Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.9 LAccepted-AOC | ₹47.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹49.0 LRejected-Finance 6 2 SIVAN NORTH CAR STREET PALAYAMKOTTAI TIRUNELVELI 2 | ₹49.0 L | L2 | Rejected-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | CHELLADURAI N L1 | M/S VIJAY INFRATECH L2 |
|---|---|---|---|---|---|
| 1.001) Strengthening of Keelakallur Road Km 0/0-0/600 in Pappakudi Block (Using Plastic waste) | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 415.8 | sqm | 5.99 ₹2,490.64 | 6.12 ₹2,544.70 |
| 3.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 491.67 | sqm | 22.94 ₹11,278.91 | 23.46 ₹11,534.58 |
| 4.00 | Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 69.3 | cum | 339.15 ₹23,503.10 | 346.8 ₹24,033.24 |
| 5.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 103.95 | cum | 139.65 ₹14,516.62 | 142.8 ₹14,844.06 |
| 6.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 184.37 | cum | 2,466.92 ₹4.5 L | 2,522.56 ₹4.7 L |
| 7.00 | Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion ncluding cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | 1,475 | sqm | 86.78 ₹1.3 L | 88.74 ₹1.3 L |
| 8.00 | Providing and laying Tack coat over WMM surface (Treated with Primer)using 2.50 Kg of bitumen emulsion RS-1 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat by bitumen sprayer | 1,475 | sqm | 20.35 ₹30,016.25 | 20.81 ₹30,694.75 |
| 9.00 | BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 36.87 | cum | 11,473.25 ₹4.2 L | 11,732 ₹4.3 L |
| 10.00 | Provision of 5 nos. Rumble strips covered with premix bituminous carpet, 15-20 mm high at centre,250mm wide placed at 1m c/c at approval locations to control speed, marked with white strips of road marking paint. | 0.94 | sqm | 381.05 ₹358.19 | 389.64 ₹366.26 |
Tender Value
₹50.1 L
EMD Value
₹51,000
Closing Date
27 Feb 2026, 3:00 pmClosed
Project Director
DRDA, Tirunelveli
strengthening of 1 road and Providing Paver Block pavement 1 road in Pappakudi Block
2026_RDTN_663562_9
A4/4302373/2025 MGSMT addl
Open Tender
Civil Works
180 days
Tirunelveli District
As per prequalification details
5 documents required · 5 mandatory
₹0
₹51,000
22 May 2026
21 Feb 2026
27 Feb 2026
21 Feb 2026
27 Feb 2026
23 Feb 2026
1) Strengthening of Keelakallur Road Km 0/0-0/600 in Pappakudi Block (Using Plastic waste)
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion ncluding cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying Tack coat over WMM surface (Treated with Primer)using 2.50 Kg of bitumen emulsion RS-1 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat by bitumen sprayer
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision of 5 nos. Rumble strips covered with premix bituminous carpet, 15-20 mm high at centre,250mm wide placed at 1m c/c at approval locations to control speed, marked with white strips of road marking paint.
Provision for HM stones
Sub Estimate - Paver Block @ Ch.400 - 600m
Earth work Excavation in all classes of soil such an hard stiff clay block cotton soil including all cost and conveyence and all labour charges etc complete.
Cement concrete 1:4:8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supply and erecting centering charges for all concreet works including all cost etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401
Providing and Laying Paver Block of 80mm thick approved design made out of 12mm and 6mm HBGS chips in M30 mix properly cured to attain the required strength, Laying and interlocking block and well compacted using 1-3 ton capacity compressor, the cost inclusive of all materials for manufacturing, interlocking block loading transportation to work site unloading and labour charges for fixing over Sand bed of 30mm thick & Joints filling using compressor of 1-3 ton capacity including hire and fuel charges for compressor and all other incidental charges etc complete.
2) Providing Paver Block Pavement of Melakallur BG Road Km 0/0-0/265
Earth work Excavation in all classes of soil such an hard stiff clay block cotton soil including all cost and conveyence and all labour charges etc complete.
Cement concrete 1:4:8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supply and erecting centering charges for all concreet works including all cost etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401
Providing and Laying Paver Block of 80mm thick approved design made out of 12mm and 6mm HBGS chips in M30 mix properly cured to attain the required strength, Laying and interlocking block and well compacted using 1-3 ton capacity compressor, the cost inclusive of all materials for manufacturing, interlocking block loading transportation to work site unloading and labour charges for fixing over Sand bed of 30mm thick & Joints filling using compressor of 1-3 ton capacity including hire and fuel charges for compressor and all other incidental charges etc complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.65 MB
FinancialBid22.pdf
Additional Documents • 0.86 MB
BOQ_797037.xls
BOQ • 0.29 MB
Technicalbid22.pdf
Tender Documents • 1.13 MB
Download all tender documents and submit your bid