| Sl No | Description | Qty | Unit | M MURUGESAN AND CO L1 | PAVITHRA CONSTRUCTIONS & CONSULTANCY L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work open excavation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. Complying with Standard Specifications as per SS 20 B MORTH 24 & 25 | 114 | m3 | 123 ₹14,022 | 124 ₹14,136 |
| 2.00 | Plain Cement Concrete 1:4:8 Mix (one part of cement, four part of sand and eight part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with Standard Specifications as per TNDSS No. 28 V, VI (S2) V,VI (S5A) VII | 36 | m3 | 5,188 ₹1.9 L | 5,189 ₹1.9 L |
| 3.00Supplying and errecting steel centering to sides and soffits including supports and strutting for side wall sides and culvert body wall sides using M.S Sheets of size 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete Complying with Standard Specification as per TNDSS No.30&86 (For Drain,Deck slab & Retainingwall) | |||||
| 3.10 | SIDE WALL | 252 | m2 | 459 ₹1.2 L | 460 ₹1.2 L |
| 3.20 | SLAB | 31 | m2 | 1,023 ₹31,713 | 1,024 ₹31,744 |
| 4.00 | Vibrated Plain Cement Concrete 1:3:6 Mix (one part of cement, three part sand and six part of aggrigate) using 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with Standard Specification as per TNDSS No.30 & 86 | 36 | m3 | 5,918 ₹2.1 L | 5,920 ₹2.1 L |
| 5.00 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 24 | m3 | 6,638 ₹1.6 L | 6,640 ₹1.6 L |
| 6.00 | Reinforced Cement Concrete 1:1½:3 Mix (One Part of cement, one and half Part of M- Sand and three Part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications.(Using Vibrator) TNDSS NO: 30 V, VI (S3), VII-3. | 7 | m3 | 8,185 ₹57,295 | 8,200 ₹57,400 |
| 7.00 | Supplying and fabrication of steel and placing in position of TMT steel rods for RCC works as per design given including cost of steel and GI binding wire in all floors etc., complete complying with standard specification in TNDSS NO:97 V,VI (S6) VII (S6), VII-3 | 700 | Kg | 89.5 ₹62,650 | 90 ₹63,000 |
| 8.00 | Finishing the top of flooring with granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete | 39 | m2 | 160 ₹6,240 | 161 ₹6,279 |
Tender Value
₹10.5 L
EMD Value
₹21,000
Closing Date
10 Mar 2025, 3:00 pmClosed
EO
Kunnathur Town panchayat
Maintenance of Road with Drain at Ward no 10, Koyapanangadu street, Mounica Godown to Karuparayan Temple in Kunnathur Town Panchayat
2025_DTP_529789_1
181-1
Open Tender
Civil Works
Kunnathur
Maintenance of Road with Drain at Ward no 10, Koyapanangadu street, Mounica Godown to Karuparayan Temple in Kunnathur Town Panchayat
2 documents required · 2 mandatory
₹0
₹21,000
19 Mar 2026
4 Mar 2025
10 Mar 2025
4 Mar 2025
10 Mar 2025
4 Mar 2025
4 Mar 2025 - 10 Mar 2025
Amount
Earth work open excavation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. Complying with Standard Specifications as per SS 20 B MORTH 24 & 25
Plain Cement Concrete 1:4:8 Mix (one part of cement, four part of sand and eight part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with Standard Specifications as per TNDSS No. 28 V, VI (S2) V,VI (S5A) VII
Supplying and errecting steel centering to sides and soffits including supports and strutting for side wall sides and culvert body wall sides using M.S Sheets of size 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete Complying with Standard Specification as per TNDSS No.30&86 (For Drain,Deck slab & Retainingwall)
SIDE WALL
Vibrated Plain Cement Concrete 1:3:6 Mix (one part of cement, three part sand and six part of aggrigate) using 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with Standard Specification as per TNDSS No.30 & 86
Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Reinforced Cement Concrete 1:1½:3 Mix (One Part of cement, one and half Part of M- Sand and three Part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications.(Using Vibrator) TNDSS NO: 30 V, VI (S3), VII-3.
Supplying and fabrication of steel and placing in position of TMT steel rods for RCC works as per design given including cost of steel and GI binding wire in all floors etc., complete complying with standard specification in TNDSS NO:97 V,VI (S6) VII (S6), VII-3
Finishing the top of flooring with granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete
Providing and fixing Bitumen Pad for Expansion joint in between pavement slabs to 12mm thick and fixed as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent etc, complete as per standard specification
PAVITHRA CONSTRUCTIONS & CONSULTANCY (BID ID -1267222)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid