Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
₹18.7 L
EMD Value
₹37,400
Closing Date
22 Nov 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer PHED City Division Bharatpur
Executive Engineer PHED City Division Bharatpur
Reparing and Strengthening of R.C.C. OHSR of Capacity 315 kl Stagging 18 mtr and RCC CWR 225 kl at UWSS Nadbai, District Bharatpur
2021_PHCJA_247426_1
14/2021-22
Open Tender
Civil Works - Water Works
Turn-key
90 days
Bharatpur
As per Tender Document
2 documents required · 2 mandatory
₹500
Executive Engineer PHED City Division Bharatpur
₹37,400
Yes
30 Nov 2021
16 Nov 2021
23 Nov 2021
16 Nov 2021
22 Nov 2021
16 Nov 2021
90 days
Amount
Part -B Providing and laying polymer concrete (1:2:4) (1 part cement : 2 part coarse sand : 4 parts stone aggregate 12mm nominal size) duly mixed with polymer based cement modifier (powercrete PR-40 or equivalent) @ 5% of the wt. of cement used and plasticiser @ 100grm. per bag of cement after necessary application of polymer based cement modifier (powererete PR-40 or equivalent) as per the recommendation of the manufacturer. Thickness upto 50mm to 75mm
Providing and lying 20mm thick polymer mortar (1:3) 1 cement : 3 coarse sand) duly mixed with polymer based cement modifier (powercreate PR-40) or equivalent) @ of 5% of the wt. of cement uised and plasticizer, @ 100grm. per bag of cement after applying a polymer slurry coat (2 part cement after applying a polymer slurry coat ( 2 part cement : 1 part powercreate PR-40 or equivalent) as per the recommendations of the manufacturer.
Repair to damaged R.C.C. slab, beams and roof, columns etc. for strenghtening with cement mortor 1:2 in following steps. 1. chopping loose & cracked concrete to required depth. cleaning the exposed surface of steel & concrete with wire brush & sand blasting, papering, cleaning to concrete surface with water as necessary & getting dried 2. Applying Epoxy Primer on the exposed steel bars. 3. Applying Epoxy hardner & resin mix on concrete and steel bars with brush. 4. speading dry cement mortor 1:2 mix over Epoxy treated wet surface & allow it to dry for one day. 5. plastiring the surface with cement sand mortor 1:3 upto depth of 30 mm complete cure the plasterd surface for 15 days.
Providing, supplying, mixing and applying two coats of already to use two component polymer modified flexible cement based water proofing slurry like sike Top seal 107, or equivalent by brush after cleaning surfaces, the surface should be cleaned to remover all dust, foreign material, loose material or any deposit of contaminant, which could effect the bond between the surface and sika Top seal coating this can be done by scarfying, grinding, water blasting, sand blasting acid washing wire brush or any other approved method including dismantling loose plaster and repairing with cement send 1:4 mix with sika latex, a synthetic rubber emulsion diluted with water in a ration of 1:4 The rust from exposed reinforcement will be removed and Anticorrosive treatment with SikaArmatic will have to be done before coat of sika Top 107, The two Componenet of sika Top seal are to be mixed in the ration of 1:4 by weight and mixed properly until a slurry consistency is achieved, second Coat is to be protected from strong wind direct sunlight and should be curred with demphession or Gunny bage or polythene for at least two days as per instruction of manufacture and specified in the leaf - let curring should be done at least for 10 days.
Providing and applying two coats color less anti fungus, anti efforseence, water repellent treatment with silicone water repellent (DF, 105) or equivalent on the entire exterior surface of the structure of RCC reservoir to obtain the surface perfectly repellent to water all complete.
Epoxy guniting damaged R.C.C. slabs, beams, roof and columns for straightening with cement sand mortar 1:2 (1 cement: 2 sand) including preparing the surface, making ‘v’ shaped joints, cleaning the reinforcement bars with jet of potable water and drying with compressed air after applying 1st coat of Sika latex (bonding agent) and 2nd coat of Sikadour-32 epoxy 12mm stone aggregate 25mm thickness. Including cost of centering and shuttering and finishing to match the existing surface etc. complete, including providing M.S. welded mesh to gauge 25mm x 25mm framing with average thickness of 25mm.
Providing fabrication and fixing ventilation of the top of reservoir top. Size 1.20 mtrdia x 0.75 mtr height with wire gauge 14 mesh X 24 gauge to metal frame of rolled section by metal biding 20 x 3mm ( top,middle and bottom) side. With suitable screw and post of square bar 12mm and 4 nos of hole pass in fixing M20 cement concrete.
Opening & Refixing of wash out, over flow, supply pipe line from the inside SR Labbor charges.
Fabrication, supplying and fixing of water level indicator as per specification complete.
Fabrication, supplying and fixing of alluminium ladder inside tank as per specification.
Fabrication, supplying and fixing of alluminium manhole cover as per specification.
Providing and fixing lightening arrester including conductor of required length as per specification complete.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .