Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Finance 27 MCLEOD STREET CIRCUS AVENUE PARK CIRCUS KOLKATA WEST BENGAL 700017 | KOLKATA | WEST BENGAL | 700017 | -5.60% | ₹1.9 L | L1 | Admitted-Finance |
| 2 | L2₹2.0 L+₹11,122.69 (5.93%)Admitted-Finance | +0.00% | ₹2.0 L+₹11,122.69 (5.93%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 L+₹15,532.04 (8.28%)Admitted-Finance 17 23 K P ROY LANE KOLKATA 700 031 | KOLKATA | KOLKATA | WEST BENGAL | 700031 | +2.22% | ₹2.0 L+₹15,532.04 (8.28%) | L3 | Admitted-Finance |
| 4 | L4₹2.0 L+₹15,750.52 (8.40%)Admitted-Finance 114 1A DR S C BANERJEE ROAD KOLKATA 700010 | KOLKATA | KOLKATA | WEST BENGAL | 700010 | +2.33% | ₹2.0 L+₹15,750.52 (8.40%) | L4 | Admitted-Finance |
Tender Value
₹2.0 L
EMD Value
₹4,000
Closing Date
29 Jun 2026, 10:00 amClosed
EX.ENG(E)/LTG/Z-I/BR-III
OFFICE OF THE LIGHTING EX.ENGR (E) DEPARTMENT/ZONE-I THEKOLKATAMUNICIPALCORPORATION 79, BIDHAN SARANI , KOLKATA WEST BENGAL 700006
ANNUAL COMPREHENSIVE MAINTENANCE WORK FOR AIR CONDITIONING MACHINES INSTALLED AT KANKURGACHI MPL.MKT. UNDER BR-III, KMC.
2026_KMC_1028543_1
LTG/13/BR-III/Z-I/26-27.
Open Tender
Electrical Work/ Equipment
Percentage
365 days
KMC WARD 31
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹4,000
15 Jul 2026
19 Jun 2026
30 Jun 2026
19 Jun 2026
29 Jun 2026
19 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | COMPREHENSIVE ANNUAL MAINTENANCE AND SERVICING
OF1.5 TON SPLIT TYPE AIR CONDITIONING MACHINE. RATE
OBTAINED FROM IRRIGATION & WATERWAYS
DEPARTMENT,2022 GOVT.OF W.B. | - | EACH PER YEAR | 2,967 | - |
| 2 | COMPREHENSIVE ANNUAL MAINTENANCE AND SERVICING OF
2.0 TON SPLIT TYPE AIR CONDITIONING MACHINE. RATE
OBTAINED FROM IRRIGATION & WATERWAYS
DEPARTMENT,2022 GOVT.OF W.B. | - | EACH PER YEAR | 4,347 | - |
| 3 | GAS CHARGING (R410/ECO FRIENDLY GREEN GAS) OF
WINDOW/SPLIT AIR CONDITIONING UNIT OF 1.5 TON
INCLUDING FLUSHING OF COOLING & CONDENSING UNITS
WITH NITROGEN GAS &RECTIFICATION OF
LEAKAGE,REPLACEMENT OF FILTER,FLAIR NUT ETC IF ANY AS
PER THE RATE OBTAINED FROM
IRRIGATION&WATERWAYSDEPARTMENT 2022, GOVT. OF W.B | - | EACH | 1,861 | - |
| 4 | GAS CHARGING (R410/ECO FRIENDLY GREEN GAS) OF
WINDOW/SPLIT AIR CONDITIONING UNIT OF 2 TON INCLUDING
FLUSHING OF COOLING & CONDENSING UNITS WITH
NITROGEN GAS &RECTIFICATION OF LEAKAGE,REPLACEMENT
OF FILTER,FLAIR NUT ETC IF ANY AS PER THE RATE OBTAINED
FROM IRRIGATION&WATERWAYSDEPARTMENT 2022, GOVT.
OF W.B | - | EACH | 2,416 | - |
| 5 | Sub Total | - | - | - | - |
| 6 | GST 18% | - | Nos. | - | - |
| 7 | CESS 1% | - | Nos. | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
form.pdf
Tender Documents • 0.64 MB
BOQ_2526286.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .