Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-Finance | L1 | Accepted-Finance Due to the urgency of the work this bid has been acepted |
Tender Value
₹2.5 L
EMD Value
₹4,950
Closing Date
24 Jan 2024, 3:00 pmClosed
EE Civil
2nd floor KTB Hanamkonda Warangal
Providing OD BTS Plinth inside the Tower Dismantling and removing of Shelter from CRPF Tower site including miscellaneous works
2024_BSNL_182021_1
NIT No 29 BCD WGL Civil Works in CRPF CompoundWGL
Open Tender
Civil Works - Buildings
Item Rate
60 days
Warangal
Please refer Tender documents.
7 documents required · 7 mandatory
₹590
A.O BSNL Warangl
₹4,950
29 Jan 2024
17 Jan 2024
27 Jan 2024
17 Jan 2024
24 Jan 2024
17 Jan 2024
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
1:5:10 (1 cement : 5 coarse sand(zone-III): 10 graded stone aggregate 40 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for :
Foundations, footings, bases of columns, etc. for mass concrete
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
Smooth finishing of the exposed surface of R.C.C. work with 6 mm thick cement mortar 1:3 (1 Cement : 3 fine sand).
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level with :
Cement mortar 1:6 (1 cement : 6 coarse sand).
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.
In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :
Two or more coats on new work.
Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in-charge.
Made of G.I. wire of dia 4 mm
Supplying and filling of moorum by mechanical transport up to a lead of 5 km, also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc., complete.
Dismantling/ dismembering of Pre fabricated shelter of size 3.13x2.14x2.75m including stacking the dismantled panels at site.The cost includes all labour charges, required tools and plants etc., complete and as directed by Engineer in charge.
Collection of BTS shelter materials from CRPF Compound and transportation to Thotlawada Stores in Warangal as directed by the Engineer-In-Charge. The entire lot of Shelter members shall be transported in a single lot. (Rate includes loading, unloading and all other incidental charges).
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .