Tender ID
Tender Value
₹46.6 L
EMD Value
₹93,300
Closing Date
23 Mar 2026, 3:00 pmClosed
ACHYUTANAND SINGH
EE BOUNSI
BOUNSI
PRABHU NARAYAN SINGH
SE
Jungle Clearance work at different location of Chandan high level main canal, Kushmaha Distributary & Chihar Distributary and strenghtening of canal bank, Soft rock cutting in Kushmaha Distributary from 0.72 to 1.17 km and Desiltation work of CHLMC from 31.70 to 32.27 km and desiltation work of Gahira Chir main canal from 0.00 to 2.37 km under irrigation division Bounsi (Banka).
127708
06/2025-26/ID BOUNSI/WRD-GROUP-02
Open Tender
CIVIL
Bhagalpur
• Bid Security (As per mentioned/specified in the NIT, Technical Checklist, Bid Document)
• Place of Registration
• Affidavit (Regarding statements made in the required attachments are true and correct)
• Time of Completion
• Registration
• I.T. & G.S.T. Registration & clearance Certificate
• Character Certificate
• Key Person
CIVIL
PERCENTAGE
L1
1
8 documents required · 8 mandatory
₹5,000
Processing Fee: 590
₹93,300
REFER NIT FOR THE SAME.
17 Mar 2026
17 Mar 2026
25 Mar 2026
18 Mar 2026
23 Mar 2026
18 Mar 2026
20 Mar 2026
Jungle clearance and weeding out shrubs including small tree up to 0.50M girth and removal as per specifications and direction of E/I. (5.1.3)
Earth work by excavator and spreader or tractor- leveler in lower level canal or flood embankment or dhar ( Like Minor, Sub -minor, Jamindari bundh, Pynes etc where tipper is not needed ) all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in ordinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead below 15 metre and with all lifts all complete jobas per specifications and direction of E/I. (5.1.47)
Earthwork by Mechanical means with help of Excavator, Tipper and Spreader in canal or flood embankment or dhar all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in ordinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod breaking and laying in layers properly with lead of 2.50 K.M. to 3.00 K.M. (lead will be considered as track path i.e. half of distance travelled in one cycle i.e. half of haulage path from pit to bank or embankment. Pit will be beyond 150 meter from centre of bank i.e. perpendicular distance from centre of bank to nearest boundry of pit will be more than 150 meter) and with all lifts all complete job as per specifications and direction of E/I. (Mode of measurement - Sectional measurement of compacted earth) (5.1.46)
5.1.46.1 (Lead in 0.15 -- 0.50 km)
5.1.46.2 (Lead in 0.50 -- 1.00 km)
5.1.46.4 (Lead in 1.50 -- 2.00 km)
Earth work in excavation in soft rock or ordinary rock ( where blasting is not required ) ( vide classification of soil item C )with initial lead of 30M and lift of 1.5M including dressing , making the sides in profile and dressing the bed in proper grade etc. all complete and as per specifications and direction of E/I. (5.1.13.2)
Jungle Clearance work at different location of Chandan high level main canal, Kushmaha Distributary & Chihar Distributary and strenghtening of canal bank, Soft rock cutting in Kushmaha Distributary from 0.72 to 1.17 km and Desiltation work of CHLMC from 31.70 to 32.27 km and desiltation work of Gahira Chir main canal from 0.00 to 2.37 km under irrigation division Bounsi (Banka).
Items
Earnest Money
Bid Security Amount - Rs.
Time of Completion
Registration No.
Character Certificate
Affidavit in required format (Should be after the publication date of the NIT)
Key Personnel (Site Supervisor), Fresh Graduate in Civil or Diploma civil +03 yeas Exp. Or retired I.T.I Holder- 01 Nos
PAN No / GST Registration / Income Tax Return (Updated)
Description
Jungle clearance and weeding out shrubs including small tree up to 0.50M girth and removal as per specifications and direction of E/I. (5.1.3)
Earth work by excavator and spreader or tractor- leveler in lower level canal or flood embankment or dhar ( Like Minor, Sub -minor, Jamindari bundh, Pynes etc where tipper is not needed ) all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in ordinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly with lead below 15 metre and with all lifts all complete jobas per specifications and direction of E/I. (5.1.47)
Earthwork by Mechanical means with help of Excavator, Tipper and Spreader in canal or flood embankment or dhar all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in ordinary soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod breaking and laying in layers properly with lead of 2.50 K.M. to 3.00 K.M. (lead will be considered as track path i.e. half of distance travelled in one cycle i.e. half of haulage path from pit to bank or embankment. Pit will be beyond 150 meter from centre of bank i.e. perpendicular distance from centre of bank to nearest boundry of pit will be more than 150 meter) and with all lifts all complete job as per specifications and direction of E/I. (Mode of measurement - Sectional measurement of compacted earth) (5.1.46)
5.1.46.1 (Lead in 0.15 -- 0.50 km)
5.1.46.2 (Lead in 0.50 -- 1.00 km)
5.1.46.4 (Lead in 1.50 -- 2.00 km)
Earth work in excavation in soft rock or ordinary rock ( where blasting is not required ) ( vide classification of soil item C )with initial lead of 30M and lift of 1.5M including dressing , making the sides in profile and dressing the bed in proper grade etc. all complete and as per specifications and direction of E/I. (5.1.13.2)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT NO. 06-25-26 (1).pdf
NIT • 2.84 MB
corrigendum letter 410 (1).pdf
NIT • 0.43 MB
Reference Letters.doc
NIT • 35.61 MB
NIT NO. 06-25-26 (1).pdf
NIT • 2.84 MB
corrigendum letter 410 (1).pdf
NIT • 0.43 MB
200.pdf
NIT • 0.38 MB
boq 12.xlsx
NIT • 0.02 MB
TECHNICAL SHEET GR02.xls
NIT • 0.02 MB
Technical bid Group 02.doc
NIT • 1.39 MB
boq 12%.pdf
NIT • 1.34 MB
boq 12.xlsx
NIT • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .