Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H2₹23.4 LAccepted-AOC | ₹23.4 L | H2 | Accepted-AOC accepeted |
| 2 | H1₹24.1 LRejected-Finance | ₹24.1 L | H1 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | mageswari H1 | JOTHI CONSTRUCTION H2 |
|---|---|---|---|---|---|
| 1.00Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc., complete | |||||
| 1.01 | Narrow Foundations - Upto 2.00m Depth | 142 | M3 | 300 ₹42,600 | 256 ₹36,352 |
| 1.02 | Open Earth Work Excavation | 96 | M3 | 150 ₹14,400 | 110 ₹10,560 |
| 2.00 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 12 | M3 | 1,787 ₹21,444 | 1,787 ₹21,444 |
| 3.00 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying,nsolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete multiplying with standard specification and as directed by the departmental officers. The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers -Mixing by Manual means | 12 | M3 | 5,400 ₹64,800 | 5,356 ₹64,272 |
| 4.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner , vertical stiffener, side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid). | 131 | M2 | 700 ₹91,700 | 686 ₹89,866 |
| 5.00 | Supplying and erecting steel centering including necessary supports For plane surfaces such as rectangular or square RCC columns etc. which require only nominal strutting using mild steel sheets made of 10 gauge thick welded with MS angle size 40mm x 40mm x 5 mm and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick).etc..complete in all floors complying with standard specifcation. Steel Adjustable telescopic props shall be rovided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 133 | M2 | 623 ₹82,859 | 623 ₹82,859 |
| 6.00Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - The Coarse and Fine aggregates to be used should comply with the requirements of IS standards. | |||||
| 6.01 | Upto Basement | 31 | M3 | 8,100 ₹2.5 L | 8,066 ₹2.5 L |
| 6.02 | Ground Floor | 4 | M3 | 8,300 ₹33,200 | 8,207 ₹32,828 |
Updated dates
Tender Value
₹28 L
EMD Value
₹28,000
Closing Date
26 Dec 2025, 3:00 pmClosed
Sattur Municipality
Sattur Municipality
construction of compound wall and providing paverblock arrangement at majera coats OHT at sattur Municipality.
2025_MAWS_631900_1
3489/2025/M1
Open Tender
Civil Works
Sattur Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹28,000
13 Feb 2026
13 Dec 2025
26 Dec 2025
13 Dec 2025
26 Dec 2025
13 Dec 2025
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc., complete
Narrow Foundations - Upto 2.00m Depth
Open Earth Work Excavation
Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification.
Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying,nsolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete multiplying with standard specification and as directed by the departmental officers. The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers -Mixing by Manual means
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner , vertical stiffener, side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid).
Supplying and erecting steel centering including necessary supports For plane surfaces such as rectangular or square RCC columns etc. which require only nominal strutting using mild steel sheets made of 10 gauge thick welded with MS angle size 40mm x 40mm x 5 mm and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick).etc..complete in all floors complying with standard specifcation. Steel Adjustable telescopic props shall be rovided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid).
Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - The Coarse and Fine aggregates to be used should comply with the requirements of IS standards.
Upto Basement
Ground Floor
Supply and fabrication of steel required for all RCC items of works involved in the schedule, cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as as per design given and specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc complete as per standard specification
Brick work in following Cement Mortar using best quality Burnt Clay Brick of size 9” x 4 3/8” x 2 3/4” with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge.
Ground Floor
Plastering with cement mortar 1:5 (one cement & Five sand), 12 mm thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications.
Supply and fixing of M.S Grills with Doors and Windows with one coat of Red oxide with Primer including all costs such as welding, grinding and fabrication charges, cost and conveyance of all materials to site etc,complete as per standard specification.
Painting two coats of newly plastered wall surface with ready mixed interior / exterior emulsion paint of first quality and of approved colour over a priming coat including preparing the surface, clean removal of dirt and including necessary plaster of paris putty wherever required etc., complete complying with standard specification.
Painting the new iron work with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat and including cost of painting materials, brushes, putty, preparation of surfaces and scaffolding charges etc., complete complying with standard specification and as directed by the departmental officer.
Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Supplying and laying of Interlocking Paver Block Stone 63mm thick Over a base layer of crushed stone sandfilling incl. Cost of materials laying and Labour charges etc complete complying with the standard specification and as directed by the departmental officers.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_755850.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.92 MB
BOQ_755850.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid