Loading…
Loading…
Tender Value
₹1.9 Cr
EMD Value
₹3.9 L
Closing Date
27 Jul 2026, 2:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
Above/Below/Par
OA/2
16 conditions · 4 needing a document upload
Financial Eligibility Criteria: Advance Correction Slip No. 1) Ref: 2022/ce- i/ct/gcc-2022/policy dated- 14.07.2022) A. Para 10.2., Part I of GCC shall be read as under: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover under: Financial Eligibility Criteria: Advance Correction Slip No. 1) Ref: 2022/ce-i/ct/gcc-2022/policy dated- 14.07.2022) A. Para 10.2., Part I of GCC shall be read as under: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover under: The tenderers shall submit requisite information as per Annexure-XIV (as per tender document & NIT), along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Similar Nature of work: "Any civil engineering work comprising of any steel bridge work including Foot-Over-Bridge."
16 conditions · 4 needing a document upload
A . Documents to be uploaded only in the website by the Tenderer Following Annexures duly filled and signed are to be uploaded online only prior to Closing of Tender. Original copy of all the documents to be submitted to office within 7 days whenever demanded by the Railway. Annexures are available at Upload/View Document menu in Home Page of IREPS portal for works tender. 1. The details of the works completed by the tenderer during the last Seven years to be filled in Annexure-I. 2. The details of Plants and Machinery with the tenderer to be filled in Annexure- II. 3. Details of Personnel and Organization of the Tenderer to be filled in Annexure-III. 4. Details of Works presently on hand of the Tenderer to be filled in Annexure- IV. 5. The details regarding Association of Railway Officer s with the tenderer to be filled in Annexure- V. 6. List of the Arbitration cases of the Tenderer during last Five years to be filled in Annexure-VI. 7. List of the Court cases of the Tenderer during last Five years to be filled in Annexure- VII. 8. NEFT MANDATE FORM. All Payments to the agency including the refund of the Earnest Money of the unsuccessful bidder preferably will be remitted through NEFT. The Tenderer is required to submit Bank details and A/C No. etc. in Annexure-VIII. 9.Format for Certificate to be uploaded by Tenderer Along with the tender documents Annexure-IX and IX-A (As per GCC-2022 Annexure-V and V-A). 10. GST COMPLAINT INVOICE Annexure-X 11. LETTER OF CREDIT Annexure-XI, 12. Bid Capacity Declaration Annexure-XII.13. Bid Security declaration Annexure-XIII and 14. Annual Contractual Turnover Data Declaration Annexure-XIV (As per GCC-2022 Annexure-VI-B).
B . T h e tender offer complete in a l l respect and with all documents is t o b e submitted online by e-tendering process through the website www.ireps.gov.in before the closing time/date of this tender as mentioned in the NIT (Notice Inviting Tender). Tenderer can revise the bids any number of times till the closing time/date of the tender. No manual offers shall be accepted.
Demand for the Financial Criteria, Association of Railway Officers, List of Arbitration cases, Court cases and Mandate for NEFT are to be uploaded with a scanned copy duly filled in and signed as per annexure no. IV, V, VI, VII, VIII respectively. These Annexures are available in View Document menu at Home page and is downloadable. The details of the uploaded documents should be produced whenever demanded for verification on written request at any point of time of the tender and contract within 7 days.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Repairing- strengthening of foot over bridges in the section of AEN/BWN and AEN/DKAE under jurisdiction of Sr.DEN/2/HWH
129_2026-27
129_2026-27
Open
Works - General
12 Months
Howrah, West Bengal
₹0
₹3.9 L
27 Jul 2026
2 Jul 2026
13 Jul 2026
29 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 1,71,97,350.53 | ||
| — | 36000.00 | — | — | ||
| STEEL WORK // General // Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | — | — | — | 43,31,880 | |
| — | 5.00 | — | — | ||
| REINFORCEMENT CEMENT CONCRETE // CAST IN SITU // Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : // 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | — | — | — | 48,838.28 | |
| — | 5.00 | — | — | ||
| REINFORCEMENT CEMENT CONCRETE // ENCASING ROLLED STEEL SECTION // Encasing rolled steel sections, in beams and columns, with cement concrete 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) including centering and shuttering complete but , excluding cost of reinforcement. | — | — | — | 72,402.3 | |
| — | 450.00 | — | — | ||
| REINFORCEMENT CEMENT CONCRETE // STEEL REINFORCEMENT // Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. // Thermo-Mechanically Treated bars of grade Fe-500D or more. | — | — | — | 43,679.25 | |
| — | 54.00 | — | — | ||
| FLOORING // TILE FLOORING // Chequered precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). // Dark shade pigment using ordinary cement | — | — | — | 54,407.7 | |
| — | 270.00 | — | — | ||
| ROOFING // RAIN WATER SPOUT AND PIPE // Providing and fixing precoated galvanised steel sheet roofing accessories of total coated thickness 0.50 mm (base metal of minimum 0.45 mm thickness with total coating thickness of 0.05 mm) with Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws complete : // Ridges plain (500 - 600mm) | — | — | — | 1,29,361.05 | |
| — | 378.00 | — | — | ||
| — | 36.00 | — | — | ||
| — | 45.00 | — | — | ||
| CARRIAGE OF MATERIALS // By Manual Labour including loading, unloading and stacking for lead less than 0.50 KM // Steel // Cost of carriage including loading, unloading & stacking for first 50 metres | — | — | — | 14,306.22 | |
| tonne-lead | 45.00 | — | — | ||
| CARRIAGE OF MATERIALS // By Manual Labour including loading, unloading and stacking for lead less than 0.50 KM // Steel // Every additional lead of 50m or part thereof beyond1st 50 m upto 9 such additional lead | — | — | — | 2,099.11 | |
| — | 40000.00 | — | — | ||
| DISMANTLING AND DEMOLISHING // General // Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. | — | — | — | 2,03,400 | |
| — | 10000.00 | — | — | ||
| DISMANTLING AND DEMOLISHING // General // Extra for dismantling trusses, rafters, purlins etc. of steel work for every additional height of one metre or part thereof beyond 5 metres. | — | — | — | 7,650 | |
| — | 5.00 | — | — | ||
| DISMANTLING AND DEMOLISHING // General // Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | — | — | — | 15,980.63 | |
| — | 108000.00 | — | — | ||
| STEEL WORK // General // Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. // In stringers, treads, landings etc. of stair cases, including use of chequered plate wherever required, all complete | — | — | — | 1,20,13,920 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
SpecialconditionofstrengtheningofF.O.B..pdf
ATTACHMENT
2ndcorrectionslip.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_5ACS-5.pdf
ATTACHMENT
GCC-2022-ACS7.pdf
ATTACHMENT
Annexure-X2.pdf
ATTACHMENT
NewAnnexure-IX-merged.pdf
ATTACHMENT
Annexure-XII_.pdf
ATTACHMENT
LetterregardingrecommendedlistofBrands_makeofmaterialsdated03.09.2025.pdf
ATTACHMENT
Updatedtenderdocument_151.pdf
ATTACHMENT
GCCACS14.07.2022-compressed.pdf
ATTACHMENT
CheckList_3.pdf
ATTACHMENT
JPOSTCables_1.pdf
ATTACHMENT
ColouredFinal_GCC_April-22_pdf_27.04.22_1.pdf
ATTACHMENT
Annexure-XI_11_2.pdf
ATTACHMENT
Annexure-XIV_1.pdf
ATTACHMENT
Annexure-IIIIII_3.pdf
ATTACHMENT
ACS11GCCWorks2026.pdf
ATTACHMENT
Annexure-IVVVIVIIVIII_2.pdf
ATTACHMENT
Annexure-XIII_1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .