| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.1 LAccepted-AOC K K M TOWER KANDHIKUPPAM POST BARGUR TALUK KRISHNAGIRI DISTRICT 635 108 | KRISHNAGIRI | TAMIL NADU | 635108 | L1 | Accepted-AOC Accecpet | |
| 2 | L2₹17.2 L+₹4,977.16 (0.29%)Rejected-AOC | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | KKM Construction L1 | Sharveshwaran Constructions L2 |
|---|---|---|---|---|---|
| 1.001.Construction of 30000 Lit OHT 12M Stage at Thandavanpallam MGR Nagar Village H/O Kandhikuppam | |||||
| 2.00 | Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary.Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc.complete complying with standard specification. | 46.24 | Cum | 246.3 ₹11,388.91 Lowest | 247.01 ₹11,421.74 |
| 3.00 | Second Depth of 1M | 8.06 | Cum | 246.3 ₹1,985.18 Lowest | 247.01 ₹1,990.9 |
| 4.00 | Supplying and filling in foundations and basement with filling M- sand in layers not exceeding 15 cm.thick,well watered,rammed and consolidated etc. complete complying with standard specifications. | 2.3 | Cum | 1,445.06 ₹3,323.64 Lowest | 1,449.25 ₹3,333.28 |
| 5.00 | Plain Cement Concrete 1 : 4 :8 ( one part of cement, five parts of sand and ten parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. | 3.46 | Cum | 4,977.63 ₹17,222.6 Lowest | 4,992.07 ₹17,272.56 |
| 6.00RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by TWAD Boa | |||||
| 7.00 | For items 1.5m to 4.5m below GL | 7.59 | Cum | 8,886.45 ₹67,448.16 Lowest | 8,912.25 ₹67,643.98 |
| 8.00 | For items 0 to 1.50m below GL | 1.75 | Cum | 8,756.88 ₹15,324.54 Lowest | 8,782.3 ₹15,369.03 |
| 9.00 | For items 0m to 4.5m above GL | 2.83 | Cum | 8,888.6 ₹25,154.74 Lowest | 8,914.4 ₹25,227.75 |
| 10.00 | For items 4.51m to 7.32m above GL | 2.23 | Cum | 9,148.08 ₹20,400.22 Lowest | 9,174.63 ₹20,459.42 |
Tender Value
₹17.4 L
EMD Value
₹18,000
Closing Date
16 Oct 2024, 3:00 pmClosed
The Block Development Officer
The Block Development Officer
Krishnagiri DT Bargur Block MLACD_2024_25 Construction of 30000lit Capacity OHT 12m Stage at Thandavapallam MGR Nagar Village at Kandhikuppam Panchayat BRG_85
2024_RDTN_493371_1
2635_2024_R7_DT_06_08_2024
Open Tender
Civil Works - Others
Item Rate
180 days
The Block Development Officer
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹18,000
8 Aug 2025
14 Oct 2024
16 Oct 2024
14 Oct 2024
16 Oct 2024
14 Oct 2024
Amount
1.Construction of 30000 Lit OHT 12M Stage at Thandavanpallam MGR Nagar Village H/O Kandhikuppam
Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary.Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc.complete complying with standard specification.
Second Depth of 1M
Supplying and filling in foundations and basement with filling M- sand in layers not exceeding 15 cm.thick,well watered,rammed and consolidated etc. complete complying with standard specifications.
Plain Cement Concrete 1 : 4 :8 ( one part of cement, five parts of sand and ten parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement.
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by TWAD Boa
For items 1.5m to 4.5m below GL
For items 0 to 1.50m below GL
For items 0m to 4.5m above GL
For items 4.51m to 7.32m above GL
For items 7.32m to 10.98m above GL
For items 10.98m to 14.64m above GL
For items above 14.64m & up to 18.30m from GL
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding
PLANE SURFACES Below G.L.
ABOVE G.L. to 3.30m
Curved Surface 0 to 3.30m from floor level
Square column Below G.L.
Square column 3.30m
Painting two coats with approved cement paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete and as directed by TWAD Board officers
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete and as directed by TWAD Board officers.
FabricatFabrication, supply, delivery and fixing of outside MS ladder of 45cm wide made out Fabrication, supply, delivery and fixing of outside MS ladder of 45cm wide made out of 50x50x6mm MS angle for sides and steps in 16mm MS plain rods fixed at 30cm c
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sane! and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete cu
Providing PVC ventilating arrangements mosquito proof nylon net with 110 mm PVC pipes and cowl and as directed by Departmental officers
Providing cut stone slab in CM 1:3 and as directed by Departmental officers
Hand Rail SUB ESTIMATE
Vertical Pipe at 0.45m Spacing 3.142 x 5.34m /0.45m =38nos
Harizondal Pipe Over Vertical Pipes 3.142x5.34m=16.77
Supply and delivery of MS base Plate Hand Rail 0.45x40x6 mm Thick 0.45m Height Weight 1.99kg /m = 3.14x 5.34 m =16.77m Total Weight 16.77 m 1.90kg = 30.86 kg
Supply and Delivery of MS Base Plate 100x100x6mm Thick Over Cover slab Fixing 32mm Gi Pipe
Supply and Fixing Anchoor fastner bolt 12mm dia of 75mm long in the base plate
Labour Charges For Fabrication of MS Flates and GI Pipes 32mm GI Pipes Cutting Charges
32mm GI Pipe Welding Charges
MS Plates Cutting Charges
MS Plates Welding Charges
Painting Of Iron Works 40x6 mm 80+12=92 mm
32mm Dia Gipes And Plates
Manhole Cover
65mm Ø GI pipes for over flow & 1xl
65mm Ø GI pipes for over flow & 1xl
50mm Ø GI pipes for scour pipe 1xl
65mm Ø GI pipe for delivery 1x1 pipe
90mm Ø PVC Threaded coupler
65 mm Ø PVC threaded coupler
65mm Ø GI Tee
65mm Ø GI 90degree Bend
65mm Ø GI coupler
65mm Ø GI union
65mm Ø GI Elbow
65x50mm Ø GI Reducer
75mmx 63mm PVC Reducer
75mm PVC Threaded coupler
75x90 PVC Reducer
75x63 PVC Reducer
65mm Ø GM Gate valve
50mm Ø GM gate valve
50mm Ø GI coupler
Provision For Soak pit
Refilling the foundation with excavated earth including consolidation as directed by the Departmental officers.
Providing Fencing Arrangement
Earthwork excavation and depositing on bank with initial lead and lift in all soil
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Colour washing two coats in all floors using best freshly burnt white shell lime and best quality of approved variety of colouring pigment including cost of lime, colouring pigments, fevicol type gum, brushes, scaffolding charges etc., complete complying with standard specification. Mineral colouring pigments not affected by lime should only be used (stainers and colour solutions should not be used.)
Supply & fixing of Barbed wire including all cost and conveyance etc., all complete
Supply & fixing of CHAIN LINK 2"X2" USING GAUGE Galvanised Iron wire (of all sizes)all cost and conveyance etc., all complete M0408
Provision for erection charges for Precast concrete vertical post including all labour charges etc complete.,
Provision for Grill Gate including all cost and all labour charges
Provision For Chlorinator
Provision For Pumping Line
Earthwork excavation and depositing on bank with initial lead and lift in all soil
Cost and supply of 75 mm PVC Pipe 6KSC
Towards Labour Charges Cost and supply of 75 mm PVC Pipe 6KSC
Refilling the foundation with excavated earth including consolidation as directed by the officers.
75mm PVC Elbow
75mm PVC Tee
75mm PVC End Cap
75mm PVC Ball Valve
Provision For Distribution Line
Earthwork excavation and depositing on bank with initial lead and lift in all soil
Cost and supply of 63 mm PVC Pipe 4KSC
Towards Labour Charges Cost and supply of 63 mm PVC Pipe 4KSC
Refilling the foundation with excavated earth including consolidation as directed by the officers.
63mm PVC Elbow
63mm PVC Tee
63mm PVC End Cap
63mm PVC Ball Valve
Provision For Name Board Charges
Provision For Photo Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Sharveshwaran Constructions (BID ID -1165146)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .