Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.2 LAccepted-AOC 4 DALURBANDH PANDAVESWAR PANDAVESWAR BARDHAMAN WEST BENGAL 713346 UDYAM WB 03 0006114 | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | 1 | Accepted-AOC Eligible L-1 bidder | |
| 2 | 2₹3.2 L+₹1,018.25 (0.32%)Rejected-Finance VILL PO CHINCHURIA BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | 2 | Rejected-Finance quoted more than L-1 bidder | |
| 3 | 3₹3.2 L+₹1,207.85 (0.38%)Rejected-Finance CHINCHURIA MORE P O BAHULA DIST PASCHIM BARDHAMAN PIN 713322 W B | BAHULA | PASCHIM BARDHAMAN | WEST BENGAL | 713322 | 3 | Rejected-Finance quoted more than L-1 bidder |
Tender Value
₹2.9 L
EMD Value
₹3,700
Closing Date
17 Jan 2023, 5:00 pmClosed
AE EnM
ECL Sonepur Bazari Area
Erection of LT OH line along with installation of transformer near new OB dumps, 535 shovel, 536 Shovel, R-7 and R-6 at Sonepur Bazari open cast mine under S.B. Project
2023_ECL_266504_1
GM/SBA/EnM/e-tender/2022-23/ 638
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
ECL Sonepur Bazari Area
please refer tender documents
6 documents required · 6 mandatory
₹3,700
3 Mar 2023
6 Jan 2023
19 Jan 2023
7 Jan 2023
17 Jan 2023
7 Jan 2023
7 Jan 2023 - 10 Jan 2023
Amount
Item Description/ Heading
Material Cost
Material cost for erection 9/12 mtrs S.T. pole
Material cost for supply and fixing of nut, bolt and washer
Meterial cost for dismantling & refitting 230V 250/400W light complete set
Material cost for making of earth pit with supply of all required materials
Labour Cost:-
Labour cost for erection 9/12 mtr S.T. pole
Labour cost for fixing of MS bracket
Labour cost for fixing of Shackle insulator
Labour cost for drawing of ACSR rabbit conductor
Labour cost for fixing of nut, bolt and washer
Labour cost for dismantling, shifting of 6.6 KV/220 V LT transformer and reinstallation at other DP feeder12, feeder 14 and feeder 9.
Labour cost for installation of 6.6 KV/400 A 3 post GOS
Labour cost for shifting of telescope tower
Labour cost for erection of earth pit with supply of all required materials
Labour cost for dismantling & refitting 230V 250/400W light complete set
P. F. amount for labour cost
Total impact of GST for the purpose of CTC
JAY MAA DAL DALI KALI
PINAK RANJAN SADHU
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_275687.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .