Tender Value
₹7.6 L
EMD Value
₹15,140
Closing Date
13 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE MGCCD 8 BULANDSHAHR
OFFICE EE MGCCD 8 BULANDSHAHR
Construction of VRB at KM 1.220 of Thati minor
2026_UPIDC_1200823_7
03/EE/2026-27
Open Tender
Civil Works
Item Rate
Sambhal
Please refer Tender documents.
2 documents required · 2 mandatory
₹858
₹15,140
17 Nov 2026
7 Nov 2026
14 Nov 2026
7 Nov 2026
13 Nov 2026
7 Nov 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T & P, leads and lift etc complet. | 174.87 | CUM | - | - |
| 2 | Providing and Laying M-10 (C.C.1:3:6) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 17.02 | CUM | - | - |
| 3 | Providing and Laying C.C. M-15(1:2.4) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 3.47 | CUM | - | - |
| 4 | Providing and Laying first class M-150 brick work in (1:4 ) cement mortar including cost of all materials, labour T & P, all lifts and leads etc. complete. | 73.79 | CUM | - | - |
| 5 | Providing and Laying R.C.C. M-20(1:1.5:3) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 8.67 | CUM | - | - |
| 6 | Providing and Laying C.C. M-25(1:1:2) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 1.23 | CUM | - | - |
| 7 | Providing and fixing Cantering & shuttering for CC WORK including cost of all material, labour, T&P, all lifts and leads, etc for proper completion of work . | 25.18 | SQM | - | - |
| 8 | Providing and fixing Cantering & shuttering for RCC WORK including cost of all material, labour, T&P, all lifts and leads, etc for proper completion of work . | 39.61 | SQM | - | - |
| 9 | Supply and fixing of 25mm expansion joint in slab between dirt wall and slab including cost all labour, T&P material etc complete as per direction of Engineer - in charge. | 4.88 | SQM | - | - |
| 10 | Providing and fixing steel reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in proper position, all lifts and leads ,all labour and T&P etc | 1.17 | MT | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.76 MB
BOQ_2287543.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .