Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.9 CrAccepted-AOC | ₹28.9 Cr Quoted ₹30.2 Cr | L1 | Accepted-AOC 1st lowest |
| 2 | L2₹30.8 CrRejected-AOC DOOR NO 2 9 AN TOWERS DR SATHYAMOORTHY HOSPITAL OPP ROAD 2 5 PERUNDURAI ROAD ERODE TAMILNADU 638011 | ERODE | ERODE | TAMILNADU | 638011 | ₹30.8 Cr | L2 | Rejected-AOC 2nd lowest |
Tender Value
₹28 Cr
EMD Value
₹21 L
Closing Date
31 Oct 2023, 3:00 pmClosed
Chief Engineer, TWAD, Madurai
O/o the Chief Engineer, TWAD Board, Ganesh Nagar, Mattuthavani, Madurai 625 007
Providing 5.00 MLD Water Supply to SIPCOT Industrial Complex at Thappukundu in Theni District with River Mullaiperiyar as Source as Deposit Work Period of completion 12 Months, Trial run 6 months and Paid maintenance 24 months
2023_TWAD_374598_1
Water Supply to SIPCOT Industrial Complex at Thapp
Open Tender
Civil Works - Water Works
365 days
Thappukundu
As per bid document
3 documents required · 3 mandatory
₹0
₹21 L
Madurai
28 Feb 2024
30 Sept 2023
1 Nov 2023
30 Sept 2023
31 Oct 2023
17 Oct 2023
30 Sept 2023 - 16 Oct 2023
16 Oct 2023
Amount
Providing 5.00 MLD Water Supply to SIPCOT Industrial Complex at Thappukundu in Theni District with River Mullaiperiyar as Source as Deposit Work (Period of completion 12 Months, Trial run 6 months and Paid maintenance 24 months) (e – submission).
Construction of Intake Well (3.00M DIA & 5.0M DEPTH), Connecting Main and Coffer Dam at Head Works. Using River Sand.
Construction of Collection Well (6.00M Dia) cum Pump House (8.00M Dia) at Head works.
Construction of Retaining wall at Head works Using M Sand
Pumping Main Headworks to WTP and CW Sump to SR
Construction of Pump Room of Size (9m x 5m) and Compound Wall of Size (125m x 100m) Using M sand
Construction of 1.50 LL Recycling Sump and 12.00 LL Clear Water Sump at WTP
Wash water Tank 1.00 LL capacity (12m staging Height) at WTP
Supply ,Delivery, Erection and Commissioning of Vertical Turbine pumpset at Collection Well cum Pump House.
WTP - 5.78 MLD - Aerator, Raw water Channel & Walkway from Aerator to Stilling Chamber, Stilling chamber, Measuring Channel (Baffle Channel), Flashmixer. Clariflocculator, Clarified water channel , Filter house (Filter Bed), Sludge Collection Well.
Water supply and Sanitary Arrangements at Filter house (Filter Bed).
MECHANICAL ARRANGMENTS AND ELECTRICAL ARRANGMENTS AT TREATMENT UNIT 5.78 mld WTP.
Construction of Electrician Quarters and Watchman Quarters at Treatment Plant.
Supply, delivery, erection and commissioning of HSC Pumpsets, Open Well Submersible Pumpset and Non Clog Pumpset.
Pipe connection works at WTP.
Land Scaping, Gardening and Formation of Paver Block Road at WTP
Maintenance of the scheme for a period of 2 years.
Sub Total
GST in 18%
ANNAI INFRA DEVELOPERS LIMITED
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid