| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LQualified ANS METRO MALL 2ND FLOOR ANS METRO MALL TUGHLAKABAD TUGHLAKABAD SOUTH DELHI DELHI 110044 | SOUTH EAST DELHI | DELHI | 110044 | L1 | Qualified | |
| 2 | L2₹1.3 L+₹3,150.04 (2.42%)Qualified GROUND FLOOR BALLIA UTTAR PRADESH 277001 | BALLIA | UTTAR PRADESH | 277001 | L2 | Qualified | |
| 3 | L3₹1.9 L+₹60,296.75 (46.4%)Qualified V 101 SECTOR A BHAGWATI VIHAR UTTAM NAGAR UTTAM NAGAR WEST DELHI DELHI 110059 UDYAM DL 10 0005303 | WEST DELHI | DELHI | 110059 | L3 | Qualified | |
| 4 | Disqualified 8A 136 GROUND FLOOR CENTRAL DELHI CENTRAL DELHI DELHI 110005 | CENTRAL DELHI | DELHI | 110005 | - | Disqualified | |
| 5 | Disqualified 12 560 PUNARTHAM SOORANAD PADINJATTE KIZHAKKU SOORANAD NORTH KOLLAM KERALA 690522 | KOLLAM | KERALA | 690522 | - | Disqualified |
Tender Value
₹1.1 L
EMD Value
Exempted
Closing Date
29 Aug 2025, 2:00 pmClosed
Split Air Conditioner Including Green AC
Wall Mount Type (V2) (Q2) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria
Certificate (Requested in ATC)
OEM Authorization Certificate
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6581032 Dated : 19-08-2025 Bid Document 1/17 Bid to RA enabled No ITC available to buyer Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 113776.5 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
8234447
GEM/2025/B/6581032
Two Packet Bid
Split Air Conditioner Including Green AC
60 days
Ramdas Ponde495677CENTRAL STORES
Total value wise evaluation
PRODUCT
4 documents required · 4 mandatory
Exempted
19 Aug 2025
19 Aug 2025
29 Aug 2025
Split Air Conditioner Including Green AC
Wall Mount Type (V2) (Q2) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria
Certificate (Requested in ATC)
OEM Authorization Certificate
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6581032 Dated : 19-08-2025 Bid Document 1/17 Bid to RA enabled No ITC available to buyer Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 113776.5 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8234447.pdf
GEM_BID
green_room_air_conditioner_specifications_-draft-_d_2024-05-01-11-50-44_6dc927f8627fd0e694ecf3e91a001743.pdf
SPECIFICATION
stc_-version_2-_split_air_conditioner_including_gre_2024-06-26-16-57-37_efdc88d6a009d5c093d94097cf97cbc4.pdf
OTHER
requirements_for_oem_status_against_the_category_-__2024-05-01-12-38-10_42eb1899ef2d07820095ebe48910a901.pdf
OTHER
OM_energy_ElecAppl.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .