| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.0 LAccepted-Finance C O SUMAN ENTERPRISES SERGATA P O KOTI SUB TEHSIL JUNGA DISTT SHIMLA | SHIMLA | SHIMLA | HIMACHAL PRADESH | ₹37.0 L | L1 | Accepted-Finance Ok |
| 2 | L2₹41.5 L+₹4.5 L (12.2%)Rejected-Finance | ₹41.5 L+₹4.5 L (12.2%) | L2 | Rejected-Finance Reject |
| 3 | L3₹42.7 L+₹5.7 L (15.3%)Rejected-Finance HIMACHAL PRADESH HP | ₹42.7 L+₹5.7 L (15.3%) | L3 | Rejected-Finance Reject |
| 4 | L4₹43.2 L+₹6.2 L (16.7%)Rejected-Finance R O SHAHI NIWAS UPMOHAL KYARI P O AMBEDKAR CHOWK TUTIKANDI SHIMLA 4 | ₹43.2 L+₹6.2 L (16.7%) | L4 | Rejected-Finance Reject |
| 5 | L5₹45.2 L+₹8.1 L (22.0%)Rejected-Finance | ₹45.2 L+₹8.1 L (22.0%) | L5 | Rejected-Finance reject |
Tender Value
₹50.2 L
EMD Value
₹1.0 L
Closing Date
1 Sept 2026, 9:00 amClosed
E.E. Shimla Urban DIVISION, HPPWD, Shimla-3
E.E. Shimla Urban DIVISION, HPPWD, Shimla-3
Additional alteration of HPPSC Office building at Nigam Vihar,Shimla-02.(SH C/o of wating area near Canteen of HPPSC Building, Nigam Vihar, Shimla-02.
2026_PWD_141927_2
SD-III-9074dt.24-08-2026
Open Tender
Civil Works - Buildings
Percentage
30 days
Nigam Vihar Shimla
As per SBD
9 documents required · 9 mandatory
₹2,000
₹1.0 L
7 Sept 2026
24 Aug 2026
1 Sept 2026
24 Aug 2026
1 Sept 2026
24 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres including carriage of materials within all leads and lifts complete as per the direction of the Engineer-in-Charge | 2.07 | Per cubic metre | 805 | ₹1,666.35 |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres Nominal size concrete 1:4:8 or leaner mix (i/c equivalent design mix)complete including carriage of materials within all leads and lifts as per direction of Engineer - in - charge. | 61.22 | Per cubic metre | 720 | ₹44,075.23 |
| 3 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : including carriage of materials within all leads and lifts complete as per the direction of the Engineer-in-Charge | 2 | Each | 127 | ₹254 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, including carriage of materials within all leads and lifts complete as per the direction of the Engineer-in-Charge 50 m | 19.2 | Per cubic metre | 297 | ₹5,702.4 |
| 5 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of:G.S. Sheet including carriage of materials within all leads and lifts complete as per the direction of the Engineer-in-Charge | 102.7 | Per square metre. | 127 | ₹13,042.9 |
| 6 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts,nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres including carriage of materials within all leads and lifts complete as per the direction of the Engineer-in-Charge | 4,108 | Per Kilogramme | 4 | ₹16,432 |
| 7 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works complete including carriage of materials within all leads and lifts. | 14,475.22 | Per Kilogramme | 89 | ₹12,88,294.22 |
| 8 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete including carriage of materials within all leads and lifts complete as per the direction of the Engineer-in-Charge | 4,820.8 | Per Kilogramme | 97 | ₹4,67,618.07 |
| 9 | Providing and laying in position cement concrete ofspecified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2;4 (1 Cement :2coarse sand) : 4graded stone aggregate 20 mm nominal size) | 37.4 | Per cubic metre | 5,508 | ₹2,05,988.18 |
| 10 | providing and fixing 7.5cm thick aerated autoclave cooncrete dry wall of superior quality and make including carriage of materials within all leads and lifts complete as per the direction of the Engineer-in-Charge | 110.48 | Per square metre. | 1,322 | ₹1,46,058.53 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
BOQ_210674.xls
BOQ • 0.42 MB
SBD5016644.pdf
Tender Documents • 5.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .