Loading…
Loading…
Tender Value
₹13.2 L
EMD Value
₹26,300
Closing Date
29 Sept 2026, 12:00 pm7d left
EE
VIKAS BHAWAN VARANASI
Shivpurva me shri Ramashankar chauhan ke awas se shri bhailal bind ke awas hote hue shri dashami lal bind ke awas tak 12 inch ki jal nikasi evm interlocking nirman karya.
2026_REDUP_1186645_2
2191 date 14-09-2026
Open Tender
Civil Works
Percentage
90 days
EE RED VARANASI
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹26,300
Yes
21 Sept 2026
21 Sept 2026
29 Sept 2026
21 Sept 2026
29 Sept 2026
21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Cut Stone as per S.O.R. 2020 Chapt18 D, S l. No. 4(b) Page 49 | 582.41 | Cum. | 33.25 | ₹19,365.13 |
| 2 | Earth Work in cutting or in embankment in ordinary soil excavation to be the form of regular pits not exceeding 1/2 meter (20") distance as directed by the E/I. as per si.no. 253 | 181.61 | Cum. | 109.25 | ₹19,840.89 |
| 3 | Disposal of extra exvated(westage) earth up to 8.00 km.of distance from site i/c all. | 181.61 | Cum. | 185.35 | ₹33,660.51 |
| 4 | Excavation in foundation in ordinary soil (Loam clay or sand) including lift up to 1.5 m. and lead up to 30 m.and including etc.complete. same as per SI.No.251. | 88.38 | Cum. | 123.5 | ₹10,914.93 |
| 5 | Concrete with 4 cm.gauge Brick ballast,F.sand and cement in proportion of 12:6:1 in foundation and under floors including supply of all material laborT& P etc.required for proper completion for the work.as per S.I no. 273 | 7.61 | Cum. | 3,857 | ₹29,351.77 |
| 6 | Providing and laying 300 mm.Dia NP3 R.C.C. Hume Pipe including collar/ spigot jointed with stiff mixture of cement in proportion of 1:2 cement and fine sand including testing of joint. | 115 | Rm. | 1,206.5 | ₹1,38,747.5 |
| 7 | M-150 Brick Work in 1:4 Cement and sand of 1.25 F.M.morter in Foundation and plinth including S/O all material labour T&P.etc.required for proper completion of work. as per S.I.No.305. | 13.3 | Cum. | 5,177.5 | ₹68,860.75 |
| 8 | 12 mm.thick plaster with cement morter in proportion of 1:4 cement and sand of 1.25 F.M.over brick work minimum thickness not to be less than 10 m.m.including s/o all materials labour and T&P.required for proper completion of the work.as per SI.No.584 | 47.75 | Cum. | 156.75 | ₹7,484.81 |
| 9 | Relaying of dismantled stone chauka i/c all as per S.I.No.762 b (Labour only) | 582.41 | Cum. | 66.5 | ₹38,730.27 |
| 10 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheeled roller complete as per T.S. clause 401. | 40.99 | Cum. | 2,058.08 | ₹84,360.7 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
sbd.pdf
Tender Documents • 1.22 MB
BOQ_2233601.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .