| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.6 LAccepted-AOC | L-1 | Accepted-AOC As evaluated by committee for L-1 bidder Accepted | |
| 2 | L-2₹8.7 L+₹5.1 L (143.9%)Rejected-AOC | L-2 | Rejected-AOC As evaluated by committee |
| Sl No | Description | Qty | Unit | DHARMENDRA SINGH CHOUHAN L1 | Satyadev Construction And Company L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work/Ash work in excavation/ embankment with approved quality soil/ Ash by means of earth/Ash i/c cleaning of borrow pit/foundation area by uprooting of all type of vegetation, grass, bushes, saplings etc. by any means and stripping of top layer of minimum 20 cm to such depth as decided by the Engineer-in-Charge, depending upon the suitability of ash to be used in forming ash embankment key etc. i/c disposal of all unsuitable materials outside the working zone/ area with all lead and lift complete as per direction of Engineer-in-Charge i/c loading, transportation, unloading of suitable/ selected excavated materials on the bank layers not exceeding 250 mm thick for forming the embankment with all lead, lift, breaking clods/ lumps, watering, compaction etc to achieve dry density not less than 95% standard proctor with approved mechanical means, trimming of slopes to theoretical profile i/c all other incidental charges such as watering. Cost of labor, equipment and materials etc. complete and materials etc. complete as per specification, drawing and direction of Engineer-in-Charge.
(A) ASH EXCAVATION | 2,363 | Cum | 110 ₹2,59,930 Lowest | 240 ₹5,67,120 |
| 2.00 | Earth work/Ash work in excavation/ embankment with approved quality soil/ Ash by means of earth/Ash i/c cleaning of borrow pit/foundation area by uprooting of all type of vegetation, grass, bushes, saplings etc. by any means and stripping of top layer of minimum 20 cm to such depth as decided by the Engineer-in-Charge, depending upon the suitability of ash to be used in forming ash embankment key etc. i/c disposal of all unsuitable materials outside the working zone/ area with all lead and lift complete as per direction of Engineer-in-Charge i/c loading, transportation, unloading of suitable/ selected excavated materials on the bank layers not exceeding 250 mm thick for forming the embankment with all lead, lift, breaking clods/ lumps, watering, compaction etc to achieve dry density not less than 95% standard proctor with approved mechanical means, trimming of slopes to theoretical profile i/c all other incidental charges such as watering. Cost of labor, equipment and materials etc. complete and materials etc. complete as per specification, drawing and direction of Engineer-in-Charge
(B) Earth | 1,223 | Cum | 35 ₹42,805 Lowest | 140 ₹1,71,220 |
Tender Value
₹3.9 L
EMD Value
₹7,800
Closing Date
12 Sept 2024, 3:30 pmClosed
SE PURCHASE AND WORK SSTPP DONGALIA
THIRD FLOOR ADMIN BUILDING SE PURCHASE AND WORK SSTPP DONGALIA
2x600 MW, SSTPP, Stage-I, Khandwa- Construction of earthen embankment for urgent extending ash pipe line inside the bund in lagoon-II at SSTPP, Dongalia.
2024_MPPGC_345381_1
WT-2297
Open Tender
Civil Works - Others
Item Rate
180 days
SE PURCHASE AND WORK SSTPP DONGALIA
As per NIT
12 documents required · 12 mandatory
₹500
Yes
₹7,800
Yes
11 Oct 2025
11 Jul 2024
20 Sept 2024
11 Jul 2024
12 Sept 2024
11 Jul 2024
Amount
Satyadev Construction And Company (BID ID -1094265)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .