Directorate of Municipal Administration
V B HUNSIGIDAD.
Construction of Under Ground Drainage connecting to Main line , Drilling Borewell ,Installing Motor in the Premises of Jayanagr & Ashray Colony in W.NO.27, Construction of UGD Line in at W.No 07 ,New Shanti Nagar via Sadananda colony of W.No 30 Crossing Danamma Temple & Connecting to Main UGD Line. and Shifting of UGD line which passed in the open private lands And Construction of RCC Drain in front of Channamma Circle Road in W.No 13 at CMC Jamkhandi Nagarothana Phase -4 Project
DMA/2025-26/OW/WORK_INDENT45854/CALL-2
DMA/2025-26/OW/WORK_INDENT45854/CALL-2
Open
Other Works
Two Tender Document System(Two Cover)
DMA District Urban Development Cell Bagalkote
5 documents required · 5 mandatory
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)
Executed in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Owning the following key and critical equipment for this work (xxxx, xxxx, xxxx)
Liquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
executed in any one year, the following minimum quantities of work-1) Earth work excavation-2375 cum, 2) SN8 Double Wall Corrugated HDPE pipe 200 to 300 DIA PIPE-1125mtr, 3) GRANULAR SUB BASE-110cum, 4) chambers( 1 m upto 3 .5 m)-42 No, 5) Steel-4 tonne, 6) SUBGRADE-196cum, 7) RCC/ PCC-182.06cum (last five years i.e., 2020-21 to 2024-25)
satisfactorily completed(at least 50% of the contract value), as prime contractor, at least one similar work such as UGD work of value not less than Rs45.00 Lakhs. last five years i.e., 2020-21 to 2024-25)
liquid assets and /or availability of credit facilities of no less than Rs.27.00 Lakhs (Banker certificate/Credit lines/ letter of credit/ certificates from banks for meeting the fund requirement etc
achieved in at least two financial years a minimum financial turnover (in all classes of civil engineering construction works only) of Rs : 90.00 lakhs (last five years i.e., 2020-21 to 2024-25)
₹2,250
₹1.8 L
19 Sept 2025
19 Sept 2025
6 Oct 2025
24 Sept 2025
24 Sept 2025
TSP Works Construction of Under Ground Drainage connecting to Main line , Drilling Borewell & Installing Motor in the Premises of Jayanagr & Ashray Colony in W.NO.27
Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 m3 in volume and stock piling at Dismantling of cement concrete pavement by mec...
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricadi...
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricadi...
Providing and constructing of Machinehole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15m alround the ch...
Providing and installation of Class SN8 Double Wall Corrugated HDPE pipe outer wall corrugated and inner wall smooth piping system in accordance with IS 16098 part 2 and conveying to work site and low...
Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, an...
Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and co...
Construction of un-reinforced plain cement concrete pavement using RMC M-30 grade with OPC @ 270 kg/m3 and GGBS@ 90 kg/m3 (75:25 proportion) as per approved mix design procedure and thickness as per ...
General Works -Construction of UGD line at W.nO.7, W.nM.30, and Shifting of UGD Line which passed in the open private lands
Dismantling of Flexible pavements and disposal of dismantled materials and stacking serviceable and unserviceable materials seperately SR 2023-24, Vol.3, I.No2.18,II A. Page.11
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricadi...
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricadi...
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricadi...
Providing and constructing of Machinehole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15m alround the ch...
Providing and constructing of Machinehole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15m alround the ch...
Providing and constructing of Machinehole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15m alround the ch...
Providing and constructing of Machinehole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15m alround the ch...
Providing and installation of Class SN8 Double Wall Corrugated HDPE pipe outer wall corrugated and inner wall smooth piping system in accordance with IS 16098 part 2 and conveying to work site and low...
Providing and installation of Class SN8 Double Wall Corrugated HDPE pipe outer wall corrugated and inner wall smooth piping system in accordance with IS 16098 part 2 and conveying to work site and low...
Providing and installation of Class SN8 Double Wall Corrugated HDPE pipe outer wall corrugated and inner wall smooth piping system in accordance with IS 16098 part 2 and conveying to work site and low...
Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, an...
Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and co...
Hot Recycling in place of Bituminous pavement with Bituminous Concrete grading i Providing and placing Bituminous Concrete with Hot Recycling in place using crushed aggregate of specified grading, wi...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, cauti...
Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work SR 2023-24 Itm Code 3.1 Vol-3 P No 8 2023-24
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS C...
Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fin...
Form work : As per recommendation of technical working group rates for form work shall be added on percentage basis to the finished concrete items rate for drain form work consideer 5% ((PWD 2021-22)
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to mee...
JKD Nagarothana Phase -4
Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 m3 in volume and stock piling at Dismantling of cement concrete pavement by mec...
Dismantling of Flexible pavements and disposal of dismantled materials and stacking serviceable and unserviceable materials seperately SR 2023-24, Vol.3, I.No2.18,II A. Page.11
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricadi...
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricadi...
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricadi...
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricadi...
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricadi...
Providing and constructing of Machinehole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15m alround the ch...
Providing and installation of Class SN8 Double Wall Corrugated HDPE pipe outer wall corrugated and inner wall smooth piping system in accordance with IS 16098 part 2 and conveying to work site and low...
Providing and constructing of Machinehole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15m alround the ch...
Providing and constructing of Machinehole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15m alround the ch...
Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, an...
Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and co...
Providing and constructing of Machinehole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15m alround the ch...
Construction of un-reinforced plain cement concrete pavement using RMC M-30 grade with OPC @ 270 kg/m3 and GGBS@ 90 kg/m3 (75:25 proportion) as per approved mix design procedure and thickness as per ...
Providing and constructing of Machinehole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15m alround the ch...
Providing and installation of Class SN8 Double Wall Corrugated HDPE pipe outer wall corrugated and inner wall smooth piping system in accordance with IS 16098 part 2 and conveying to work site and low...
Providing and installation of Class SN8 Double Wall Corrugated HDPE pipe outer wall corrugated and inner wall smooth piping system in accordance with IS 16098 part 2 and conveying to work site and low...
Providing and installation of Class SN8 Double Wall Corrugated HDPE pipe outer wall corrugated and inner wall smooth piping system in accordance with IS 16098 part 2 and conveying to work site and low...
Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, an...
Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and co...
Hot Recycling in place of Bituminous pavement with Bituminous Concrete grading i Providing and placing Bituminous Concrete with Hot Recycling in place using crushed aggregate of specified grading, wi...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, cauti...
Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work SR 2023-24 Itm Code 3.1 Vol-3 P No 8 2023-24
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS C...
Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fin...
Form work : As per recommendation of technical working group rates for form work shall be added on percentage basis to the finished concrete items rate for drain form work consideer 5% ((PWD 2021-22)
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to mee...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
kw-3- 45854 call-2 JKD.doc
Tender Document • 1.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .