Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹89,000
Closing Date
16 Apr 2025, 9:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Public Works Department
Rajesh T
Estimate for Annual Maintenance of Centralized Air-conditioning System, DG Sets, HT Substation along with Manpower at Karnataka Judicial Academy, Crescent Road, Bangalore.
PWD/2024-25/EL/WORK_INDENT19174
PWD/2024-25/EL/WORK_INDENT19174
Open
Electrical
Two Tender Document System(Two Cover)
PWD Electrical Division Office Bengaluru
9 documents required · 9 mandatory
3.2To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e. from 2020-21 to 2024-25 c) Executed in any one year, during last five years the following minimum quantities of work. 1) Maintenance of Cartelized Air Conditioner System- 10 Nos, 2) 150 TR AC Chiller -2 Nos, 3) Providing Electrician/Helper for Day to Day Routine Operations - 1577 Man Days, 4) 500KVA /750KVA DG Service-2 Nos
3.2To qualify for award of this contract, each tenderer in its name should have in the last Five years i.e. 2020-21 to 2024-25 b) Satisfactorily completed (at least 50% of the contract value), as prime contractor, at least one similar work i.e., Providing similar nature of Work of value not less than Rs.22.04 Lakhs in a single electrical work.
The tenderer as a Prime Contractor having valid Class-2 & above Electrical License issued by Electrical Inspectorate Govt of Karnataka and should have suitable technical, financial & managerial capabilities.
The bidder should have a valid license of PF and ESI registration.
The Tenderer Must have submitted the Certification of registration in the Labour department with the latest renewal.
The Tenderer must submit ongoing and existing commitments details separately.
3.6Tenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under/ Assessed available tender capacity - (AxNx2.5 - B ) Where, A-Maximum value of construction works executed in any one year during the last five years (updated 2024-25 price level) taking into account the completed as well as works in progress. N Number of years prescribed for completion of the works for which tenders are invited. (12 Months) B - Value, at 2024-25 price level, of existing commitments and on-going works to be completed during the next. (12 Months) (period of completion of the works for which Tenders are invited) Note: The statements showing the value of existing commitments and on-going works as well as the stipulated period of completion remaining for each of the works listed should be countersigned by the Employer in charge, not below the rank of an Executive Engineer or equivalent
3.3Each Tenderer should further demonstrate: (b) liquid assets and /or availability of credit facilities of not less than Rs.13.23 Lakhs (For Particular work only) (Credit lines/ letter of credit/ certificates from banks for meeting the fund requirement etc. (usually the equivalent of the estimated cash flow for three months in the peak construction period).
3.2To qualify for award of this contract each Tenderer in its name should have during last five years ie from 2020-21 to 2024-25 a) The tenders must have achieved in at least two financial years an average annual financial turnover of an amount Not less than Rs.44.07 Lakhs during last five years. with UDIN Number certified by Chartered Accountant. Note: The returns submitted to the I.T. along with the Profit and Loss account statement, Balance sheet should be uploaded for the financial turnover criteria
Nil
Nil
Nil
₹1,110
₹89,000
1 Apr 2025
1 Apr 2025
17 Apr 2025
7 Apr 2025
Estimate for Annual Maintenance of Centralized Air-conditioning System, DG Sets, HT Substation along with Manpower at Karnataka Judicial Academy, Crescent Road, Bangalore.
Routine Maintenance of Water cooled screw chillers complete with Screw type Compressors with Shell and tube Water cooled Condensers and Shell and tube Chillers, Microprocessor Controllers. Electronic ...
Annual Maintenance to Centralized Air-conditioning System -day to day monitoring of the Air-conditioning equipments installed, operate the entire Air-conditioning System, note down essential parameter...
Annual Maintenance as per original equipment manufacturers standards, by taking preventive measures as per the equipment manufacturers manual, so that the system is functioning properly. - Centrifugal...
Annual Maintenance as per original equipment manufacturers standards, by taking preventive measures as per the equipment manufacturers manual, so that the system is functioning properly. - Round Bottl...
Annual Maintenance as per original equipment manufacturers standards, by taking preventive measures as per the equipment manufacturers manual, so that the system is functioning properly. - cabinet typ...
Annual Maintenance as per original equipment manufacturers standards, by taking preventive measures as per the equipment manufacturers manual, so that the system is functioning properly. - cabinet typ...
CHILLER PANEL HVAC- Annual maintenance by ensuring Power supply-voltage & current, frequency, equipment temperature, noise level, current Flow, terminations, & other essential parameters are at mainta...
AHU Sub-Distribution Pane- Annual maintenance by ensuring Power supply-voltage & current, frequency, equipment temperature, noise level, current Flow, terminations, & other essential parameters are at...
AHU Control Panel-Annual maintenance by ensuring Power supply-voltage & current, frequency, equipment temperature, noise level, current Flow, terminations, & other essential parameters are at maintain...
Supply & fixing of Weather proof Push Button station-Illuminated On/off Push Button - 2/4Sets preferable made of F RP enclosure with start/stop push button and On indicating lamps . (Stop push button ...
Annual Maintenance to Split / Cassette / Pedestal mount Air conditioners - as per original equipment manufacturers standards, by taking preventive measures as per the equipment manufacturers manual, s...
Supplying .litres capacity vertical/horizontal type wall mounting Electrical water heater with 22 SWG copper/SS sheet metal inner Container tinned inside Fiber body outside, filled with glass wool bet...
Erection charges for fixing a ... litres capacity wall mounting electric geysers using bolts, flat at one end nut and washers at the other end for through bolts and nuts and washers with 150x450x600mm...
Supplying of recess mounting non integral type LED luminaire comprising of pressure decast/extruded aluminium housing, with spring loaded false ceiling clamps, Power LEDs with CCT 6500...
Fixing all types and all capacities of 1x4/ 2x2 LED Light fittings indoor on the wall / ceiling / rafters / girders with necessary supporting frame, using 2310.0076" twin twisted PVC ...
Supplying and installation of insulated refrigerant copper tubing of 5/8 inches and 3/8 inches with polythene foam insulation 3 core 80 stand copper wiring between indoor ...
Supplying and fixing capacitor's (of approved make) for window /split air conditioners. 2023-24 - PWD-Electrical - Uni SR- Item code -6.16.1. 25 to 45mfd running capacitor.
---- including cost and co...
Supplying and fixing capacitor's (of approved make) for window /split air conditioners. 2023-24 - PWD-Electrical - Uni SR- Item code -6.16.- 80 to 200mfd starting capacitor. ---- including co...
Supplying & fixing relay for over load protection for window and split air conditioners. 2023-24 - PWD-Electrical - Uni SR- Item code -6.17 ---- including cost and conveyance of all materials, labour ...
Supplying and fixing the fan motor for blowers and condenser of 1/5 HP, single shaft/double shaft suitable for split / window air conditioners. 2023-24 - PWD-Electrical - Uni SR- ...
Supplying & fixing of thermostat for window type air conditioner.Multi range 30 to 60 degree Centigrade (without probe), adjustable universal type. 2023-24 - PWD-Electrical - Uni ...
Supply and installation of Tarpaulin canvas between the AC duct and AC evaporator unit including accessories. 2023-24 - PWD-Electrical - Uni SR- Item code -6.27 ---- including cost and conveyance of a...
Supplying & filling refrigerant latest R-410 / R-32 for air conditioning equipment's. Which includes the labour & Nitrogen gas for pressure and leak testing. 2023-24 - PWD-Electrica...
Supplying and commissioning of AC Remote 2023-24 - PWD-Electrical - Uni SR- Item code -6.33 ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the s...
Supplying and fixing of fan blade. 2023-24 - PWD-Electrical - Uni SR- Item code -6.34 ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the succes...
Supplying, installation, testing & commissioning of 12V .AH batteries in poly propylene container for D.G. sets. Low maintenance batteries, plate type.2023-24 - PWD-Electrical - Uni SR- Item code -9.4...
Servicing of calibration and Fine Tuning of fuel injectors of a) 500KVA DG Set (AQR) ---- ---All the items includes with all Leads and Lifts, Loading and Unloading, Cost of materials, Labour, Hiring o...
Supplying of white petroleum jelly (AQR) - -All the items includes with all Leads and Lifts, Loading and Unloading, Cost of materials, Labour, Hiring of machineries as per Standard specifications and ...
Charges for calibration and Fine Tuning of fuel Pumps of f) 500 KVA to 750 KVA DG Set (AQR) SE ltr no:2008 dt:10.06.2014 SL No(3)f -All the items includes with all Leads and Lifts, Loading and Unloadi...
Supplying and installation of electronic timer for start, stop running time delay and start failure for DG Set (AQR) ---- ---All the items includes with all Leads and Lifts, Loading and Unloading, Cos...
Supplying and filling of distilled water for batteries (AQR) ---- ---All the items includes with all Leads and Lifts, Loading and Unloading, Cost of materials, Labour, Hiring of machineries as per Sta...
Supply and fixing of radiator fan drive belts ISI approved for DG Set (AQR) SE ltr no:2008 dt:10.06.2014 SL No(1) f) 500 KVA to 750 KVA DG Set -All the items includes with all Leads and Lifts, Loading...
Charges for servicing of Diesel Engine for replacements of following items such as old oil removing from crank case, cleaning of crank case, changing of lube oil filters, changing of lube oil bypass f...
Charges for servicing and lubrication of alternator for existing DG Sets (AQR) SE ltr no:2008 dt:10.06.2014 SL No(7) f) 500 KVA to 750 KVA DG Set. -All the items includes with all Leads and Lifts, Loa...
Chargeds for servicing with replaceing of carbon brushes to self startyer for existing DG Sets f) 500 KVA to 750 KVA DG Set. (AQR) SE ltr no:2008 dt:10.06.2014 SL No(8) -All the items includes with al...
Supply and fixing of water temperature safety switch for DG Set it includes the cost of all approved materials lead lift and transportation etc. (AQR) ---- ---All the items includes with all Leads and...
Supply and fixing of Lube oil pressure safety switch. It includes the cost of all approved materials lead lift and transportation etc.(AQR) ---- ---All the items includes with all Leads and Lifts, Loa...
Supply and fixing of Coolant water sensor. It includes the cost of all approved materials lead lift and transportation etc. (AQR) ---- ---All the items includes with all Leads and Lifts, Loading and U...
Supply and fixing of Diod kit for alternator. It includes the cost of all approved materials lead lift and transportation etc. (AQR) a)500 KVA DG Set (AQR) ---- ---All the items includes with all Lead...
Charges for servicing of auxiliary contactor, relay, timer testing of connections of all contactor relay timers and general checkups of control circuit of main change over panel. Periodically mainten...
Testing of 250/500/750KVA DG set for Insulation resistance, Earth Resistance, Protection Relays, Earth Resistance of Neutral & Body Earth Electrodes etc., has to be carried out & Reports shall be fur...
supplying of 15/40 multi grade Engine Lubricating oil SE:BC:AE-4:13-14/10271 Dt.1.03.2014 SL No.4 ---- including cost and conveyance of all materials, labour and other incidental charges necessary for...
Servicing the radiator duly cleaning using acid and bracing for leakage etc, Complete SE:BC:AE-4:13-14/10271 Dt.1.03.2014 SL No.7 ---- including cost and conveyance of all materials, labour and other...
Supplying and replacing the battery cable set with terminals. SE:BC:AE-4:13-14/10271 Dt.1.03.2014 SL No.8 ---- including cost and conveyance of all materials, labour and other incidental charges nece...
Supplying and replacing Nozzel return pipe SE:BC:AE-4:13-14/10271 Dt.1.03.2014 SL No.12
---- including cost and conveyance of all materials, labour and other incidental charges necessary for the succ...
Supplying and fixing exhaust flexible pipe below 2'-3'.SE:BC:AE-4:13-14/10271 Dt.1.03.2014 SL No.13 ---- including cost and conveyance of all materials, labour and other incidental charges necessary f...
Supplying and replacing Air filter. SE:BC:AE-4:13-14/10271 Dt.1.03.2014 SL No.15 ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful c...
Calibration of Current Transformers having CT Ratios of 800/5/1, 600/5/1, 400/5/1 & 200/5/1 etc for identification of wires, ferruling, Testing of insulators, Polarity, Ratio to be furnished. (AQR)SE ...
Calibration of Energy meters Transformers having CT Ratios of 800/5/1, 600/5/1, 400/5/1 & 200/5/1 etc for identification of wires, ferruling, Testing of insulators, Polarity, Ratio to be furnished. ...
Testing of 250/500/750KVA Oil/Dry Type Distribution Transformer's Transil Oil, BDV, Silica Gel, Winding Temperature, Insulation Resistance, Earth Resistance, Protection Relays, Sealing of HT Cable Ent...
Servicing of HT & LT Panels which includes the testing of insulation resistance of cables, Testing of Relays, Control operations closing , tripping, etc, Interlocks, Alarm, Annunciatation and indicat...
Testing of 11KV Vaccum/SF6/Oil Circuit Breaker's Relays such as over Current relay, Earth Fault Relay & Trip Supervision Relay/Master Trip Relay etc., has to be carried out & Reports shall be furnish...
Supply & Fixing of An Ambient Temperature Monitor having Digital display (AQR)SE ltr no:SE:BC:AE-3:4063/2018-19 Dt 05-12-2018 SL No(8) ---- including cost and conveyance of all materials, labour and o...
Servicing of MCCB with control contacts operating mechanism and termination etc. main panel periodically maintenance for every six months of following of capacity (AQR) SE ltr no:2008 dt:10.06.2014 ...
Charges for servicing of Air circuit breakers of following cleaning of ACB arcing contacts , main contactors / arc cuts testing of manual spring change motor, assembly testing of tripping coils and l...
d) 800amps to 1000 amps 4 pole electrically operated draw out ACB (AQR) SE ltr no:2008 dt:10.06.2014 SL No(13d) ---- including cost and conveyance of all materials, labour and other incidental charg...
Servicing of MCCB with control contacts operating mechanism and termination etc. main panel periodically maintenance for every six months of following of capacity (AQR) b) 100/200/250 amps 3 pole MCCB...
Providing filtration of transformer oil. Purification with Drying process by heating the oil to maximum temperature of 90 degree Celsius and removing acidic residues, separation of oil and water and s...
Skilled labor/ Technician for Centralized Air Condition operator. Basic rate 633+ VDA 69=702.89 = Contractor profit @ 10% Incidental Charges 10% 70.28=70.28-= 850.50 2 Shift x 4 Person x 292 days = 58...
Skilled labor/ Technician for Centralized Air Condition operator. Basic rate 633+ VDA 69=702.89 = Contractor profit @ 10% Incidental Charges 10% 70.28=70.28-= 850.50 1 Shift x 1 Person x 73 days = 73 ...
Skilled labor/ Technician/Electrician for electrical works. Basic rate 633+ VDA 69=702.89 = Contractor profit @ 10% Incidental Charges 10% 70.28=70.28-= 850.50 2 Shift x 1 Person x 292 days = 584 Man ...
Skilled labor/ Technician/Electrician for electrical works. Basic rate 633+ VDA 69=702.89 = Contractor profit @ 10% Incidental Charges 10% 70.28=70.28-= 850.50 1 Shift x 1 Person x 73 days = 73 Man da...
Un Skilled Helper for Centralized Air Condition and Electrical works. Basic rate 600.57+ VDA 69.05=669.61 = Contractor profit @ 10% =66.96 + Incidental Charges 10% 66.96= 810.23 for 1 Persons. 2 Shift...
Un Skilled Helper for Centralized Air Condition and Electrical works. Basic rate 600.57+ VDA 69.05=669.61 = Contractor profit @ 10% =66.96 + Incidental Charges 10% 66.96= 810.23 1 Shift x 1 Person x 7...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
kppp 19174 kw-2 bid.docx
Tender Document • 0.91 MB
government notification bc loc letter to be issued by the bank (1)(1).pdf
Others - Bankers Certificate format • 1.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .