| 1 | 1₹10.6 LAccepted-AOC NO 486 VPK NAGAR PATTABIRAM CHENNAI TAMIL NADU 600072 | CHENNAI | CHENNAI | TAMIL NADU | 600072 | ₹10.6 L | 1 | Accepted-AOC L1 |
| 2 | 2₹10.6 LRejected-AOC NO 126 SRI BRINDAVAN 1ST MAIN ROAD KODAMBAKKAM CHENNAI 600024 | CHENNAI | CHENNAI | TAMIL NADU | 600024 | ₹10.6 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M/s.DRR INFRASTRUCTURES L2 | AJR Construction L1 |
|---|---|---|---|---|---|
| 1.00Providing CC Road At Pulli kuthi street @ Morai Panchayat . | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead including cost of conveyance etc,..completed | 31.68 | cu.m | 135 ₹4,277 | 131.5 ₹4,166 Lowest |
| 3.00 | Filling with M sand including cost and conveyance of all materials to site etc., complete | 10.56 | cu.m | 1,880 ₹19,853 | 1,872.2 ₹19,770 Lowest |
| 4.00 | Cement Concrete 1:4:8 ( One Cement Five sand and Ten Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. comple | 68.46 | cu.m | 5,530 ₹3,78,584 | 5,527.5 ₹3,78,413 Lowest |
| 5.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing using mild steel sheets of size 90 x 60 cm for all labour charges etc | 237.6 | sqm | 140 ₹33,264 | 136.5 ₹32,432 Lowest |
| 6.00 | Cement Concrete 1:2:4 (One cement, Two sand, Four Hard Broken stone) using 20 mm guage machine broken hard broken granite stone jelly fincluding cost conveyance and all labour charges etc. complete. | 67.72 | cu.m | 6,620 ₹4,48,306 | 6,618.5 ₹4,48,205 Lowest |
| 7.00 | Supply and Fixing of Bitumen pad For Expansion Joints. | 8.64 | sqm | 240 ₹2,074 | 234 ₹2,022 Lowest |
| 8.00 | Painting inv two sides corewall including cost and conveyance of all materials to site etc., complete | 161.92 | sqm | 85 ₹13,763 | 81 ₹13,116 Lowest |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 1,62,021.78 ₹1,62,021.78 | 1,61,662.32 ₹1,61,662.32 Lowest |
Tender Value
₹10.9 L
EMD Value
₹27,225
Closing Date
27 Jan 2026, 3:00 pmClosed
Block Development Officer BP
Block Development Office VKM Block at Ambathur
Providing CC Road in Pulli Kuthi Street at Morai Panchayat
2026_RDTN_645611_1
SFC- DP 314/2023/A2
Open Tender
Civil Works
Works
90 days
Villivakkam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹27,225
Yes
28 Feb 2026
21 Jan 2026
27 Jan 2026
21 Jan 2026
27 Jan 2026
21 Jan 2026
Providing CC Road At Pulli kuthi street @ Morai Panchayat .
Earth work excavation and depositing on bank with in initial lead including cost of conveyance etc,..completed
Filling with M sand including cost and conveyance of all materials to site etc., complete
Cement Concrete 1:4:8 ( One Cement Five sand and Ten Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. comple
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing using mild steel sheets of size 90 x 60 cm for all labour charges etc
Cement Concrete 1:2:4 (One cement, Two sand, Four Hard Broken stone) using 20 mm guage machine broken hard broken granite stone jelly fincluding cost conveyance and all labour charges etc. complete.
Supply and Fixing of Bitumen pad For Expansion Joints.
Painting inv two sides corewall including cost and conveyance of all materials to site etc., complete
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_773732.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.95 MB
BOQ_773732.xls
BOQ • 0.26 MB
tenderdocument.pdf
Tender Documents • 0.76 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].