Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.4 CrAccepted-Finance | ₹27.4 Cr | L1 | Accepted-Finance Set Forth For Evaluation |
| 2 | L2₹27.7 Cr+₹23.6 L (0.86%)Accepted-Finance | ₹27.7 Cr+₹23.6 L (0.86%) | L2 | Accepted-Finance Set forth for Evaluation |
Tender Value
₹27.7 Cr
EMD Value
₹27.7 L
Closing Date
7 Apr 2025, 12:00 pmClosed
EE, Bomdila Division, PWD, Bomdila
O/o Superintending Engineer, Rupa Circle, PWD, AP,
Construction of Approach road to District Headquarters at Nepangphong, Bichom District (CMCSRDP-II)
2025_PWDAP_2424_1
BDL/TA-27/NSD-14/2024-25/262 Dated 22/03/2025
Open Tender
Civil Works – Roads
Item Rate
Nepangpong
Please refer Tender documents.
7 documents required · 7 mandatory
₹15,000
EE PWD Bomdila
₹27.7 L
Superintending Engineer, Rupa Circle, PWD, AP,
7 Apr 2025
24 Mar 2025
7 Apr 2025
24 Mar 2025
7 Apr 2025
24 Mar 2025
2 Apr 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1JUNGLE CLEARANCE | |||||
| 1.01 | Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto300mm,removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned upto a lead of1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.)
(i) By Manual Means
A )In area of light jungle | 21 | Hectare | - | - |
| 2FORMATION CUTTING | |||||
| 2.01 | Excavation in Hill Area in Soil by Mechanical Means
Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres) | 7,20,314.6 | Cum | - | - |
| 2.02 | Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift (Ordinary and Hard Soil/Hard Shale, Soil containing shingle or small size boulders.Ordinary and Hard Soil | 3,60,157.3 | Cum | - | - |
| 2.03 | Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres ) | 85,170.4 | Cum | - | - |
| 2.04 | Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift (Ordinary and Hard Soil/Hard Shale, Soil containing shingle or small size boulders.(Ordinary and Hard Soil) | 42,585.2 | Cum | - | - |
| 3A.BOX CULVERT (2mx2m) | |||||
| 3.01 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
'I.Ordinary soil
'A Manual Means
'ii) upto 3 m | 9,560.15 | Cum | - | - |
| 3.02 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) | 377.01 | Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_2590.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_2590.xls
BOQ • 0.30 MB
166659357.pdf
Tender Documents • 0.44 MB
166659358.pdf
Tender Documents • 21.98 MB
166659360.html
Tender Documents • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .