPACITY OVER HEAD TANK - [12.0M STAGING] AT ATHIPATTI VILLAGE AND PANCHAYAT | |||||
| 2.00Earthwork excavation in all classes of Soils and Sub soils except hard rock requiring 1 blasting including initial lead and lift, dressing the excavation upto bed level for Foundation as SS 20 B specification etc., complete | |||||
| 3.00 | Ist Depth (0.00m - 2.00m) | 59.47 | Cum | 263 ₹15,640.61 Lowest | 300 ₹17,841 |
| 4.00 | 2nd Depth (2.00m 4.00m) | 10.21 | Cum | 268 ₹2,736.28 Lowest | 300 ₹3,063 |
| 5.00 | Supplying and filling Foundation with filling sand in layers not more 2 than 15 cm thick including labour charges for Filling, Levelling, watering, well rammed and compacted etc., complete | 2.92 | Cum | 1,796 ₹5,244.32 Lowest | 2,000 ₹5,840 |
| 6.00 | Cement concrete 1:4:8 Mix using 40mm ISS HBG stone aggregates for Levelling course including Cost and conveyance of all materials to site, 3 labour charges for mixing, placing, compacting and Curing concrete etc., complete Base concrete | 4.37 | Cum | 5,426 ₹23,711.62 Lowest | 5,500 ₹24,035 |
| 7.00 | Refilling the Foundation, Basement with Excavated earth other than Sand including labour charges for filling, levelling, sectioning, compacting, ramming and consoildation etc., complete | 48.05 | Cum | 45 ₹2,162.25 Lowest | 50 ₹2,402.5 |
| 8.00Reinforced Cement Concrete 1:1.5:3 Grade mix using 10mm and 20mm ISS HBG stone aggregates including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and Curing concrete etc., complete. (excluding Steel, Centering charges] | |||||
| 9.00 | Below 1.50m 4.50m from GL | 10.54 | Cum | 9,289 ₹97,906.06 Lowest | 10,000 ₹1,05,400 |
| 10.00 | Below 1.50m from GL | 2.65 | Cum | 9,150 ₹24,247.5 Lowest | 10,000 ₹26,500 |
Tender Value
Refer Docs
EMD Value
₹22,850
Closing Date
23 Sept 2026, 4:00 pmClosed
Block development office, VP, Kuruvikulam
Block development office, VP, Kuruvikulam
COLRD/31/2026-A2 /VPF 2026-2027 /CONSTRUCTION OF 60,000 LITRES CAPACITY OVER HEAD TANK - 12.0M STAGING AT ATHIPATTI VILLAGE AND PANCHAYAT
2026_RDTN_702317_1
COLRD/31/2026-A2
Open Tender
Civil Works
Works
Kuruvikulam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹22,850
24 Sept 2026
8 Sept 2026
24 Sept 2026
8 Sept 2026
23 Sept 2026
8 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CONSTRUCTION OF 60,000 LITRES CAPACITY OVER HEAD TANK - [12.0M STAGING] AT ATHIPATTI VILLAGE AND PANCHAYAT | - | - | - | - |
| 2 | Earthwork excavation in all classes of Soils and Sub soils except hard rock requiring 1 blasting including initial lead and lift, dressing the excavation upto bed level for Foundation as SS 20 B specification etc., complete | - | - | - | - |
| 3 | Ist Depth (0.00m - 2.00m) | 59.47 | Cum | 263.78 | ₹15,687 |
| 4 | 2nd Depth (2.00m 4.00m) | 10.21 | Cum | 269.46 | ₹2,751.19 |
| 5 | Supplying and filling Foundation with filling sand in layers not more 2 than 15 cm thick including labour charges for Filling, Levelling, watering, well rammed and compacted etc., complete | 2.92 | Cum | 1,797.43 | ₹5,248.5 |
| 6 | Cement concrete 1:4:8 Mix using 40mm ISS HBG stone aggregates for Levelling course including Cost and conveyance of all materials to site, 3 labour charges for mixing, placing, compacting and Curing concrete etc., complete Base concrete | 4.37 | Cum | 5,427.66 | ₹23,718.87 |
| 7 | Refilling the Foundation, Basement with Excavated earth other than Sand including labour charges for filling, levelling, sectioning, compacting, ramming and consoildation etc., complete | 48.05 | Cum | 45.85 | ₹2,203.09 |
| 8 | Reinforced Cement Concrete 1:1.5:3 Grade mix using 10mm and 20mm ISS HBG stone aggregates including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and Curing concrete etc., complete. (excluding Steel, Centering charges] | - | - | - | - |
| 9 | Below 1.50m 4.50m from GL | 10.54 | Cum | 9,290.1 | ₹97,917.65 |
| 10 | Below 1.50m from GL | 2.65 | Cum | 9,151.33 | ₹24,251.02 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
Tendernotice_2.pdf
PDF • 3.04 MB
BOQ_844267.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .