Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.4 LAccepted-AOC | ₹11.4 L Quoted ₹10.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹11.5 LRejected-AOC | ₹11.5 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SHREE KALIGAMBAL CONTRACTORS L1 | K.G.P. ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Sweeping and collecting of litter and dry leaves in around quarters area and along road once in a week and transporting the debris to the near by dustbins for disposal as directed by the Engineer at site, including cost of all labour charges, lead, lift, T&P's, safety appliances, etc, complete (Once in a week) | 81,830 | m2 | 0.69 ₹56,462.70 | 0.75 ₹61,372.50 |
| 2.00 | Cleaning, sweeping and moping the staircase, Terrace and portico area once in a week and transporting the debris to the nearby dustbins for disposal as directed by the Engineer at site, including cost of all labour charges, lead, lift, T&P's, safety appliances, etc, complete (Once in a week) | 91,494 | m2 | 0.49 ₹44,832.06 | 0.55 ₹50,321.70 |
| 3.00 | Cleaning of the litters, weeds growth in sunshades of various sizes of the buildings once in three months including hire charges of ladders other T&P etc, complete (Once in three months) | 1,008 | Nos | 13.82 ₹13,930.56 | 16 ₹16,128 |
| 4.00 | Cleaning of chute in the residential buildings daily by removal and disposal of house wastes and debris etc, and transporting the debris to the nearby dustbins for disposal as directed by the Engineer at site, including cost of all labour charges, lead, lift, T&P's, safety appliances, etc, complete (Daily) | 5,110 | Nos | 28 ₹1.4 L | 32 ₹1.6 L |
| 5.00 | Cleaning of sewer lines and chambers in the residential area including removal of blockage and disposing the sludge away from the site as and when required as directed by the Engineer at the including cost of all materials, T&P's safety appliances and consumes all leads, lifts, labour charges, etc, complete (Once in a month) | 1,008 | Nos | 169 ₹1.7 L | 177 ₹1.8 L |
| 6.00 | Cleaning of manhole chambers upto4.5mtr depth in the residential quarter and disposing the sludge away from the site as and when required as directed by the Engineer at site including all lead, lifts charges etc, complete (Once in a month) | 276 | Nos | 864 ₹2.4 L | 880 ₹2.4 L |
| 7.00 | Clearing scrub jungle with and disposing off to a place atleast 1Km away from the site as directed by the Engineer including all labours charges lead, lift T&P etc, complete (Once in a 3 Months) | 15,883 | m2 | 7 ₹1.1 L | 9 ₹1.4 L |
| 8.00Repair and Maintenance of quarters civil and plumping works PCC, RCC, Plumping & floor Tiles when required as directed by the Engineer at site including all lead, lifts charges etc, complete | |||||
| 8.01 | RCC 1:2:4 | 6 | m3 | 9,270 ₹55,620 | 9,400 ₹56,400 |
| 8.02 | PCC 1:4:8 | 6 | m3 | 6,486 ₹38,916 | 6,600 ₹39,600 |
Tender Value
Refer Docs
EMD Value
₹10,100
Closing Date
18 Dec 2025, 2:00 pmClosed
CE/NCTPS-II
Office of CE/CM/NCTPS-II Chennai-120
NCTPS II Civil Maintenance Circle Civil Project Division Maintenance of Q type quarters at Vallur Camp for the period of One year from 01.04.2026 to 31.03.2027 or from the date of commencement
2025_EB_628484_1
CE/NCTPS-II/SE/CM/34/2025-26
Open Tender
Civil Works
NCTPS-II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,100
Yes
7 Mar 2026
3 Dec 2025
19 Dec 2025
3 Dec 2025
18 Dec 2025
3 Dec 2025
Sweeping and collecting of litter and dry leaves in around quarters area and along road once in a week and transporting the debris to the near by dustbins for disposal as directed by the Engineer at site, including cost of all labour charges, lead, lift, T&P's, safety appliances, etc, complete (Once in a week)
Cleaning, sweeping and moping the staircase, Terrace and portico area once in a week and transporting the debris to the nearby dustbins for disposal as directed by the Engineer at site, including cost of all labour charges, lead, lift, T&P's, safety appliances, etc, complete (Once in a week)
Cleaning of the litters, weeds growth in sunshades of various sizes of the buildings once in three months including hire charges of ladders other T&P etc, complete (Once in three months)
Cleaning of chute in the residential buildings daily by removal and disposal of house wastes and debris etc, and transporting the debris to the nearby dustbins for disposal as directed by the Engineer at site, including cost of all labour charges, lead, lift, T&P's, safety appliances, etc, complete (Daily)
Cleaning of sewer lines and chambers in the residential area including removal of blockage and disposing the sludge away from the site as and when required as directed by the Engineer at the including cost of all materials, T&P's safety appliances and consumes all leads, lifts, labour charges, etc, complete (Once in a month)
Cleaning of manhole chambers upto4.5mtr depth in the residential quarter and disposing the sludge away from the site as and when required as directed by the Engineer at site including all lead, lifts charges etc, complete (Once in a month)
Clearing scrub jungle with and disposing off to a place atleast 1Km away from the site as directed by the Engineer including all labours charges lead, lift T&P etc, complete (Once in a 3 Months)
Repair and Maintenance of quarters civil and plumping works PCC, RCC, Plumping & floor Tiles when required as directed by the Engineer at site including all lead, lifts charges etc, complete
Brick work cm 1:5
Plastering cm 1:5
100mm UPVC pipe
32mm UPVC pipe
25mm UPVC pipe
100mm UPVC Coupler
32mm UPVC Coupler
25mm UPVC Coupler
100mm UPVC Elbow
32mm UPVC Elbow
25mm UPVC Elbow
100mm UPVC Tee
32mm UPVC Tee
25mm UPVC Tee
100mm UPVC Bend
32mm UPVC Bend
25mm UPVC Bend
Double Charges Vitrified Tiles 600X600x8mm Sl.NO.15
Antiskid Tiles
Main Door flush type (Single leaf) with Factory made shutters
Mortice Lock M-0368
Brass Chromium plated Screw Down Tap 15/12mm dia (Heavy Type)
Providing two legged scaffolding
Colour washing (Plastering Qty)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
Spec34.pdf
Tender Documents • 0.60 MB
BOQ_751474.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid