Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Finance | -42.53% | ₹1.6 L | L1 | Admitted-Finance |
| 2 | L2₹1.7 LAdmitted-Finance | -38.00% | ₹1.7 L | L2 | Admitted-Finance |
| 3 | L3₹1.7 LAdmitted-Finance | -37.90% | ₹1.7 L | L3 | Admitted-Finance |
| 4 | L4₹1.8 LAdmitted-Finance | -36.13% | ₹1.8 L | L4 | Admitted-Finance |
| 5 | L5₹2.0 LAdmitted-Finance | -27.26% | ₹2.0 L | L5 | Admitted-Finance |
Tender Value
₹2.8 L
EMD Value
₹5,569
Closing Date
17 Feb 2026, 6:00 pmClosed
OFFICE OF THE EXECUTIVE ENGINEER REW JAMMU
OFFICE OF THE EXECUTIVE ENGINEER REW JAMMU
Construction of culvert over the canal near Govt. Middle School Gharani, Pyt. Gharani, Block Suchetgarh Under CDF for FY 2025-26
2026_RDPR_302719_21
e-NIT No. 812- REWJ of 2025-26 dated 10-02-2026
Open Tender
Civil Works
45 days
OFFICE OF THE EXECUTIVE ENGINEER REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹5,569
21 Feb 2026
10 Feb 2026
18 Feb 2026
10 Feb 2026
17 Feb 2026
10 Feb 2026
Earthwork in Excavation by manual means in trenches for foundations, drains, pipes, cable etc(Not Exceeding 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, depth upto 1.5m including disposal of excavated earth upto 1m from cutting edge, disposed earth is to be levelled and neatly dressed in all kind of soil.
Providing and laying in position Cement Concrete of specified grade excluding the cost of centring and shuttering, all work upto plinth level (1:5:10) 1 cement:5 coarse sand:10 graded stone aggreagate 40mm nominal size (crusher)
Providing and laying in position Cement Concrete of specified grade excluding the cost of centring and shuttering, all work Upto plinth level (1:3:6) 1 cement:3 coarse sand:6 graded stone aggreagate 20mm nominal size (crusher).
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.
Centring and shuttering including strutting, propping etc and removal of form work for ; Foundation , Footing , Bases of Column
Centring and shuttering including strutting, propping etc and removal of form work for ; u/slab
edge of slab
carriage of material SAND and Stone Aggregates from 30 km distance by MT
Providing Display Board with Lettering and writing Complete Job
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_982552.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid