| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAccepted-AOC | ₹6.5 L | L1 | Accepted-AOC lowest rate quoted by the tenderer hence the tender is accepted |
| 2 | L2₹6.6 LRejected-AOC OLD NO 10 B NEW NO 39 3RD MAIN ROAD RAJALAKSHMI NAGAR VELACHERY CHENNAI 600 042 | CHENNAI | CHENNAI | TAMIL NADU | 600042 | ₹6.6 L | L2 | Rejected-AOC higher rate quoted compared to lowest tenderer quoted rate |
| Sl No | Description | Qty | Unit | S.P Muthu Constructions L2 | M.S.V. CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling, removing and carefully stacking the carpet from the floor, cleaning the area and clearing away the same from the premises etc., complete complying with standard specification and as directed by the departmental officers at the site of work. | 560 | m2 | 45 ₹25,200 | 44 ₹24,640 |
| 2.00 | Labour charges for dismantling and removing the table provided for legislative assembly setup in multipurpose hall and stacking them for reuse without any damage including head load from 3rd floor to Ground floor as per the instruction of the departmental officers at the site of work. The rate also includes for removal of table top frill cloth, foam sheet, side flex with frame arrangements etc., complete. | 145 | RM | 315 ₹45,675 | 314 ₹45,530 |
| 3.00 | Labour charges for dismantling and removing the wooden platform base of size 4' x 4' with gallery arrangements provided to legislative assembly set up in multipurpose hall and stacking them for reuse without any damage including head load from third floor to ground floor as directed by the departmental officers at the site of work. The rate also includes charges for removal of wooden base from 3" to 24" depth, bolts and nuts etc., complete complying with standard specification and as directed by the departmenta; officers at the site of work. | 500 | m2 | 590 ₹3.0 L | 580 ₹2.9 L |
| 4.00 | Cleaning the glass partition both side with cleaning materials such as glass cleaning liquid, wipers with moving aluminium scaffolding 4'-0" x 4'-0" to a height of 50'-0" feet height with heavy ladder arrangements including labour charges etc., complete complying with standard specification and as directed by the departmental officers at the site of work. | 4 | Job | 45,000 ₹1.8 L | 43,500 ₹1.7 L |
| 5.00 | Renewing the damaged cover slab of size 800mm x 800mm with new one(Heavy Duty) of approved make including cost of labour and conveyance charges etc., complete complying with standard specificfation and as directed by the departmetnal officers. | 5 | No | 3,250 ₹16,250 | 3,000 ₹15,000 |
| 6.00 | GST at 18% | 1 | Nos | 1,01,182.5 ₹1.0 L | 98,850.6 ₹98,850.60 |
Tender Value
Refer Docs
EMD Value
₹6,500
Closing Date
13 Feb 2026, 3:00 pmClosed
Executive Engineer
Executive Engineer Buildings C and M South Presidency Division Chepauk Chennai 5
Renewing the existing Assembly setup and other repair works to use of meeting hall in near Omandurar College side of multipurpose hall in third floor of Kalaivanar Arangam at Wallajah Salai Chennai 02
2026_PWD_654494_1
TNPWD/48-06/21M/2025-2026
Open Tender
Civil Works
60 days
Wallajah road Chennai
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹6,500
19 May 2026
10 Feb 2026
13 Feb 2026
10 Feb 2026
13 Feb 2026
10 Feb 2026
Dismantling, removing and carefully stacking the carpet from the floor, cleaning the area and clearing away the same from the premises etc., complete complying with standard specification and as directed by the departmental officers at the site of work.
Labour charges for dismantling and removing the table provided for legislative assembly setup in multipurpose hall and stacking them for reuse without any damage including head load from 3rd floor to Ground floor as per the instruction of the departmental officers at the site of work. The rate also includes for removal of table top frill cloth, foam sheet, side flex with frame arrangements etc., complete.
Labour charges for dismantling and removing the wooden platform base of size 4' x 4' with gallery arrangements provided to legislative assembly set up in multipurpose hall and stacking them for reuse without any damage including head load from third floor to ground floor as directed by the departmental officers at the site of work. The rate also includes charges for removal of wooden base from 3" to 24" depth, bolts and nuts etc., complete complying with standard specification and as directed by the departmenta; officers at the site of work.
Cleaning the glass partition both side with cleaning materials such as glass cleaning liquid, wipers with moving aluminium scaffolding 4'-0" x 4'-0" to a height of 50'-0" feet height with heavy ladder arrangements including labour charges etc., complete complying with standard specification and as directed by the departmental officers at the site of work.
Renewing the damaged cover slab of size 800mm x 800mm with new one(Heavy Duty) of approved make including cost of labour and conveyance charges etc., complete complying with standard specificfation and as directed by the departmetnal officers.
GST at 18%
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
BOQ_784797.xls
BOQ • 0.29 MB
CONDITION06.pdf
Tender Documents • 0.39 MB
Download all tender documents and submit your bid