Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accepted |
| 2 | Accepted-Technical 44 WARD NO 3 INDRI 132041 | KARNAL | HARYANA | 132041 | Accepted-Technical Accepted |
Tender Value
₹91.2 L
EMD Value
₹45,595
Closing Date
19 May 2026, 9:30 amClosed
COMMISSIONER
MUNICIPAL COUNCIL, SRI GANGANAGAR
Construction of an RCC drain at the 10 MLD capacity STP (Sewage Treatment Plant) located at Eidgah.
2026_DLB_557331_15
NIT-04/2026-27
Open Tender
Civil Works
Percentage
180 days
MUNICIPAL COUNCIL, SRI GANGANAGAR
FIRM REGI, GST, TENDER, PROCESSING FEES, EMD, DD/CHALLAN PAYMENT COPY AND OTHER NECESSARY DOCS
2 documents required · 2 mandatory
₹1,500
COMMISSIONER
₹45,595
30 May 2026
8 May 2026
19 May 2026
8 May 2026
19 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.
In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.
Depth upto 1.5 m (RUIDP SOR 2023 Item No. 4.10.1) | 1,417.5 | Cum | 229.5 | ₹3,25,316.25 |
| 2 | Cleaning and removal of earth, silt, sludge, kankar, boulder, building material and garbage in existing nallah/drains including construction of bypass arrangement to bypass water with 1.5m lift from ground level and lead upto 50 m including foul & saturated condition where pumping out or bailing out of water is required, including shoring, shuttering where required and dewatering. Making access for disposal and dressing disposal side as per the directed of the Engineer.
For Depth upto 1.50 m (RUIDP SOR 2023 Item No. 35.22.1) | 756 | Cum | 406 | ₹3,06,936 |
| 3 | Carriage of Materials by mechanical transport including loading, unloading and stacking :: Earth upto 2 Km (RUIDP SOR 2023 Item No. 1.1.1) | 2,173.5 | Cum | 185.54 | ₹4,03,271.19 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:1:2 (1 Cement : 1 coarse sand : 2 graded stone aggregate 20 mm nominal size) (As per design mix)
(RUIDP SOR 2023 Item No. 23.1.1) | 424.05 | Cum | 6,410 | ₹27,18,160.5 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size).
(RUIDP SOR 2023 Item No. 21.1.5) | 130.5 | Cum | 5,000 | ₹6,52,500 |
| 6 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 3.5 metre above plinth level including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete.
(RUIDP SOR 2023 Item No. 22.1.1) | 129 | Sqm | 236.5 | ₹30,508.5 |
| 7 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 3.5 metre above plinth level including strutting, propping etc. and removal of form for :
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
(RUIDP SOR 2023 Item No. 22.1.2) | 3,901 | Sqm | 367 | ₹14,31,667 |
| 8 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 3.5 metre above plinth level including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform
(RUIDP SOR 2023 Item No. 22.1.3) | 15 | Sqm | 456 | ₹6,840 |
| 9 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars.
(RUIDP SOR 2023 Item No. 23.19.6) | 38,940.47 | Kg. | 83.3 | ₹32,43,741.15 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.92 MB
NIT04.pdf
Tender Documents • 1.91 MB
BOQ_992240.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .