| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.4 CrAccepted-Finance | ₹27.4 Cr | L1 | Accepted-Finance Set Forth For Evaluation |
| 2 | L2₹27.7 CrAccepted-Finance | ₹27.7 Cr | L2 | Accepted-Finance Set forth for Evaluation |
Tender Value
₹27.7 Cr
EMD Value
₹27.7 L
Closing Date
7 Apr 2025, 12:00 pmClosed
EE, Bomdila Division, PWD, Bomdila
O/o Superintending Engineer, Rupa Circle, PWD, AP,
Construction of Approach road to District Headquarters at Nepangphong, Bichom District (CMCSRDP-II)
2025_PWDAP_2424_1
BDL/TA-27/NSD-14/2024-25/262 Dated 22/03/2025
Open Tender
Civil Works – Roads
Nepangpong
Please refer Tender documents.
7 documents required · 7 mandatory
₹15,000
EE PWD Bomdila
₹27.7 L
Superintending Engineer, Rupa Circle, PWD, AP,
7 Apr 2025
24 Mar 2025
7 Apr 2025
24 Mar 2025
7 Apr 2025
24 Mar 2025
2 Apr 2025
Amount
JUNGLE CLEARANCE
Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto300mm,removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned upto a lead of1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.) (i) By Manual Means A )In area of light jungle
FORMATION CUTTING
Excavation in Hill Area in Soil by Mechanical Means Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres)
Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift (Ordinary and Hard Soil/Hard Shale, Soil containing shingle or small size boulders.Ordinary and Hard Soil
Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres )
Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift (Ordinary and Hard Soil/Hard Shale, Soil containing shingle or small size boulders.(Ordinary and Hard Soil)
A.BOX CULVERT (2mx2m)
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) 'I.Ordinary soil 'A Manual Means 'ii) upto 3 m
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications B ) PCC Grade M20 (p) Height upto 5m
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications RCC Grade M25 (p) Height upto 5m Case I Using concrete Mixer
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M25 Case I Using Concrete Mixer (i) For solid slab super-structure, 20-30% of (a+b+c) (p) Height upto 5m
Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of thes tructure with slope of1V:20 H towards drawing foce. Complete as per drawing and Technical specifications
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.
a) Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications
a) Supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications
M/S T N T ENTERPRISES (BID ID -7204)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_2590.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid