Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.8 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹16.8 L+₹0.87 (<0.01%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹18.6 L+₹1.8 L (10.6%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹19.7 L+₹2.9 L (17.5%)Rejected-Finance DOOR NO 32 6 CHENDUR GARDEN ERANIYAN STREET SOLAR KOLLAMPALAYAM ERODE DISTRICT 638 002 | ERODE | TAMIL NADU | 638002 | L4 | Rejected-Finance L4 | |
| 5 | L5₹20.4 L+₹3.7 L (21.8%)Rejected-Finance | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | NARAYAN S L3 | Smart Infratech Developers L6 | MNM CONSTRUCTION L5 | V.N.S.ENTERPRISES L2 | SPT Construction L1 | SMART PROCON PRIVATE LIMITED L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Civil Works | |||||||||
| 1.01 | Clearing the site using Backhoe loader on hire charges around the proposed building and making approach road to the site etc., complete. | 16 | Hrs | 739 ₹11,824 | 825 ₹13,200 | 950 ₹15,200 | 1,550 ₹24,800 | 733.56 ₹11,736.96 Lowest | 1,000 ₹16,000 |
| 2.00 | Dismantling RCC in the foundation and clearing away the rubbish from the foundation for initial lead and lifts etc., complete. | 2.5 | Cum | 4,850 ₹12,125 | 5,344 ₹13,360 | 4,000 ₹10,000 Lowest | 4,700 ₹11,750 | 4,850.7 ₹12,126.75 | 5,205 ₹13,012.5 |
| 3.00 | Dismantling Brick work in cement mortar in foundation and clearing the rubbish from site with initial lead and lifts etc, complete. | 25.5 | Cum | 315 ₹8,032.5 | 416 ₹10,608 | 450 ₹11,475 | 300 ₹7,650 | 257.85 ₹6,575.18 Lowest | 400 ₹10,200 |
| 4.00 | Dismantling and removing the existing M.S. (Mild Steel) grill fixed over the compound wall carefully, including cutting the holdfasts, hinges or welds using gas cutting / grinding wheel or manual tools without causing any structural damage to the existing compound wall and M.S. grill handing over to department. | 180 | Sqm | 45 ₹8,100 Lowest | 107 ₹19,260 | 400 ₹72,000 | 190 ₹34,200 | 140.42 ₹25,275.6 | 100 ₹18,000 |
| 5.00 | Earth work open excavation by manual means in all soils and sub-soils and to full
depth as may be directed except in rock requiring blasting inclusive of shoring shuttering,
bailing out water wherever necessary and depositing the excavated earth with a lead of
10 mts. within the compound in places shown by the departmental officers and clearing
and levelling the site, etc., complete complying with standard specification and as directed
by the departmental officers. | 4.1 | Cum | 115 ₹471.5 | 213 ₹873.3 | 300 ₹1,230 | 147 ₹602.7 | 95 ₹389.5 Lowest | 200 ₹820 |
| 6.00 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken
stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and
curing, etc., complete as per standard specifications and as directed by the departmental
officers.- For Foundation and Basement | 4.1 | Cum | 6,969 ₹28,572.9 | 7,650 ₹31,365 | 6,800 ₹27,880 | 6,700 ₹27,470 | 4,935.8 ₹20,236.78 Lowest | 7,500 ₹30,750 |
| 7.00 | R.R.Masonry in Cement mortar 1:5 for Ground Floor (New stone) including simultaneously pointing above ground level with the same mortar, Cost of Mortar Plasticizer used etc., complete complying with standard specification and as directed by the Departmental Officers.
For Ground Floor | 67 | Cum | 6,400 ₹4,28,800 | 6,645 ₹4,45,215 | 6,100 ₹4,08,700 | 5,800 ₹3,88,600 | 5,237.91 ₹3,50,939.97 Lowest | 6,500 ₹4,35,500 |
| 8.00 | Brick work in using Cement Mortar 1:5 (One cement and Five sand) using best quality Fly ash Brick of size 230x110x75mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing,
etc., complete complying with standard specification and as directed by the departmental
officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.
other type of bond shall be done as directed by the Executive Engineer in charge.
For Superstructure in Ground Floor | 3.5 | Cum | 7,600 ₹26,600 | 8,040 ₹28,140 | 7,000 ₹24,500 | 6,900 ₹24,150 | 6,316.97 ₹22,109.4 Lowest | 8,000 ₹28,000 |
| 9.00 | Pointing with Cement Mortar 1:3 (One cement and three sand) Flush pointing Random Rubble , etc., complete complying as per the standard specifications. | 101 | Sqm | 320 ₹32,320 | 410 ₹41,410 | 380 ₹38,380 | 340 ₹34,340 | 274.02 ₹27,676.02 Lowest | 400 ₹40,400 |
Tender Value
₹19.8 L
EMD Value
₹19,800
Closing Date
20 Nov 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Estate Officer
Estate office,TANUVAS, Madhavaram Milk Colony, Chennai-51
As per BOQ
2026_TNVAS_721752_1
16.1/E.O/DB/Tender/2026-2027, dt 03-11-2026
Open Tender
Civil Works
Lump-sum
Madhavaram Milk Colony
Refer tender Documents
4 documents required · 4 mandatory
₹0
₹19,800
24 Nov 2026
5 Nov 2026
20 Nov 2026
5 Nov 2026
20 Nov 2026
5 Nov 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Works | |||||
| 1.01 | Clearing the site using Backhoe loader on hire charges around the proposed building and making approach road to the site etc., complete. | 16 | Hrs | - | - |
| 2 | Dismantling RCC in the foundation and clearing away the rubbish from the foundation for initial lead and lifts etc., complete. | 2.5 | Cum | - | - |
| 3 | Dismantling Brick work in cement mortar in foundation and clearing the rubbish from site with initial lead and lifts etc, complete. | 25.5 | Cum | - | - |
| 4 | Dismantling and removing the existing M.S. (Mild Steel) grill fixed over the compound wall carefully, including cutting the holdfasts, hinges or welds using gas cutting / grinding wheel or manual tools without causing any structural damage to the existing compound wall and M.S. grill handing over to department. | 180 | Sqm | - | - |
| 5 | Earth work open excavation by manual means in all soils and sub-soils and to full
depth as may be directed except in rock requiring blasting inclusive of shoring shuttering,
bailing out water wherever necessary and depositing the excavated earth with a lead of
10 mts. within the compound in places shown by the departmental officers and clearing
and levelling the site, etc., complete complying with standard specification and as directed
by the departmental officers. | 4.1 | Cum | - | - |
| 6 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken
stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and
curing, etc., complete as per standard specifications and as directed by the departmental
officers.- For Foundation and Basement | 4.1 | Cum | - | - |
| 7 | R.R.Masonry in Cement mortar 1:5 for Ground Floor (New stone) including simultaneously pointing above ground level with the same mortar, Cost of Mortar Plasticizer used etc., complete complying with standard specification and as directed by the Departmental Officers.
For Ground Floor | 67 | Cum | - | - |
| 8 | Brick work in using Cement Mortar 1:5 (One cement and Five sand) using best quality Fly ash Brick of size 230x110x75mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing,
etc., complete complying with standard specification and as directed by the departmental
officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.
other type of bond shall be done as directed by the Executive Engineer in charge.
For Superstructure in Ground Floor | 3.5 | Cum | - | - |
| 9 | Pointing with Cement Mortar 1:3 (One cement and three sand) Flush pointing Random Rubble , etc., complete complying as per the standard specifications. | 101 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_866749.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
TenderDocumentCompWall.pdf
Tender Documents • 1.02 MB
BOQ_866749.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .