Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 LAccepted-Finance | L1 | Accepted-Finance Accept | |
| 2 | L2₹19.1 L+₹3.1 L (19.3%)Accepted-Finance | L2 | Accepted-Finance Accept | |
| 3 | L3₹22.7 L+₹6.7 L (41.8%)Accepted-Finance | L3 | Accepted-Finance Accept | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | SHUBHAM ENTERPRISES L2 | M/S MANNAT ENTERPRISES L3 | ATHRAV POWER SOLUTIONS SYSTEM PVT. LTD L1 |
|---|---|---|---|---|---|---|
| 0.00For execution of line and infrastructure relating to new connection of Jhatpat, Nives mitra Portal, Full Deposit work, Extension/Reduction of load and Shifting work in the area of UEDD-BHELUPUR, Varanasi | ||||||
| 1.01De-Centralised Materials. | ||||||
| 1.02 | LT copper Z Clamp for 25/63/100 KVA | 10 | Nos. | 1,200 ₹12,000 | 840 ₹8,400 | 600 ₹6,000 Lowest |
| 1.03 | LT copper Z Clamp for 250 KVA | 5 | Nos. | 1,500 ₹7,500 | 1,050 ₹5,250 | 800 ₹4,000 Lowest |
| 1.04 | LT copper Z Clamp for 400 KVA | 5 | Nos. | 1,800 ₹9,000 | 1,050 ₹5,250 | 800 ₹4,000 Lowest |
| 1.05 | Alu. Lug. upto 100 KVA T/F | 10 | Nos. | 100 ₹1,000 Lowest | 210 ₹2,100 | 200 ₹2,000 |
| 1.06 | Alu. Lug. For 250 KVA T/F | 10 | Nos. | 100 ₹1,000 Lowest | 210 ₹2,100 | 200 ₹2,000 |
| 1.07 | Alu. Lug. For 400 KVA T/F | 9 | Nos. | 250 ₹2,250 | 210 ₹1,890 Lowest | 300 ₹2,700 |
| 1.08 | LT Cable S/C 1x35 sq mm | 20 | Mtr. | 60 ₹1,200 | 54 ₹1,080 Lowest | 800 ₹16,000 |
| 1.09 | LT Distribution Box (3 phase) | 5 | Nos. | 3,500 ₹17,500 | 1,176 ₹5,880 Lowest | 4,500 ₹22,500 |
Tender Value
Refer Docs
EMD Value
₹27,000
Closing Date
28 May 2026, 1:00 pmClosed
SE
SE, UEDC-I, SIGRA-VARANASI
For execution of line and infrastructure relating to new connection of Jhatpat, Nives mitra Portal, Full Deposit work, Extension/Reduction of load and Shifting work in the area of UEDD-BHELUPUR, Varanasi
2026_PVVNV_1146122_1
04/UEDC-I(V)/2026-27
Open Tender
Electrical Works
Lump-sum
365 days
EE, UEDD-BHELUPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
EE UECD I VARANASI
₹27,000
12 Jun 2026
7 May 2026
28 May 2026
7 May 2026
28 May 2026
7 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0For execution of line and infrastructure relating to new connection of Jhatpat, Nives mitra Portal, Full Deposit work, Extension/Reduction of load and Shifting work in the area of UEDD-BHELUPUR, Varanasi | |||||
| 1.01 | De-Centralised Materials. | - | - | - | - |
| 1.02 | LT copper Z Clamp for 25/63/100 KVA | 10 | Nos. | - | - |
| 1.03 | LT copper Z Clamp for 250 KVA | 5 | Nos. | - | - |
| 1.04 | LT copper Z Clamp for 400 KVA | 5 | Nos. | - | - |
| 1.05 | Alu. Lug. upto 100 KVA T/F | 10 | Nos. | - | - |
| 1.06 | Alu. Lug. For 250 KVA T/F | 10 | Nos. | - | - |
| 1.07 | Alu. Lug. For 400 KVA T/F | 9 | Nos. | - | - |
| 1.08 | LT Cable S/C 1x35 sq mm | 20 | Mtr. | - | - |
| 1.09 | LT Distribution Box (3 phase) | 5 | Nos. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_2143117.xls
BOQ • 0.40 MB
doc.pdf
Tender Documents • 1.23 MB
Form-A.pdf
Tender Documents • 0.87 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .