Loading…
Loading…
Tender Value
₹1.8 L
EMD Value
₹4,589
Closing Date
18 Jun 2026, 9:30 pm6d left
Karnataka Forest Department
Raising of Plantation (8x12) in Evicted area at Bikkonahalli, Sy No 9 Extent 0.64 Ha, Budigere Sy No16, Extent 0.64 Ha, Kunchenahalli SY No 80 Extent 2.07 Ha and Kunchenahali II Sy No 80 Extent 2.83 Ha Total 6.18 Ha Shankar Range under KFDF Flexi Fund Head
305238
KFD/2026-27/OW/WORK_INDENT39263/CALL-3
Open
Other Works
KFD ACF Territorial Sub Division Office Ayanur
4 documents required · 0 mandatory · 4 optional
Upload all documents as per tender documents
₹500
₹4,589
11 Jun 2026
11 Jun 2026
19 Jun 2026
17 Jun 2026
Shimoga Division, Shimoga
MODEL -2 - ANR FOR ALL ZONES /SANDAL PLANTATION
DATASHEET NO. 13-Raising of plantation under Assisted Natural Regeneration (ANR) for the year 2025-26
No. of Plants - 400 (pits) +40 ( intrenches) =440 - PBs 8" x 12" -440+44 =484 Extent : 1 ha. 1.00
Sl. NO. CSSR Item NO. Particulars Qnty. Rate Per Amount
1 29(d) Refilling of pits, cutting of edge of the pit on the lower side and refilling 75% or 100% of the pit as the case may be with the excavated soil, duly breaking the clods & arranging the remaining soil on the lower slope. 0.60M3 = 0.216 cum x 0.75 x 400 = 64.80 cum 64.80 Cum. 32.89 1 2,131.27
2 39(a) Re-opening of pits, of size 0.30mX0.30 mx0.30 m for replacement of casualities upto 10% casuality Replacement -40 pits in trenches 1.08 Cum. 88.13 1 95.18
2 94(b) Sowing of Caesalpinia bonduc / PJ seeds/ Glyricidia /cassia siamea/ Acacia nilotica or other thorny species on the mounds of cattle proof trench. 72 Rmtr 1,160.83 1000 83.58
3 23 Loading and unloading of Polythene / HDPE Bagged Seedlings: Loading of polythene / HDPE bagged seedlings into vehicle at the nursery site and unloading at the site nearest to the planting site - (d) Seedlings raised in 8" x 12" size bags. 440 Seedl. 2,933.86 1000 1,290.90
4 24 Transportation: Transportation of polythene / HDPE bagged seedlings in vehicle from nursery site to planting site. (d) Seedlings raised in 8”x12” size bags. (iii) Distance from 21 to 30 km. 440 Seedl. 4,157.47 1000 1,829.29
5 25 Conveyance: Conveyance of polythene / HDPE bagged seedlings as head loads from the dumping site to planting location near each trench / pits (distance up to 3 Km.) (d) 8”x12” size bagged seedlings. 440 Seedl. 5,867.72 1000 2,581.80
6 26 Watering polythene / HDPE bagged seedlings at planting site by dipping in water (including carrying of water) only in dry conditions of weather. (c) 8”x12” size bagged seedlings (This should be restricted to in dry conditions only) - Flexi 440 Seedl. 1,246.91 1000 548.64
7 27 Planting of polythene / HDPE bags seedlings after tearing with blade and removing the polythene / HDPE bags in trenches / pits including scooping the soil to required depth and pressing the soil gently around the seedlings after planting. (d) 8”x12” size bagged seedlings and makes of Saucer Bharav 440 Seedl. 5,502.78 1000 2,421.22
RQ Purchase of NPK/DAP (50 gms per plant) 22 kg 35.00 770.00
38 (e) Application of chemical fertilizer around the plants about 15cm. Away in a furrow duly covering with soil (excluding the cost of fertilizer) in two equal split doses. 400 Plants 586.52 1000 469.22
8 29 (e) (i) First weeding around the plants (pits) to a radius of 60 cm. (August -Sept) 400 Plants 1,833.43 1000 733.37
9 29 (i) (iii) Scraping of grass and other weed growth around the plants to a radius of 60 cm (Scraping item is allowed only in grass infested areas.) [Nov-Dec] 400 Plants 4,547.58 1000 1,819.03
10 29 (m) Hoeing & soil working with pickaxe around the plant to a depth of 15cm. & to radius of 60 cm. so as to loosen the soil around the plants [Nov-Dec] 400 Plants 7,334.34 1000 2,933.74
11 wage Protection of plantation as per the standard norms (for 25 ha. as a unit during the year and pro-rata for different extent for the actual period) 274 days 1 ha. 620.66 1 6,802.43
12 82 Fire Protection work in plantations: New Fire Lines: Cutting of all existing weed growth to a width of 3 m. heaping, burning and re-burning in younger plantations. 0.33 km/ha. 3,080.34 1 1,016.51
13 LS / RQ Providing & fixing quality plantation board (48"x27"x18" including painting, writing, trasportation & fixing) 1 no 158.00 1 158.00
14 Sub Estimate Maintenance of seedlings 8”x12” till planting during 2025 rains 440 Seedl. 6.30 1 2,772.00
15 Raising of seedlings 8"X12" for casualty replacement during 2025-26 40 Seedl. 26.20 1 1,048.00
16 LS / RQ Procurement of plant protection and growth promotion materials / compounds, their application, Nursery Development/Pumpset fuel/maintainence / electricty bill of pumpset/Watch and ward/Documentation/ Paper Advertisment/ Vanamahotsava Awarness Programme/ Raising of 4x6 Seedlings/ Boards and other unforseen items and charges. 195.82
Note: Item of Works can be modified by the DCF based on the field requirement with the concurrence of CCFs with in same cost norm.
Assistant Conservator of Forests,
Ayanur Sub Division, Shimoga
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
CALL-3 Spillover work Tender Notification 2026-27.pdf
Tender Document • 0.53 MB
29700.xlsx
Tender Document • 0.03 MB
Annexure-1.pdf
Tender Document • 0.23 MB
Download all tender documents and submit your bid