Loading…
Loading…
Tender Value
₹9.7 L
EMD Value
₹19,400
Closing Date
28 Sept 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
CPH
25 conditions · 1 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tenderer must satisfy himself that he has the capacity (Men, material and resources) to complete the work within the stipulated period mentioned in NIT from the date of issue of Letter Of Acceptance
The contractor must abide by and comply the provision of contract labour (Regulation & Abolition) Act, 1970 and Central Rules, 1971.
Tenderer should note that post tender correspondence regarding submission of credential or additional documents in support of credentials/eligibility criteria (i.e. other than those uploaded with the tender offer on IREPS System ) shall not be accepted manually or entertained by Railway. However , Railway administration reserves the rights to seek clarification on the credentials received along with the tender documents and to verify their genuineness for deciding the tender.
1. The e-tenders will be opened online using the IREPS portal. No representative is required to be present for opening of e-tender and taking notes of rates quoted and ranking as the complete details of rates etc. of all the bidders shall be available to the bidders through the website after the opening of the tender. Note: For more details of General Instruction-Chapter-I for Submission of Bid Security, Cost of Tender Document and opening of e-tender. Tenderers are requested to go through the following documents which are available in upload/View Documents in Home page of IREPS portal for works tenders before submitting the e-tender. 1. General Instruction for ETenders on works contract--Chapter- I 2. Special ConditionGeneral- Chapter-II.
GST is applicable hence rates to be quoted including all types of taxes, levies and charges
1. The work will be completed within the period of completion as mentioned in the NIT from the date of issue the acceptance letter. 2. The quantity mentioned against the above item is approx & for tendering purpose only, where as payment will be made actual work done. 3. If the tenderer is failure to start to the work within 15 days from the date of acceptance of the tender under Clause-19.2 of GCC-2022 contract may be terminated as per provision of clause of GCC 2022. 4. Trade license/ labour license must be submitted before execution of agreement as per extant rule. 5. In case of any discrepancies in rate and unit between annexure and USSOR 2021 schedule, the rate & unit USSOR 2021 and DSR-2021 schedule will prevail.
Tenderers must follow the Instructions to Tenderers and Conditions of Tender as mentioned in the uploaded Tender Document before participating in this Tender.
Upgradation of Environmental park at CLW, Chittaranjan.
EL-CON-537~CLW
EL-CON-537
Open
Works - General
12 Months
Paschim Bardhaman, West Bengal
₹0
₹19,400
7 Sept 2026
7 Sept 2026
14 Sept 2026
2 items across 1 schedule · ₹9,68,590.59 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Supply, installation, testing and commissioning of Monoblock booster pump set with discharge capacity of 13.5 LPS and total head of 68 meter along with control and metering system. The pump shall be equipped with high efficiency, heavy-duty motor with thermal overload protection for reliable operation. The work also includes the supply, installation and integration of control and metering system, comprising a starter panel, motor protection devices, pressure monitoring system, flow meter, GSM motor controller, required length of GI/PVC Pipe and XLPE Aluminium Cable, pressure tank and other required necessary instrument and material to ensure automated operation, real time monitoring and efficient energy management.Make: - Kirlosker/Crompton/KSB | Numbers | 2.00 | 4,10,625 | 8,21,250 |
| 2 | Supply of Outdoor Type LT Distribution Panel 1. General Description(a) Type: Outdoor-type LT Distribution Panel.(b) Bus Bar: Electrolytic copper, 400A, 3-phase and neutral, designed with appropriate clearances and color-coded insulations.2. Breaker Details2.1 Incoming Feeder: Rating: 1no. 250A, MCCB, 4 Pole, 415V, 50kA, 2.2 Outgoing Feeders: (a) 3 No. 63A MCB,4 Pole, 415V, 10kA (b) 1 No. 25A MCCB,4 Pole, 415V,10kA (c) 01 Nos 6A DP MCB (d) Power terminal 18 Nos with multifunction meter3. Panel Construction(a) Dimensions: Approx. 1100 mm (H) x 1800 mm (W) x 600 mm (D).(b) Material: 2 mm thick CRCA steel (IS 513 compliant). Corrosion-resistant and durable.3.1 Surface should be corrosion resistance and Powder-coated for durability, weather resistance, and aesthetic appearance.3.2 Features: (a) Canopy: Extended canopy for protection against rainwater.(b) Mounting: The mentioned Panel should be installed on concrete foundation including all masonry work and supply of necessary materials like cement, sand, bricks, etc.(c) The Panel should have double doors.(d) Steel nuts and bolts shall be provided.4. Make of Switchgear: L&T (now L&K) / Siemens / ABB / Schneider. | Numbers | 1.00 | 1,47,340.59 | 1,47,340.59 |
| Schedule total | ₹9,68,590.59 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCCACS12_compressed1.pdf
ATTACHMENT
GCCACS11_compressed1.pdf
ATTACHMENT
tenderdocumentEL-CON-537final.pdf
ATTACHMENT
CTIndianRailwaysStandardGeneralConditionsofContractApril-
ATTACHMENT
CTIndianRailwaysStandardGeneralConditionsofContractApril-
ATTACHMENT
2022_CE-I_CT_GCC-2022Policy14_07_2022.pdf
ATTACHMENT
ACS7GCC2022.pdf
ATTACHMENT
ACS8GCC2022.pdf
ATTACHMENT
GCCUpdateduptoACS-7RAILWAYSBOARD.pdf
ATTACHMENT
LetterregardingAnnexureV.pdf
ATTACHMENT
ACS10GCC2022.pdf
ATTACHMENT
ACS9GCC2022.pdf
ATTACHMENT
GCCFOR2022.pdf
ATTACHMENT
CTIndianRailwaysStandardGeneralConditionsofContractApril-
ATTACHMENT
2023_12_21IndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_6ACS-61.pdf
ATTACHMENT
2023_04_26RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_4ACS-4.pdf
ATTACHMENT
2022_12_13RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril2022ACSNo_2.pdf
ATTACHMENT
2023_10_20RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_5ACS-53.pdf
ATTACHMENT
2023_04_26RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_3ACS-311.pdf
ATTACHMENT
tenderdocumentEL-CON-537final.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .