Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 CrAccepted-AOC | ₹3.3 Cr | L1 | Accepted-AOC Work awarded |
| 2 | L2₹3.6 Cr+₹25.7 L (7.73%)Rejected-AOC C 20A METAL COLONY AMBABARI JAIPUR DIST JAIPUR RAJSTHAN PIN 302023 | JAIPUR | RAJASTHAN | 302023 | ₹3.6 Cr+₹25.7 L (7.73%) | L2 | Rejected-AOC Work awarded to another agency |
| 3 | L3₹3.6 Cr+₹26.0 L (7.81%)Rejected-AOC NEAR SABJI MANDI OPP SHIV DHARAMKANTA PUGAL ROAD BIKANER RAJASTHAN | BIKANER | BIKANER | RAJASTHAN | ₹3.6 Cr+₹26.0 L (7.81%) | L3 | Rejected-AOC Work awarded to another agency |
| 4 | L4₹3.9 Cr+₹57.7 L (17.3%)Rejected-AOC | ₹3.9 Cr+₹57.7 L (17.3%) | L4 | Rejected-AOC Work awarded to another agency |
| 5 | L5₹4.6 Cr+₹1.2 Cr (37.3%)Rejected-AOC | ₹4.6 Cr+₹1.2 Cr (37.3%) | L5 | Rejected-AOC Work awarded to another agency |
Tender Value
₹4.7 Cr
EMD Value
₹9.4 L
Closing Date
16 Mar 2023, 12:00 pmClosed
Addl. Chief Engineer, PWD Zone-II, Jaipur
Jacob Road, Civil Lines, Jaipur
WIDENING, STRENGTHENING AND MAINTENANCE OF ROADS UNDER PMGSY PHASE-III (BATCH-II) T-04 SINGOD KALLA TO BHUTEDA VIA NANGAL KALLA KM 0/00 TO 6/00 PACKAGE NO RJ16P333
2023_CERJ_123296_1
RJ16P333
Open Tender
Civil Works - Roads
Percentage
210 days
Under Jurisdiction of Distt. Dn. Phulera
Please refer Tender documents.
6 documents required · 6 mandatory
₹3,000
₹9.4 L
Yes
Addl. Chief Engineer, PWD Zone-II, Jaipur
25 May 2023
2 Mar 2023
17 Mar 2023
2 Mar 2023
16 Mar 2023
2 Mar 2023
8 Mar 2023
eProcurement System for Pradhan Mantri Gram Sadak Yojana (PMGSY) Created By: Harish Kumar Created Date/Time: 31-Mar-2023 01:50 PM Tender Title: WIDENING, STRENGTHENING AND MAINTENANCE OF ROADS UNDER PMGSY PHASE-III (BATCH-II) T-04 SINGOD KALLA TO BHUTEDA VIA NANGAL KALLA KM 0/00 TO 6/00 PACKAGE NO RJ16P333 Tender ID: 2023_CERJ_123296_1
TENDER INVITING AUTHORITY : ADDITIONAL CHIEF ENGINEER, P.W.D. ZONE-II, JAIPUR
NAME OF WORK : WIDENING, STRENGTHENING AND MAINTENANCE OF ROADS UNDER PMGSY PHASE-III (BATCH-II) T-04 SINGOD KALLA TO BHUTEDA VIA NANGAL KALLA KM 0/00 TO 6/00 PACKAGE NO RJ16P333
SHORT TERM NIT NO : 36/2022-23, SR. NO. 22
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 M/s Ved Prakash Contractor(GSTN-08ABHPP9367K1ZU) 80251422.00 14.79 45750944.00 Four Crore Fifty Seven Lakh Fifty Thousand Nine Hundred and Fourty Four
2.00 M/s Shyam Enterprises(GSTN-08AAOFS0153L1ZV) 80251422.00 -2.71 39094989.00 Three Crore Ninty Lakh Ninty Four Thousand Nine Hundred and Eighty Nine
3.00 M/S RAM NIWAS AND COMPANY(GSTN-08AAFFR2625F1ZD) 80251422.00 -11.05 35922951.00 Three Crore Fifty Nine Lakh Twenty Two Thousand Nine Hundred and Fifty One
4.00 KCC INFRA PVT LTD(GSTN-NA) 80251422.00 -11.12 35896327.00 Three Crore Fifty Eight Lakh Ninty Six Thousand Three Hundred and Twenty Seven
5.00 Balbeer Singh(GSTN-NA) 80251422.00 -17.89 33321424.00 Three Crore Thirty Three Lakh Twenty One Thousand Four Hundred and Twenty Four
Lowest Amount Quoted BY: Balbeer Singh(33321424.00)
BOQ Summary Details Tender Title: WIDENING, STRENGTHENING AND MAINTENANCE OF ROADS UNDER PMGSY PHASE-III (BATCH-II) T-04 SINGOD KALLA TO BHUTEDA VIA NANGAL KALLA KM 0/00 TO 6/00 PACKAGE NO RJ16P333 Tender ID: 2023_CERJ_123296_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 Balbeer Singh 33321424.00 L1
2 KCC INFRA PVT LTD 35896327.00 L2
3 M/S RAM NIWAS AND COMPANY 35922951.00 L3
4 M/s Shyam Enterprises 39094989.00 L4
5 M/s Ved Prakash Contractor 45750944.00 L5
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .