Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹58.5 LAccepted-Finance | ₹58.5 L | L1 | Accepted-Finance L1 BIDDER |
| 2 | L2₹59.9 LRejected-Finance NO 163 LAKSHMI AMMAN KOIL ST NEITHAVAYAL MINJUR PONNERI | PONNERI | TIRUVALLUR | TAMIL NADU | ₹59.9 L | L2 | Rejected-Finance L2 BIDDER |
| Sl No | Description | Qty | Unit | V S S Enterprises L2 | P.BHARATHIRAJA L1 |
|---|---|---|---|---|---|
| 1.00RENEWAL FROM AVOOR EDAKUPPAM ROAD TO KUMARANCHERRY VIA ILLUPAKKAM ROAD @ AVOOR PANCHAYAT IN MINJUR PANCHAYAT UNION. 0/0 - 3/800 UNDER RURAL ROAD MAINTENANCE/2025 - 2026/MJR01 | |||||
| 2.00 | Clearing the Scrub jungle removing from away site including incidential charges and all labour charges with burning and ashes including all labour charges etc,..complete. | 2,052 | SQ.M | 25 ₹51,300 | 6 ₹12,312 |
| 3.00 | Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A | 684 | CUM | 250 ₹1.7 L | 140 ₹95,760 |
| 4.00 | Applying tack coat over WBM surface (not treated with primer) using 4Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | 98.9 | SQ.M | 100 ₹9,890 | 68 ₹6,725.20 |
| 5.00 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal | 4.95 | CUM | 4,621.42 ₹22,876.03 | 4,621.42 ₹22,876.03 |
| 6.00 | Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | 14,250 | SQ.M | 34.09 ₹4.9 L | 34.09 ₹4.9 L |
| 7.00 | BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as
per specification using CMP as per clause 507 of MORTH Rev-5 | 356.25 | CUM | 12,010.04 ₹42.8 L | 12,010.04 ₹42.8 L |
| 8.00 | Provision for HM Stone Charges etc,.. | 15 | NOS | 574.65 ₹8,619.75 | 574.65 ₹8,619.75 |
| 9.00 | Provision for KM Board charges etc,.. | 3 | NOS | 2,197 ₹6,591 | 2,197 ₹6,591 |
| 10.00 | Provision for Sign Board | 8 | NOS | 4,999 ₹39,992 | 4,999 ₹39,992 |
Tender Value
₹59.1 L
EMD Value
₹60,000
Closing Date
17 Feb 2026, 3:00 pmClosed
BDO (BP) MINJUR BLOCK
MINJIUR BLOCK OFFICE
RENEWAL FROM AVOOR EDAKUPPAM ROAD TO KUMARANCHERRY VIA ILLUPAKKAM ROAD AT AVOOR PANCHAYAT IN MINJUR
2026_RDTN_654164_1
2486/2023/A2
Open Tender
Civil Works
180 days
MINJUR
CLASS IV AND ABOVE
5 documents required · 5 mandatory
₹0
₹60,000
Yes
23 Feb 2026
10 Feb 2026
17 Feb 2026
10 Feb 2026
17 Feb 2026
10 Feb 2026
RENEWAL FROM AVOOR EDAKUPPAM ROAD TO KUMARANCHERRY VIA ILLUPAKKAM ROAD @ AVOOR PANCHAYAT IN MINJUR PANCHAYAT UNION. 0/0 - 3/800 UNDER RURAL ROAD MAINTENANCE/2025 - 2026/MJR01
Clearing the Scrub jungle removing from away site including incidential charges and all labour charges with burning and ashes including all labour charges etc,..complete.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Applying tack coat over WBM surface (not treated with primer) using 4Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal
Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for HM Stone Charges etc,..
Provision for KM Board charges etc,..
Provision for Sign Board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.38 MB
Techinical_Bid_Building_MJR01.pdf
Tender Documents • 0.68 MB
Price_Bid_Building_MJR01.pdf
Tender Documents • 0.41 MB
BOQ_784409.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid