Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.7 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹3.9 L+₹18,670.36 (5.09%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹3.9 L
EMD Value
₹7,800
Closing Date
8 Sept 2026, 6:00 pmClosed
XEN OFFICE REW JAMMU
XEN OFFICE REW JAMMU
Development of Graveyard alongwith boundary wall at Wno 1 Pyt Sagoon Block Nagrota District CAPEX Budget 2026-27 APDP ,Block Nagrota District Jammu
2026_RDPR_322653_11
e_NIT No. 492-REWJ of 2026-27 dated 31-08-2026
Open Tender
Civil Works
Percentage
60 days
XEN OFFICE REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹7,800
Yes
10 Oct 2026
31 Aug 2026
9 Sept 2026
31 Aug 2026
8 Sept 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil | 0.17 | cum | 479.3 | ₹81.48 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: 2.9.1 All kinds of soil : | 20.84 | cum | 256.85 | ₹5,352.75 |
| 3 | P/Laying of cement conct. 1:5:10( 1 cement :5coarse sand :10 graded stone aggregates 40mm) Of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. | 2.59 | cum | 4,826.5 | ₹12,500.64 |
| 4 | P/Laying of cement conct. 1:3:6( 1 cement :3 coarse sand :6 graded stone aggregates 20mm) Of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. | 10.71 | cum | 5,733.6 | ₹61,406.86 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level with 1:1.5:3 | 1.81 | cum | 7,788.4 | ₹14,097 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete | 181.25 | KG | 123.2 | ₹22,330 |
| 7 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and
similar works. | 182.07 | KG | 181.6 | ₹33,063.91 |
| 8 | Centering and shuttering including strutting,propping etc and removal of form work | 31.97 | cum | 286.35 | ₹9,154.61 |
| 9 | Brick work with common burnt clay F.P.S (non modualar) bricks of class designation 75 in foundation and plinth in Cement mortar 1:6 (1 cement: 6 coarse sand) | 15.77 | cum | 7,571.55 | ₹1,19,403.34 |
| 10 | Extra for brick work in superstructure above plinth level upto floor V level. | 15.77 | cum | 1,455.65 | ₹22,955.6 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
BOQ_1083246.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .