Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.9 CrAccepted-AOC WARD NO 07 D K ROAD LAKHIMPUR ASSAM | ₹26.9 Cr | L1 | Accepted-AOC Work Order Issued |
| 2 | Rejected-Technical HARI HAR ENCLAVE 3RD FLOOR CHRISTIAN BASTI G S ROAD GUWAHATI 781005 KAMRUP M ASSAM | KAMRUP METRO | ASSAM | 781005 | - | - | Rejected-Technical Not-Qualified |
Tender Value
₹25.6 Cr
EMD Value
₹51.3 L
Closing Date
17 May 2023, 2:00 pmClosed
Spl. CE, PWD(Bldg) (H AND E) Assam, Ghy-3
O/O The CE, PWD (Bldg), Assam, Chandmari, Ghy-3
Group-III Transformation of Schools as centre of Excellence under PM-DevINE Scheme (i) Dharapur Higher Secondary School (ii) Jalukbari HS School (iii)Rajdhar Bora HS School at Azara (iv) Arya Vidyapith HS and MP School
2023_PWBNH_30591_2
Tech-II/185/2022/19 Dated Guwahati 19th April 2023
Open Tender
Civil Works - Building
730 days
Guwahati
Please refer Tender documents.
4 documents required · 4 mandatory
₹20,000
₹51.3 L
Yes
O/O The CE, PWD (Bldg), Assam, Chandmari, Ghy-3
9 Nov 2023
25 Apr 2023
19 May 2023
25 Apr 2023
17 May 2023
8 May 2023
6 May 2023
Amount
Construction on EPC Basis RCC framed structure building DHARAPUR HIGHER SECONDARY SCHOOL (G+1), with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Construction on EPC Basis RCC framed structure building JALUKBARI HIGHER SECONDARY SCHOOL (G+1),with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms & IS Codes and guidelines complete in all respect. Note: - Plinth Area shall be measured for the actual constructed.
Construction on EPC Basis RCC framed structure building RAJDHAR BORA HIGHER SECONDARY SCHOOL (G+1), with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms & IS Codes and guidelines complete in all respect. Note: - Plinth Area shall be measured for the actual constructed.
Construction on EPC Basis RCC framed structure building ARYA VIDYAPEETH HIGHER SECONDARY SCHOOL (G+1), with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms & IS Codes and guidelines complete in all respect. Note: - Plinth Area shall be measured for the actual constructed.
Construction of Civil External development works Levelling, Cement concrete pavement with vaccum dewatered concrete, Foothpath and pathway, External water supply, Garden irrigation, External Sewerage, External storm water drainage work, Rain water harvesting, Borewell, Water supply pumps, Septic tank, Horticulture & Landscape and Boundary Wall approval of DHARAPUR HIGHER SECONDARY SCHOOL of the same by the Engineer- in-Charge
Construction of Civil External development works Levelling, Cement concrete pavement with vaccum dewatered concrete, Foothpath and pathway, External water supply, Garden irrigation, External Sewerage, External storm water drainage work, Rain water harvesting, Borewell, Water supply pumps, Septic tank, Horticulture & Landscape and Boundary Wall approval of JALUKBARI HIGHER SECONDARY SCHOOL of the same by the Engineer- in-Charge
Construction of Civil External development works Levelling, Cement concrete pavement with vaccum dewatered concrete, Foothpath and pathway, External water supply, Garden irrigation, External Sewerage, External storm water drainage work, Rain water harvesting, Borewell, Water supply pumps, Septic tank, Horticulture & Landscape and Boundary Wall approval of RAJDHAR BORA HIGHER SECONDARY SCHOOL of the same by the Engineer- in-Charge
Construction of Civil External development works Levelling, Cement concrete pavement with vaccum dewatered concrete, Foothpath and pathway, External water supply, Garden irrigation, External Sewerage, External storm water drainage work, Rain water harvesting, Borewell, Water supply pumps, Septic tank, Horticulture & Landscape and Boundary Wall approval of ARYA VIDYAPEETH HIGHER SECONDARY SCHOOL of the same by the Engineer- in-Charge
Construction on EPC Basis of INFRASTRUCTURE & EXTERNAL DEVELOPMENT – Electrical Works such as Electrical sub statio,DG set , Cables, Cable tray's, Race ways and Earthing system with support services & allied facilities by incorporating stipulated specifications, all services of DHARAPUR HIGHER SECONDARY SCHOOL including handing over complete as per scope of work and directions of Engineer In charge.
Construction on EPC Basis of INFRASTRUCTURE & EXTERNAL DEVELOPMENT – Electrical Works such as Electrical sub statio,DG set , Cables, Cable tray's, Race ways and Earthing system with support services & allied facilities by incorporating stipulated specifications, all services of JALUKBARI HIGHER SECONDARY SCHOOL including handing over complete as per scope of work and directions of Engineer In charge.
Construction on EPC Basis of INFRASTRUCTURE & EXTERNAL DEVELOPMENT – Electrical Works such as Electrical sub statio,DG set , Cables, Cable tray's, Race ways and Earthing system with support services & allied facilities by incorporating stipulated specifications, all services of RAJDHAR BORA HIGHER SECONDARY SCHOOL including handing over complete as per scope of work and directions of Engineer In charge.
Construction on EPC Basis of INFRASTRUCTURE & EXTERNAL DEVELOPMENT – Electrical Works such as Electrical sub statio,DG set , Cables, Cable tray's, Race ways and Earthing system with support services & allied facilities by incorporating stipulated specifications, all services of ARYA VIDYAPEETH HIGHER SECONDARY SCHOOL including handing over complete as per scope of work and directions of Engineer In charge.
Supplying, Installation and commissioning of Furniture work of DHARAPUR HIGHER SECONDARY SCHOOL including handing over complete as per scope of work and directions of Engineer In charge
Supplying, Installation and commissioning of Furniture work of JALUKBARI HIGHER SECONDARY SCHOOL including handing over complete as per scope of work and directions of Engineer In charge
Supplying, Installation and commissioning of Furniture work of RAJDHAR BORA HIGHER SECONDARY SCHOOL including handing over complete as per scope of work and directions of Engineer In charge
Supplying, Installation and commissioning of Furniture work of ARYA VIDYAPEETH HIGHER SECONDARY SCHOOL including handing over complete as per scope of work and directions of Engineer In charge
Dharapur Higher Secondary School at Guwahati, Assam Low Side Sanitary Fixtures, Fittings, Electrical Fixtures, Fittings, DB’s, Panel etc and any other Capital Equipments and accessories which requires maintenance ESS, DG SETS, TRANSFORMER and as per CPWD Maintenance Manual 2019: Comprehensive maintenance ESS, DG SETS, Transformer units after three year warranty charges/maintenance. The rates shall be inclusive of all spare, accessories, consumbles, manpower, tools and tackles, replacement of parts,(except fuel , power and water) including routine servicing and maintenance of equipment etc complete in all respect as per direction of Engineer in charge. Maintenance (Limited to New Infrastructre Created) For 1st year (Concurrently with DLP of 12 Months)
For 2nd year (After One Year of DLP)
For 3rd year (After Two Year of DLP)
For 4th year (After Three Year of DLP)
Jalukbari HS School at Guwahati, Assam Low Side Sanitary Fixtures, Fittings, Electrical Fixtures, Fittings, DB’s, Panel etc and any other Capital Equipments and accessories which requires maintenance ESS, DG SETS, TRANSFORMER and as per CPWD Maintenance Manual 2019: Comprehensive maintenance ESS, DG SETS, Transformer units after three year warranty charges/maintenance. The rates shall be inclusive of all spare, accessories, consumbles, manpower, tools and tackles, replacement of parts,(except fuel , power and water) including routine servicing and maintenance of equipment etc complete in all respect as per direction of Engineer in charge. Maintenance (Limited to New Infrastructre Created) For 1st year (Concurrently with DLP of 12 Months)
For 2nd year (After One Year of DLP)
For 3rd year (After Two Year of DLP)
For 4th year (After Three Year of DLP)
Rajdhar Bora HS School at Azara at Guwahati, Assam Low Side Sanitary Fixtures, Fittings, Electrical Fixtures, Fittings, DB’s, Panel etc and any other Capital Equipments and accessories which requires maintenance ESS, DG SETS, TRANSFORMER and as per CPWD Maintenance Manual 2019: Comprehensive maintenance ESS, DG SETS, Transformer units after three year warranty charges/maintenance. The rates shall be inclusive of all spare, accessories, consumbles, manpower, tools and tackles, replacement of parts,(except fuel , power and water) including routine servicing and maintenance of equipment etc complete in all respect as per direction of Engineer in charge. Maintenance (Limited to New Infrastructre Created) For 1st year (Concurrently with DLP of 12 Months)
For 2nd year (After One Year of DLP)
For 3rd year (After Two Year of DLP)
For 4th year (After Three Year of DLP)
Arya Vidyapith HS & MP School at Guwahati, Assam Low Side Sanitary Fixtures, Fittings, Electrical Fixtures, Fittings, DB’s, Panel etc and any other Capital Equipments and accessories which requires maintenance ESS, DG SETS, TRANSFORMER and as per CPWD Maintenance Manual 2019: Comprehensive maintenance ESS, DG SETS, Transformer units after three year warranty charges/maintenance. The rates shall be inclusive of all spare, accessories, consumbles, manpower, tools and tackles, replacement of parts,(except fuel , power and water) including routine servicing and maintenance of equipment etc complete in all respect as per direction of Engineer in charge. Maintenance (Limited to New Infrastructre Created) For 1st year (Concurrently with DLP of 12 Months)
For 2nd year (After One Year of DLP)
For 3rd year (After Two Year of DLP)
For 4th year (After Three Year of DLP)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid