| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.6 LAdmitted-Finance | ₹36.6 L | L1 | Admitted-Finance |
| 2 | L2₹38.5 L+₹1.8 L (5.04%)Admitted-Finance | ₹38.5 L+₹1.8 L (5.04%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | NPK Associates L2 | svasit Engineers L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling and removing the existing damaged Pressed Tiles & Weathering Course over existing R.C.C Roof slabs including all cost etc complete. | 70 | m2 | 54 ₹3,780 Lowest | 54 ₹3,780 Lowest |
| 2.00 | Dismantling the existing damaged RCC slab as per deparmental officer etc., Complete | 2 | m3 | 4,377 ₹8,754 Lowest | 4,377 ₹8,754 Lowest |
| 3.00 | Clean removal of old Damaged Cement plaster from walls and Ceiling as per the instruction of Departmental officers etc., Complete | 100 | m2 | 9 ₹900 Lowest | 9 ₹900 Lowest |
| 4.00 | Dismantling the damaged Cement concrete as per the instruction of Departmental officers etc., Complete | 5 | m2 | 572 ₹2,860 Lowest | 572 ₹2,860 Lowest |
| 5.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton,hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 360 | m3 | 220 ₹79,200 Lowest | 220 ₹79,200 Lowest |
| 6.00 | ORDINARY SOIL (SS20B) Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavated earth (SS20B) | 650 | m3 | 88 ₹57,200 Lowest | 88 ₹57,200 Lowest |
| 7.00 | Cement concrete 1:4:8 (one cement, foursand and eight aggregate) using 40mm hard broken granite stone jelly for foundationincluding dewatering if found necessary andlaid in layers of not more than 15 cm thickand compacted etc.,complete complying witstandard specification. | 23 | m3 | 5,962 ₹1,37,126 Lowest | 5,962 ₹1,37,126 Lowest |
| 8.00 | Supplying and laying of Stone ware pipe including necessary jointing materials link, cement etc. complete for 230 mm dia pipe. | 300 | m | 1,258 ₹3,77,400 | 500 ₹1,50,000 Lowest |
| 9.00 | Supplying fabrications and placing in position RTS rods in various dia including cutting and bending tying of grills placing in position binding wire etc. completed | 25 | qtl | 9,542 ₹2,38,550 Lowest | 9,542 ₹2,38,550 Lowest |
| 10.00 | Centering with steel shutters including studding with sides and support etc., as per the direction of departmental officers etc., complete | 190 | m2 | 356 ₹67,640 Lowest | 356 ₹67,640 Lowest |
Tender Value
₹50 L
EMD Value
₹50,000
Closing Date
22 Jun 2026, 3:00 pmClosed
The commissioner, coimbatore
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Improvement works to the Sastri nagar Burial ground at sathy road in ward no.48, central zone.
2026_MAWS_679597_34
e37/2026-two cover
Open Tender
Civil Works
Works
150 days
Coimbatore corporation
AS PER THE TENDER DOCUMENT
4 documents required · 4 mandatory
₹0
₹50,000
The Chief Engineer Office, Coimbatore Corporation
3 Jul 2026
10 Jun 2026
23 Jun 2026
10 Jun 2026
22 Jun 2026
10 Jun 2026
12 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling and removing the existing damaged Pressed Tiles & Weathering Course over existing R.C.C Roof slabs including all cost etc complete. | 70 | m2 | - | - |
| 2 | Dismantling the existing damaged RCC slab as per deparmental officer etc., Complete | 2 | m3 | - | - |
| 3 | Clean removal of old Damaged Cement plaster from walls and Ceiling as per the instruction of Departmental officers etc., Complete | 100 | m2 | - | - |
| 4 | Dismantling the damaged Cement concrete as per the instruction of Departmental officers etc., Complete | 5 | m2 | - | - |
| 5 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton,hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 360 | m3 | - | - |
| 6 | ORDINARY SOIL (SS20B) Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavated earth (SS20B) | 650 | m3 | - | - |
| 7 | Cement concrete 1:4:8 (one cement, foursand and eight aggregate) using 40mm hard broken granite stone jelly for foundationincluding dewatering if found necessary andlaid in layers of not more than 15 cm thickand compacted etc.,complete complying witstandard specification. | 23 | m3 | - | - |
| 8 | Supplying and laying of Stone ware pipe including necessary jointing materials link, cement etc. complete for 230 mm dia pipe. | 300 | m | - | - |
| 9 | Supplying fabrications and placing in position RTS rods in various dia including cutting and bending tying of grills placing in position binding wire etc. completed | 25 | qtl | - | - |
| 10 | Centering with steel shutters including studding with sides and support etc., as per the direction of departmental officers etc., complete | 190 | m2 | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
ITB.pdf
Additional Documents • 0.19 MB
BOQ_817326.xls
BOQ • 0.29 MB
Building.pdf
Tender Documents • 1.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .