| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC AOC GIVEN TO L1 BIDDER |
| 2 | L2₹1.3 Cr+₹1.9 L (1.45%)Rejected-Finance 1ST FLOOR KRISHNA TOWERS OPP TO THRIKKAKARA TEMPLE THRIKKAKARA P O COCHIN 682 021 | ERNAKULAM | KERALA | 682021 | ₹1.3 Cr+₹1.9 L (1.45%) | L2 | Rejected-Finance L1 BIDDER IS ACCEPTED FOR AOC |
| 3 | L3₹1.3 Cr+₹3.9 L (3.07%)Rejected-Finance D S 185 186 SECTOR D LDA COLONY KANPUR ROAD LUCKNOW LUCKNOW UTTAR PRADESH 226012 | LUCKNOW | UTTAR PRADESH | 226012 | ₹1.3 Cr+₹3.9 L (3.07%) | L3 | Rejected-Finance L1 BIDDER IS ACCEPTED FOR AOC |
| 4 | L4₹1.3 Cr+₹5.0 L (3.88%)Rejected-Finance | ₹1.3 Cr+₹5.0 L (3.88%) | L4 | Rejected-Finance L1 BIDDER IS ACCEPTED FOR AOC |
| 5 | L5₹1.4 Cr+₹10.8 L (8.44%)Rejected-Finance | ₹1.4 Cr+₹10.8 L (8.44%) | L5 | Rejected-Finance L1 BIDDER IS ACCEPTED FOR AOC |
Tender Value
₹1.6 Cr
EMD Value
₹3.2 L
Closing Date
18 Jul 2020, 6:00 pmClosed
agm ee 1
integrated building , aai third floor b p i airport
Operation and Comprehensive Maintenance service contract for 3 x 390 TR Air Conditioning Plant of T1 building 3 x 110 TR Air Conditioning Plant of T2 Building and Comprehensive maintenance of Split and Ductable Ac s at B P I Airport Bhubaneswar
2020_AAI_52707_1
AAI/BBSR/AGME (E)-I/eNIT-07/2020-21
Open Tender
Electrical Works
Works
730 days
bhubaneswar
As per nit
4 documents required · 4 mandatory
₹1,180
Yes
Airports Authority of India
₹3.2 L
Yes
4 Sept 2020
11 Jul 2020
22 Jul 2020
11 Jul 2020
18 Jul 2020
11 Jul 2020
11 Jul 2020 - 14 Jul 2020
Amount
Comprehensive Maintenance contract for HVAC System of 3x390TR plants Job I/C 3nos cooling tower, Primary/secondary pumps ,AHUs,Ventilating inline fans, Main HVAC panels with VFDs and all starter panels, BMS & air curtain in NTB(T-1) includes attending to complaints, repairs/rectification action, Supply & Replacement of all type of required Spares/accessories/ parts consumables, Rewinding works, Servicing & Overhauls,descaling if required, Periodic inspections, Schedule/ Preventive/Breakdown Maintenance as per detailed specification of terms and condition & scope of work covered under this contract as per site conditions etc. complete as required.
Operation and daily maintenance of HVAC plant of 3X390TR I/C 3nos cooling tower, Primary/secondary pumps ,AHUs,Ventilating inline fans, Main HVAC panels with VFDs and all starter panels, BMS & air curtain in NTB(T-1) and service block area with maintaining of records /documents on all days in three shifts including Sundays and holidays as required, as per detailed specification of terms and condition and as per direction of EIC as specified.
Operation of 3X110TR Central AC Plant including maintenance of records /documents on all days in two shifts (16 Hrs) including Sundays and Holidays as required as per AAI specification, terms & conditions.
All inclusive Comprehensive maintenance of 3x110 TR Central Air-Conditioning system complete including chillers, compressors, motors, pumps, piping, cooling tower, AHU's & their control panels etc. as per recommendations of OEM/ AAI specifications, terms & conditions.
Annual comprehensive maintenance of 1.5 ton Split type air-conditioning units of all makes installed at various locations including, repair / replacement of defective compressors / motors / PCB/ spares / consumables etc. of complete air-conditioning system as per tender specifications, terms & conditions etc. complete as required for two years.
Annual comprehensive maintenance of 2.0 ton Split type air-conditioning units of all makes installed at various locations including, repair / replacement of defective compressors / motors / PCB/ spares / consumables etc. of complete air-conditioning system as per tender specifications, terms & conditions etc. complete as required for two years.
Annual comprehensive maintenance of 3.0 ton Split type air-conditioning (Cassette/Floormounted/Highwall/MRU) units of all makes installed at various locations including, repair / replacement of defective compressors / motors /PCB/ spares / consumables etc. of complete air-conditioning system as per tender specifications, terms & conditions etc. complete as required for two years.
Annual comprehensive maintenance of 4.0 ton Split type air-conditioning (Cassette/Floormounted/Highwall) units of all makes installed at various locations including, repair / replacement of defective compressors / motors / PCB/ spares / consumables etc. of complete air-conditioning system as per tender specifications, terms & conditions etc. complete as required for two years.
Annual comprehensive maintenance of 5.5 ton Ductable Split air-conditioning units of all makes installed at various locations including, repair / replacement of defective compressors / motors / PCB/ spares / consumables etc. of complete air-conditioning system as per tender specifications, terms & conditions etc. complete as required for two years.
Annual comprehensive maintenance of 40/80 ltr WaterCooler units of all makes installed at various locations including, repair / replacement of defective compressors / motors /PCB/ spares / consumables etc. of complete air-conditioning system as per tender specifications, terms & conditions etc. complete as required for two years.
Annual comprehensive maintenance of 150/150 ltr WaterCooler units of all makes installed at various locations including, repair / replacement of defective compressors / motors / PCB/spares / consumables etc. of complete air-conditioning system as per tender specifications, terms & conditions etc. complete as required for two years.
Supply and fixing of copper refrigerant piping of following size comprising suction and discharge pipes complete with suitable size PVC FR Cu wire & nitrile rubber insulation sleeves, brazing including providing of clamps etc.
Size 1/2" & 1/4" for 1.5 TR Air-conditioning complete as required.
Size 5/8" & 3/8" for 2.0/3.0 TR Air-conditioning complete as required.
Supply and fixing of 25 mm PVC drain pipe connection from indoor to outside of wall including bends,water seal materials & necessary accessories on surface / recess for drain water outlets of AC units etc. complete as required.
Dismentalling of 1.5/2.0 ton split A/Cs of different make and handedover to AAI store/ shift to other location within Airport permises in good condition etc complete as required.
Installation ,testing and commissioning of 1.5/2.0 ton split A/Cs of Different make including gas charging, pressure testing and minor civil works etc complete as required
Sterling And Wilson Pvt. Ltd
ANOOP REFRIGERATION
FREEZECO PVT LTD
V Save Electronics Pvt Ltd
VOLTAS LIMITED
Blue Star Ltd
Supertech Engineers
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .