| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.7 CrAccepted-AOC RGTPP KHEDAR HISAR HARYANA | HISAR | HARYANA | 125001 | ₹3.7 Cr | 1 | Accepted-AOC Due to lower rate |
| 2 | 2₹3.8 Cr+₹6.7 L (1.81%)Rejected-AOC | ₹3.8 Cr+₹6.7 L (1.81%) | 2 | Rejected-AOC Due to higher rate |
| 3 | 3₹4.1 Cr+₹37.9 L (10.2%)Rejected-AOC | ₹4.1 Cr+₹37.9 L (10.2%) | 3 | Rejected-AOC Due to higher rate |
| 4 | 4₹4.4 Cr+₹64.9 L (17.5%)Rejected-AOC 2974 URBAN ESTATE JIND 126102 | JIND | JIND | HARYANA | 126102 | ₹4.4 Cr+₹64.9 L (17.5%) | 4 | Rejected-AOC Due to higher rate |
| 5 | 5₹4.4 Cr+₹67.8 L (18.2%)Rejected-AOC 10 RUPANA ROAD 127046 | ₹4.4 Cr+₹67.8 L (18.2%) | 5 | Rejected-AOC Due to higher rate |
| Sl No | Description | Qty | Unit | The Siwani Sadhbhawna Co op LC Society Ltd L5 | VINAY KUMAR CONTRACTOR L3 | Umesh Kumar Contractor L2 | NAFE SINGH CONTRACTOR L1 | M/S AAR PEE CONSTRUCTION COMPANY JIND L6 | PARAMJEET CONTRACTOR L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.10 | Designing, providing, fixing, testing and commissioning of GASEOUS CHLORINATION SYSTEM having capacity upto 2000 grams/ hrs. as designed having the control of gas upto 20th part of max. dose . The complete system consists of (a) Vacuum regulator (b) Measuring Glass Tube (c ) Ejector (d) PF tubing (e) Spanner with cylinder opening key (f) Ammonia Gas (Liquid for leaking test) (g) 1’ dia PVC pipe with PVC fitting, ball valves etc. (h) 2 Nos. chlorine gas cylinder capacity 100 Kg. duly certified and approved by BIS and Explosive Department Govt. of India (i) Electronic Chlorine gas leak detector with sensor and hooter (j) Full face mask with canister as per technical specifications issued by Head Office, PHED, Haryana Memo No.-23070-23142 dated 28-02-2024 | 1 | Job | 5,00,000 ₹5,00,000 Lowest | 11,00,000 ₹11,00,000 | 5,00,000 ₹5,00,000 Lowest | 5,50,000 ₹5,50,000 | 6,90,000 ₹6,90,000 | 6,50,000 ₹6,50,000 |
| 1.20 | Raw Water :-Supplying, erection, testing and commissioning of horizontal motor pumping set for clear water having head 12.00 m as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked(1800LPM 12.00 mtr 10.0 BHp) | 2 | Each | 1,50,000 ₹3,00,000 Lowest | 1,90,000 ₹3,80,000 | 1,50,000 ₹3,00,000 Lowest | 1,60,000 ₹3,20,000 | 1,96,000 ₹3,92,000 | 1,97,500 ₹3,95,000 |
| 1.30 | Operation and Maintenance of water works for complete scope of work mentioned in the DNIT and of whole existing water supply scheme in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months during defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate). Complete in all respects as per approved NIT.
1) Operation and maintenance during defect liability period after 3 month trial run period ( operation only) | 1 | Job | 4,00,000 ₹4,00,000 | 3,00,000 ₹3,00,000 | 2,40,000 ₹2,40,000 | 2,20,000 ₹2,20,000 Lowest | 3,00,000 ₹3,00,000 | 4,20,000 ₹4,20,000 |
| 1.40 | 1st year Operation and maintenance after defect liability period | 1 | Job | 3,50,000 ₹3,50,000 | 3,00,000 ₹3,00,000 | 2,65,000 ₹2,65,000 | 2,40,000 ₹2,40,000 Lowest | 4,00,000 ₹4,00,000 | 4,32,000 ₹4,32,000 |
| 1.50 | 2nd year Operation and maintenance | 1 | Job | 4,00,000 ₹4,00,000 | 3,00,000 ₹3,00,000 | 2,95,000 ₹2,95,000 | 2,60,000 ₹2,60,000 Lowest | 4,00,000 ₹4,00,000 | 4,44,000 ₹4,44,000 |
| 1.60 | 3rd year Operation and maintenance | 1 | Job | 4,50,000 ₹4,50,000 | 3,00,000 ₹3,00,000 | 3,25,000 ₹3,25,000 | 2,80,000 ₹2,80,000 Lowest | 4,60,000 ₹4,60,000 | 4,56,000 ₹4,56,000 |
| 1.70 | 4th year Operation and maintenance | 1 | Job | 5,00,000 ₹5,00,000 | 3,00,000 ₹3,00,000 Lowest | 3,55,000 ₹3,55,000 | 3,00,000 ₹3,00,000 Lowest | 5,00,000 ₹5,00,000 | 4,68,000 ₹4,68,000 |
| 1.80 | 5th year Operation and maintenance | 1 | Job | 5,00,000 ₹5,00,000 | 3,00,000 ₹3,00,000 Lowest | 3,90,000 ₹3,90,000 | 3,00,000 ₹3,00,000 Lowest | 5,00,000 ₹5,00,000 | 4,80,000 ₹4,80,000 |
Tender Value
₹4.2 Cr
EMD Value
₹8.4 L
Closing Date
19 Jan 2026, 3:00 pmClosed
EXECUTIVE ENGINEER
Narwana PHED
Construction of Independent Canal Based Water Works and Strengthening of distribution system in village
2026_HRY_495403_1
20263E4DBFE9 EBD4 4777 9A4F A90CC05D010B570PUH
Open Tender
Civil Works
Works
680 days
Pipaltha
4 documents required · 4 mandatory
₹15,000
₹8.4 L
Yes
17 Mar 2026
7 Jan 2026
19 Jan 2026
7 Jan 2026
19 Jan 2026
7 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.1 | Designing, providing, fixing, testing and commissioning of GASEOUS CHLORINATION SYSTEM having capacity upto 2000 grams/ hrs. as designed having the control of gas upto 20th part of max. dose . The complete system consists of (a) Vacuum regulator (b) Measuring Glass Tube (c ) Ejector (d) PF tubing (e) Spanner with cylinder opening key (f) Ammonia Gas (Liquid for leaking test) (g) 1’ dia PVC pipe with PVC fitting, ball valves etc. (h) 2 Nos. chlorine gas cylinder capacity 100 Kg. duly certified and approved by BIS and Explosive Department Govt. of India (i) Electronic Chlorine gas leak detector with sensor and hooter (j) Full face mask with canister as per technical specifications issued by Head Office, PHED, Haryana Memo No.-23070-23142 dated 28-02-2024 | 1 | Job | - | - |
| 1.2 | Raw Water :-Supplying, erection, testing and commissioning of horizontal motor pumping set for clear water having head 12.00 m as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked(1800LPM 12.00 mtr 10.0 BHp) | 2 | Each | - | - |
| 1.3 | Operation and Maintenance of water works for complete scope of work mentioned in the DNIT and of whole existing water supply scheme in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months during defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate). Complete in all respects as per approved NIT.
1) Operation and maintenance during defect liability period after 3 month trial run period ( operation only) | 1 | Job | - | - |
| 1.4 | 1st year Operation and maintenance after defect liability period | 1 | Job | - | - |
| 1.5 | 2nd year Operation and maintenance | 1 | Job | - | - |
| 1.6 | 3rd year Operation and maintenance | 1 | Job | - | - |
| 1.7 | 4th year Operation and maintenance | 1 | Job | - | - |
| 1.8 | 5th year Operation and maintenance | 1 | Job | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_573891.xls
BOQ • 0.25 MB
1F4BOQZ146217.pdf
Additional Documents • 10.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .